Sizewell C nuclear power station is a project to construct a 3,200 MWe nuclear power station with two EPR reactors in Suffolk, England.[2] The project was proposed by a consortium of EDF Energy and China General Nuclear Power Group, which own 80% and 20% of the project respectively. In 2022, UK Government announced a buy-out to allow for the exit of CGN from the project and forming a 50% stake with EDF, though EDF expect this to fall below 20% following anticipated external investment.[3][1] As of 30 June 2024, the project is 76.1% owned by the UK Government and 23.9% owned by EDF.[4] The power station is expected to meet up to 7% of the UK's demand.[5][6]
Sizewell C nuclear power station (SZC) | |
---|---|
Country | England, United Kingdom |
Location | Suffolk, East of England |
Coordinates | 52°12′54″N 1°37′11″E / 52.215°N 1.61972°E |
Status | Awaiting final investment decision |
Construction cost | £20–35 billion[1] |
Owners | EDF Energy (50%), UK Government (50%) |
Operator | NNB Generation Company |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Framatome |
Cooling source | Sea water from North Sea |
Thermal capacity | 2 × 4,524 MWth (planned) |
Power generation | |
Make and model | EPR |
Units planned | 2 × 1,630 MWe |
Nameplate capacity | 3,260 MWe (planned) |
External links | |
Website | www |
The project is expected to commence in 2024,[7] with construction taking between nine and twelve years, depending on developments at the Hinkley Point C nuclear power station, which is also being developed by EDF Energy and which shares major similarities with the Sizewell plant.
History
editIn 2008, the government decided that new nuclear sites should be constructed on existing sites to replace the UK's ageing fleet of reactors.[8] In 2010 the government revealed that the Sizewell power station site was one of the eight locations at which it intended to allow the development to occur.[9] Following this, EDF Energy put forward proposals for the Sizewell site in November 2012, where it planned to construct two EPR reactors.[10]
In 2015, as a part of the government's strategy to open the UK up to China, it was reported that after talks with China agreements had been made to develop three nuclear power plants including Sizewell C, Hinkley Point C and Bradwell B; however, agreements had not yet been made over financing the Sizewell project, with the final agreement likely to be made after the construction of Hinkley Point C had started.[11]
On 21 October 2015, EDF Energy announced that it had 'agreed the Heads of Terms of a wider UK partnership for the joint development of new nuclear power stations at Sizewell in Suffolk and Bradwell in Essex' with China General Nuclear Power Group (CGN). At the same time, EDF Energy also announced that it 'will take an 80% share and CGN will take a 20% share' during the development phase of the project.[12]
Following extensive consultation with the local community, on 27 May 2020 EDF Energy announced that it had submitted a development consent order application.[13] EDF stated that 25,000 job opportunities would be created and targeted 70% of the investment to be spent in UK. The plant would largely replicate the Hinkley Point C design to reuse experience and attempt to lower costs.[14]
In June 2020, EDF had yet to organise financing, and could not take on more construction risk in the UK. EDF was looking to the UK government to assist with financing either by offering a Regulated Asset Base (RAB) model used on less risky infrastructure, though that puts an immediate cost burden on end consumers, or with other approaches such as a government equity stake in the development.[15]
On 30 June 2020, EDF Energy announced that it had applied to the Office for Nuclear Regulation (ONR) for a licence to build and operate Sizewell C. The ONR is responsible for the safe operation of nuclear sites in the UK and for permitting new nuclear site licences – one of the key regulatory requirements for building and operating a new power station.[16]
On 11 September 2020, Suffolk county council said that it could not support the plans for the construction of Sizewell C in its current form,[17] with the council saying on 23 October 2020 that the plans "do not go far enough" to mitigate the impact on the local community and on the local environment. The council said that a lack of support for the project was not the issue, and that it is that EDF "simply does not appropriately and sensitively address the impacts on our communities and the environment".[18] EDF responded by submitting significant changes to the project which aimed to significantly reduce the number of Heavy Goods Vehicles delivering the materials required for the project by having them delivered by train and sea instead. The plans also proposed to increase the amount of land for the creation of fen meadow to help increase the net gain of biodiversity following the completion of the project. A consultation period began on 16 November 2020, which lasted for 30 days and which will inform all of the stakeholders in the project about the proposals.[19]
