You can help expand this article with text translated from the corresponding article in Turkish. Click [show] for important translation instructions.
|
Otoyol 33, O-33 or North Aegean Motorway (Turkish: Kuzey Ege Otoyolu) and abbreviated as the O-33 is a 55.2 km (34.3 mi) long toll motorway in western Turkey.Beginning at an intersection with İzmir Beltway, the O-33 runs north from Çiğli to Bergama and parallels the D550 for most of its route.[1]
O-33 | ||||
---|---|---|---|---|
Northern Aegean Motorway Kuzey Ege Otoyolu | ||||
Route information | ||||
Part of E87 | ||||
Length | 55.2 km (34.3 mi) | |||
Existed | 2019–present | |||
Major junctions | ||||
South end | O-30 in Çiğli, İzmir | |||
North end | Bergama | |||
Location | ||||
Country | Turkey | |||
Regions | Aegean | |||
Provinces | İzmir | |||
Highway system | ||||
|
History
editOn 15 February 2017 the tender to construct the motorway was awarded to a consortium of three companies, IC İçdaş, Kalyon and Astaldi. Like other otoyol projects in Turkey, the tender was awarded under a build-operate-transfer contract until 2027.[2] Groundbreaking for the highway took place on 5 April 2017 in a ceremony attended by Prime Minister Binali Yıldırım and Minister of Transport Ahmet Arslan. The US$408.2 million motorway was opened to traffic on 30 October 2019.[3][4]
The designation O-33 had previously been used for the Bursa Beltway, now designated as a part of the O-5 and O-22.[1]
Exit list
editProvince | District | km | mi | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
İzmir | Menemen | 0 | 0.0 | O-30 | Highway continues as O-30 | |
5.4 | 3.4 | K1 | D.250 — Manisa, Turgutlu | |||
14.3 | 8.9 | Menemen Toll Plaza | ||||
16.4 | 10.2 | Buruncuk Tunnel | ||||
18.2 | 11.3 | K2 | P.35-79 — Foça | Connects to D.550 | ||
Aliağa | 23.1 | 14.4 | K3 | P.35-79 — Yeni Foça | Connects to D.550 | |
28.8 | 17.9 | K4 | Necmettin Giritlioğlu Cd. — Aliağa | Connects to D.550 | ||
32.9 | 20.4 | K5 | Aliağa O.S.B. | |||
46.3 | 28.8 | K6 | Mimar Sinan Cd. — Yenişakran | |||
Bergama | 55.2 | 34.3 | K7 | Çandarlı Connector — Port of Çandarlı | Connects to D.550 | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|