On 31 October 2020, the BBC claimed that the government was 'close' to giving the project the green light following intensified talks with EDF, with government officials insisting that it "remains committed to new nuclear" following the withdrawal of Horizon from Wylfa and Oldbury. The BBC also reported that the government had increased its interest in taking a stake in the project following work on the second reactor at Hinkley Point C being completed 30% faster than the first reactor, which 'is thought to have substantially mitigated' the risk in taking a stake in the project.[20][21]
On 14 December 2020, the UK government published an energy white paper setting out its plans to "transition to net zero",[22] and announced the start of negotiations with EDF, with a view to starting investment on "at least one" new power station before the end of the current parliament in 2024.[23] CGN is thought to be planning to withdraw from the project.[24]
On 20 July 2022, the planning application was approved and a Development Consent Order was issued by the Secretary of State.[25]
On 3 November 2022, the plant was placed under review in the government's effort to cut spending.[6] Chancellor of the Exchequer Jeremy Hunt confirmed on 17 November 2022 that construction would go ahead, with initial contracts to be signed "within weeks".[26] Security concerns about China caused the government to buy CGN out of the development for just over £100 million in late 2022, leaving it co-owned by EDF and the UK government.[27]
Timeline
editStage | Status | Date Completed | Notes |
---|---|---|---|
Statement of community consultation | Completed | 2012 | [28] |
Stage 1 consultation | Completed | 6 February 2013 | [29] |
Updated statement of community consultation | Completed | November 2016 | [30] |
Stage 2 consultation | Completed | 3 February 2017 | [31] |
Stage 3 consultation | Completed | 29 March 2019 | [32] |
Stage 4 consultation | Completed | 27 September 2019 | [33] |
Review of Stage 4 responses | Completed | - | |
Application submission | Completed | 24 June 2020 | [34] |
Decision | Completed | 20 July 2022 | [25] |
Construction | Not Yet Started | - | |
Operation | Not Yet Started | - |
Construction
editThe Sizewell C project is expected to take between nine and twelve years to construct and commission.[35] EDF expects significant time and cost savings compared to the near-identical sister plant, Hinkley Point C.[citation needed] The projected construction cost of £20 billion (including "expected inflation and contingencies") for Sizewell C in the 2020 development consent submission[36] is 25% higher than the £16 billion (2012 prices) projected for Hinkley Point C during the planning process.[37] Note that the £20 billion figure was calculated by inflation adjusting 80% of the cost estimate of Hinkley Point C at that time.[38]
Financing
editThe Sizewell C project is expected to cost £20 billion to £30 billion.[36][38][39] The project was initially led by EDF Energy and CGN, which in 2020 owned 80% and 20% of the project, respectively.[12]
EDF is looking to the UK government to assist with financing either by offering a Regulated Asset Base model, though that puts an immediate cost burden on end consumers, or with other approaches such as a government equity stake in the development, as the company is unwilling to take on further risk within the UK.[15] On 30 June 2020, EDF announced that it had applied to the Office for Nuclear Regulation for a licence to build and operate Sizewell C.[40]
On 14 July 2020, 32 companies and organisations from the UK nuclear supply chain formed a consortium to encourage the government to support the state-guaranteed financing model for Sizewell C,[41] Regulated Asset Base, which the consortium says would reduce the cost of new nuclear projects by having consumers pay the cost upfront through their energy bills.[42]
On 30 September 2020, Jean-Bernard Lévy, EDF's chairman and CEO, demanded that the Treasury provided clarity on the future of nuclear funding following Hitachi's withdrawal from the Wylfa Newydd nuclear power station project which was set to cost £20 billion, citing a lack of viable funding.[43][44]
On 14 December 2020, following the release of the UK government's long-awaited energy white paper, the government announced that it had started consultations with EDF to take a stake in the project following concerns that CGN is backing out of the project, which would leave a financing gap. The government also warned that any stake in the project would be 'subject to approval on areas such as value for money and affordability' with the Secretary of State for Business, Energy and Industrial Strategy, Alok Sharma, saying, "We are starting negotiations with EDF, it is not a green light on the construction".[45]
In January 2022, the UK government invested £100 million towards continued development of the project.[46] In March 2022, it was announced that the UK government and EDF would each take a 20% stake in the project, with infrastructure investors and pension funds expected to take up the remaining 60%.[47] Funding was also agreed to improve local activities, courtesy of the Sizewell C and the East Anglia Array projects.[48]
In August 2022, The Guardian reported expected costs were £20 billion to be paid with £1.7 billion of taxpayer money and a surcharge on customer energy bills through the Regulated Asset Base model. Barclays had been hired to find new financial backing.[49]
In November 2022, the UK government announced that it was taking over a 50% stake in the project for £679 million.[3] In February 2023, EDF confirmed that following anticipated external investment its shareholding in the project will be no more than 19.9%. Project costs estimates vary from £20 billion to £35 billion.[1]
In September 2023, the UK government issued a pre-qualification questionnaire to prospective investors; successful applicants will be invited to participate in the bidding process. The government have made an additional £511 million available for project development and site preparation ahead of the bidding process.[50]
In January 2024, the UK government announced £1.3 billion of additional funding for the project for infrastructure work such as roads and rail lines, allowing construction work to progress prior to the final investment decision being made.[51][52]
Criticism and opposition
editOpposition groups
editGroups that opposed the construction of the plant include Together Against Sizewell C (TASC) and Stop Sizewell C.[53]
TASC sought a judicial review of the East Suffolk Council's decision to grant planning permission in September 2019 for preparatory works on the site, which would involve the felling of 229 trees as well as the demolition of buildings on the Sizewell B site. The group claimed that the decision was unlawful and that proper investigations into the potential scale of environmental damage had not occurred.[54] The bid to block the works was brought to the High Court on behalf of TASC by a local resident and former Labour Suffolk county councillor, Joan Girling.[importance?] The court heard the case on 8 September 2020,[55] and ruled that the habitat loss would be "minor" and "not significant". Mr Justice Holgate rejected the attempt to block the works, and said that he "did not accept East Suffolk Council acted irrationally". An EDF spokesperson responded to the rulings by saying that "The judge acknowledged the robust nature of the report provided by East Suffolk Council regarding the environmental impact of the work. The report, which was informed by the council arboriculturist, found that the majority (73%) of the 229 trees that need to be removed from Coronation Wood are low quality plantation wood with a limited life expectancy and limited amenity value. It was judged that this loss would be 'balanced' by the planting of over 2,500 juvenile woodland trees, including a mixture of broadleaf and coniferous species appropriate for the prevailing soil and coastal conditions."[56]
On 6 October 2020, TASC and the Stop Sizewell C group delivered a petition with over 10,400 signatures to Downing Street,[57] the Treasury and the Department of Business, Energy and Industrial Strategy, calling for the government to stop Sizewell C as the plans would be costly, risky and would not positively contribute to net zero until 2040.[58][59]
Stop Sizewell C is the campaign name of Theberton and Eastbridge Action Group (TEAGS). TEAGS was formed in 2013 by representatives of the Suffolk parish of Theberton and Eastbridge, which neighbours the proposed Sizewell C construction site, in order to give a voice to the community. TEAGS did not initially oppose Sizewell C, but after eight years of engagement with EDF and other stakeholders, the group changed its name to Stop Sizewell C.[60]
In December 2023, the Court of Appeal ruled that the Government's decision to approve the site was lawful, following a challenge from Together Against Sizewell C which argued that the site would cause 'irreparable damage' to the Suffolk coast.[61] In May 2024, after an appeal by TASC, the Supreme Court refused to review the Court of Appeal decision as "the application does not raise an arguable point of law".[62]
Concerns regarding Chinese involvement
editConcerns have been expressed regarding one of the shareholders in the consortium,[63][64] CGN, which is owned by the Chinese government and has been blacklisted by the United States Department of Commerce for attempting to acquire advanced U.S. nuclear technology and material for diversion to military use.[65][66] In September 2020, following Hitachi's decision to withdraw from the Wylfa and Oldbury projects, the BBC reported that the UK government was looking to replace CGN as an investor and might take a stake in Sizewell C.[67]
Concerns regarding water consumption
editSome environmental campaigners and Sizewell critics have questioned if it will be possible to meet the plant's need for potable water without adversely impacting the supplies available to surrounding areas.[68] Figures released in early 2010 by the Sizewell A and B operators—Magnox Ltd and EDF, respectively—indicated that the two existing plants were consuming approximately 920 cubic metres (200,000 imp gal) of mains water each day, in addition to the 5,000,000 cubic metres (180,000,000 cu ft) of seawater that the operators are permitted to use for cooling systems that do not require treated water.[68] Critics estimated that Sizewell C would require a further 1,600 cubic metres (350,000 imp gal) of potable water daily, and suggested that EDF were planning to use the mains supply because it would be cheaper than the alternative of establishing a desalination plant. Essex and Suffolk Water, the mains-water supplier for the area, stated in response that they were satisfied that the water supply would be "sustainable" for the next 25 years even if Sizewell C were to be built.[68]
However, Essex and Suffolk Water later reversed its position, leading EDF to plan instead on using a temporary desalination plant to provide for construction water needs while also building a permanent 29-kilometre-long (18 mi) pipeline from the River Waveney to the Sizewell C site – but this plan was also halted when in August 2021 Essex and Suffolk Water informed EDF that the Environment Agency would be curtailing their licences to abstract water from the River Waveney by up to 60%.[69] The water company subsequently confirmed that "existing water resources (including the River Waveney) will not be sufficient to meet forecast mains water demand, including the operational demand of Sizewell C," leading EDF to declare that it would rely on a permanent desalination system supplying the plant's needs if no other solution could be found.[69] This was accepted by the Secretary of State for Business, Energy and Industrial Strategy, Kwasi Kwarteng, who held that "the uncertainty over the permanent water supply strategy is not a barrier to granting consent" to the Sizewell C project.[70]
On 8 August 2022, Together Against Sizewell C (TASC), supported by Friends of the Earth, announced its intention to contest the development consent order, based primarily on the failure to first secure a water supply. In its earlier rejection of the scheme, the Planning Inspectorate had stated that "unless the outstanding water supply strategy can be resolved and sufficient information provided to enable the secretary of state to carry out his obligations under the Habitats Regulations, the case for an order granting development consent for the application is not made out".[49]
Preference for other energy sources
editResearchers such as Professor Barrett et al at UCL claim, based on detailed cost studies, that a judicious mix of renewable energy, storage, hydrogen, and fossil fuel offers the same constant availability of power as Sizewell C, at lower cost.[71]
Economic impacts on the local area
editAldeburgh Town Council expressed concern about workers being attracted to jobs at the Sizewell C site. "Aldeburgh is a town with an economy firmly rooted in Tourism. … Businesses simply cannot match the offers being made by SZC and have already lost staff to higher paid opportunities – this was also experienced during the construction of Sizewell B."[72]
See also
editReferences
edit- ^ a b c Earl, Nicholas (18 February 2023). "EDF: Inflation drives Hinkley Point C nuclear plant costs from £26bn to £33bn". City A.M. Archived from the original on 20 February 2023. Retrieved 20 February 2023.
- ^ "Sizewell C proposals". Archived from the original on 29 June 2020. Retrieved 10 July 2020.
- ^ a b "UK government takes 50% stake, confirms backing for Sizewell C". World Nuclear News. 29 November 2022. Archived from the original on 1 February 2023. Retrieved 4 February 2023.
- ^ "EDF 2024 Half Year Results" (PDF). p. 34.
- ^ Thomas, Nathalie; Mancini, Donato Paolo (25 June 2020). "Cost of new Sizewell C nuclear plant put at £20bn". Financial Times. Archived from the original on 29 December 2021. Retrieved 29 December 2021.
- ^ a b Jack, Simon (4 November 2022). "Sizewell C new nuclear plant under review". BBC News. Archived from the original on 4 November 2022. Retrieved 4 November 2022.
- ^ "Court of Appeal dismisses anti-SZC claims". Sizewell C. 21 December 2023. Archived from the original on 9 January 2024. Retrieved 9 January 2024.
- ^ "New nuclear plants get go-ahead". BBC News. 10 January 2008. Archived from the original on 14 March 2009. Retrieved 11 July 2020.
- ^ "Nuclear power: Eight sites identified for future plants". BBC News. 18 October 2010. Archived from the original on 19 October 2010. Retrieved 11 July 2020.
- ^ "Initial Proposals and Options Consultation Document Summary". EDF Energy. November 2012. Archived from the original on 11 July 2020. Retrieved 11 July 2020.
- ^ "Hinkley Point nuclear agreement reached". BBC News. 21 October 2015. Archived from the original on 21 October 2015. Retrieved 11 July 2020.
- ^ a b "Agreements in place for construction of Hinkley Point C nuclear power station" (Press release). EDF Energy. 21 October 2015. Archived from the original on 11 July 2020. Retrieved 21 October 2020.
- ^ "Sizewell C submits planning application". Nuclear AMRC. 27 May 2020. Archived from the original on 11 July 2020. Retrieved 11 July 2020.
- ^ "Sizewell C submits planning application" (Press release). EDF Energy. 27 May 2020. Archived from the original on 27 July 2020. Retrieved 11 July 2020.
- ^ a b Nathalie Thomas; Jim Pickard (2 June 2020). "Plan for new UK nuclear plant under intense scrutiny". Financial Times. Archived from the original on 18 June 2020. Retrieved 11 July 2020.
- ^ "Sizewell C applies for a licence to build and operate in Suffolk". 30 June 2020. Archived from the original on 8 July 2020. Retrieved 8 July 2020.
- ^ "County Council unable to support plans for Sizewell C". Suffolk County Council. 11 September 2020. Archived from the original on 19 September 2020. Retrieved 16 October 2020.
- ^ "Sizewell C nuclear power station plans 'do not address local impact'". BBC News. 23 September 2020. Archived from the original on 11 October 2020. Retrieved 16 October 2020.
- ^ "Changes submitted for Sizewell C project to cut HGV construction traffic". East Anglian Daily Times. 16 October 2020. Archived from the original on 17 October 2020. Retrieved 16 October 2020.
- ^ Simon Jack (31 October 2020). "New nuclear plant at Sizewell set for green light". BBC News. Archived from the original on 31 October 2020. Retrieved 1 November 2020.
- ^ Will Jefford (31 October 2020). "Government 'close' to giving Sizewell C green light, reports say". East Anglian Daily Times. Archived from the original on 1 November 2020. Retrieved 1 November 2020.
- ^ "ENERGY WHITE PAPER Powering our Net Zero Future". Gov.uk. UK Government. 14 December 2020. Archived from the original on 18 December 2020. Retrieved 19 December 2020.
- ^ "UK to start talks with EDF on funding for Sizewell C : New Nuclear - World Nuclear News". www.world-nuclear-news.org.
- ^ "Sizewell C: Government in talks to fund £20bn nuclear plant". BBC News. 14 December 2020. Archived from the original on 14 December 2020. Retrieved 14 December 2020.
- ^ a b "The Sizewell C Project development consent decision announced". UK Government. 20 July 2022. Archived from the original on 20 July 2022. Retrieved 20 July 2022.
- ^ "Sizewell C nuclear plant to go ahead, chancellor confirms". ITV News. 17 November 2022.
- ^ Pickard, Jim (29 November 2022). "UK government to pay Chinese group £100mn to exit Sizewell C". Financial Times. Archived from the original on 23 October 2023. Retrieved 12 September 2023.
- ^ "Statement of Community Consultation". EDF Third Light. EDF Energy. 2012. Archived from the original on 23 October 2023. Retrieved 6 August 2020.
- ^ "Sizewell C stage one consultation". Archived from the original on 27 June 2020. Retrieved 11 July 2020.
- ^ "Updated Statement of Community Consultation" (PDF). East Suffolk Council. November 2016. Archived (PDF) from the original on 11 August 2021. Retrieved 6 August 2016.
- ^ "Sizewell C stage two consultation". Archived from the original on 29 June 2020. Retrieved 11 July 2020.
- ^ "Sizewell C stage three consultation". Archived from the original on 27 June 2020. Retrieved 11 July 2020.
- ^ "Sizewell C stage four consultation". Archived from the original on 27 June 2020. Retrieved 11 July 2020.
- ^ "Planning Inspectorate accepts Sizewell C planning application for examination". EDF Energy. Archived from the original on 6 August 2020. Retrieved 22 July 2020.
- ^ "Sizwell C Environmental, Social and Governance Commitments" (PDF). p. 2.
- ^ a b "The Sizewell C Project. 4.2 Funding Statement" (PDF). EDF Energy. May 2020. Retrieved 22 December 2022.
- ^ "Hinkley Point C contract terms - World Nuclear News". www.world-nuclear-news.org. Retrieved 8 August 2024.
- ^ a b Thomas, Nathalie; Mancini, Donato Paolo (25 June 2020). "Cost of new Sizewell C nuclear plant put at £20bn". Financial Times. Archived from the original on 29 December 2021. Retrieved 29 December 2021.
- ^ "Boris Johnson Approves Funding for Sizewell C Nuclear Plant". Bloomberg UK. The Press Association. 21 August 2022. Archived from the original on 21 August 2022. Retrieved 28 September 2022.
- ^ "Sizewell C applies for a licence to build and operate in Suffolk". Archived from the original on 8 July 2020. Retrieved 11 July 2020.
- ^ "New industrial consortium backs Sizewell C". Sizewell C supply chain. EDF. 14 July 2020. Archived from the original on 9 August 2020. Retrieved 23 July 2020.
- ^ "Sizewell C Consortium urges decision on funding". World Nuclear News. Archived from the original on 15 July 2020. Retrieved 15 July 2020.
- ^ "UK / Head Of EDF 'Demands Clarity' on Funding For New Nuclear Projects include Sizewell C". Neutron Bytes. 3 October 2020. Archived from the original on 4 October 2020. Retrieved 10 October 2020.
- ^ David Dalton (30 September 2020). "UK / Head Of EDF To 'Demand Clarity' On Funding For New Nuclear". NucNet. Archived from the original on 11 October 2020. Retrieved 10 October 2020.
- ^ Roger Harrabin & Simon Read (14 December 2020). "Sizewell C: Government in talks to fund £20bn nuclear plant". BBC News. Archived from the original on 18 December 2020. Retrieved 19 December 2020.
- ^ Dalton, David (27 January 2022). "UK / Government Invests £100m In EDF's £20bn Sizewell C Nuclear Power Station". The Independent Global Nuclear News Agency. Archived from the original on 29 April 2022. Retrieved 7 April 2022.
- ^ "Sizewell C nuclear power station: Government to take 20% stake". BBC News. 27 March 2022. Archived from the original on 7 April 2022. Retrieved 7 April 2022.
- ^ "Energy Projects Update" (PDF). East Suffolk District. Archived (PDF) from the original on 8 March 2023. Retrieved 22 July 2023.
- ^ a b Laville, Sandra (8 August 2022). "Sizewell C nuclear plant approval faces legal challenge". The Guardian. Archived from the original on 8 August 2022. Retrieved 8 August 2022.
- ^ "Private investment sought for Sizewell C project". World Nuclear News. 18 September 2023. Archived from the original on 19 September 2023. Retrieved 18 September 2023.
- ^ "Sizewell opponents apply to Supreme Court as government commits £1bn". BBC News. 23 January 2024. Archived from the original on 23 January 2024. Retrieved 23 January 2024.
- ^ "UK invests further GBP1.3bn to keep Sizewell C on schedule". World Nuclear News. 23 January 2024. Archived from the original on 25 January 2024. Retrieved 25 January 2024.
- ^ Jones, Ash (4 November 2022). "Suffolk protest groups Stop Sizewell C and Together Against Sizewell C welcome nuclear plant review plans". Archived from the original on 22 December 2022. Retrieved 22 December 2022.
- ^ "Sizewell: Nuclear campaigners' bid to save woodland rejected". BBC News. 8 October 2020. Archived from the original on 15 October 2020. Retrieved 9 October 2020.
- ^ "High Court Refuses TASC Coronation Wood appeal but TASC resolved to continue battle against Sizewell C development". Together Against Sizewell C. 1 October 2020. Archived from the original on 22 October 2020. Retrieved 10 October 2020.
- ^ Nadine Buddoo (7 October 2020). "Sizewell C spurred by High Court ruling on planning permission". New Civil Engineer. New Civil Engineer. Archived from the original on 9 October 2020. Retrieved 10 October 2020.
- ^ "STOP SIZEWELL C". Stop Sizewell C Petition. Archived from the original on 3 October 2020. Retrieved 10 October 2020.
- ^ "TASC & SSC deliver petition to No 10 with over 10,000 signatures 06/10/20". Together Against Sizewell C. 6 October 2020. Archived from the original on 22 October 2020. Retrieved 10 October 2020.
- ^ Katy Sandalls (6 October 2020). "Anti-Sizewell C campaigners deliver 10,000 signature petition to Downing St opposing n-power station". East Anglian Daily Times. Archived from the original on 9 October 2020. Retrieved 10 October 2020.
- ^ "Stop Sizewell C - About Us". Stop Sizewell C. 26 February 2014. Archived from the original on 13 November 2020. Retrieved 11 November 2020.
- ^ "Sizewell C nuclear power plant approval ruled lawful by Court of Appeal". Sky News. Archived from the original on 20 December 2023. Retrieved 20 December 2023.
- ^ "Supreme Court backs Sizewell planning permission". The Construction Index. 14 May 2024. Retrieved 14 May 2024.
- ^ "Spy warning on Chinese nuclear company". The Times. Archived from the original on 25 May 2019. Retrieved 23 July 2020.
- ^ Pagnamenta, Robin (24 January 2019). "Britain's nuclear industry is falling inexorably into Chinese hands". The Telegraph. Archived from the original on 10 July 2020. Retrieved 23 July 2020.
- ^ "China General Nuclear Power accused of espionage with its adviser in the US". South China Morning Post. 11 August 2016. Archived from the original on 10 July 2020. Retrieved 23 July 2020.
- ^ "Four China Nuclear Industry Companies Added to "Entity List"". Pillsbury Winthrop Shaw Pittman LLP. Archived from the original on 9 June 2020. Retrieved 23 July 2020.
- ^ Jack, Simon (16 September 2020). "Government could take stake in new nuclear station". BBC News. Archived from the original on 17 September 2020. Retrieved 17 September 2020.
- ^ a b c "Sizewell C 'threat to water supplies'". Beccles and Bungay Journal. Archant Community Media Ltd. 8 March 2010. Archived from the original on 27 July 2022. Retrieved 27 July 2022.
- ^ a b Atkins, William (27 July 2022). "A new nuclear power station needs a vast supply of water. But where will Sizewell C get it from?". The Guardian. Guardian News & Media Ltd. Archived from the original on 27 July 2022. Retrieved 27 July 2022.
- ^ Mettam, Fiona (20 July 2022). "PLANNING ACT 2008: APPLICATION FOR DEVELOPMENT CONSENT FOR THE SIZEWELL C NUCLEAR POWER STATION" (PDF). Letter to Carly Vince (NNB Generation Company (SZC) Limited). London: Department for Business, Energy and Industrial Strategy. EN010012. Retrieved 27 July 2022.
- ^ "Baseload nuclear power not needed in an all-renewable future". Claverton Group. Archived from the original on 21 July 2022. Retrieved 22 July 2022.
This reliability means that we can design systems at reasonable cost which use negligible amounts of fossil fuels for heat and electricity supply. Low-cost peaking fossil plant would be used in exceptional conditions.
- ^ "Sizewell C Main Development Site Forum" (PDF). 16 July 2024. p. 62.
External links
edit- Official website
- Sizewell C planning documentation on National Infrastructure Planning website.