Otoyol 30

(Redirected from O-30)

Otoyol 30 (English: Motorway 30), also known as the İzmir Beltway (Turkish: İzmir Çevreyolu) and abbreviated as the O-30, is a 60.2 km (37.4 mi) long motorway that runs around the Gulf of İzmir from Balçova to Menemen.[1] The motorway acts as a bypass for through-traffic around the city and connects to four other motorways; O-5, O-31, O-32 and O-33. For most of its route, the O-30 runs along the perimeter of İzmir, but enters urbanized areas in Balçova, Bornova, Karşıyaka and Çiğli. The entire motorway has six lanes (three in each direction) and is a part of the E87 and E881.

O-30 shield}}
O-30
İzmir Beltway
İzmir Çevreyolu
Route information
Part of E87 E881
Length60.2 km (37.4 mi)
Existed1993–present
Major junctions
South end O-32 in Balçova, İzmir
Major intersections
North end O-33 in Menemen, İzmir
Location
CountryTurkey
RegionsAegean
Provincesİzmir Province
Major citiesİzmir
Highway system
O-22 O-31

The first section of the O-30 opened to traffic in 1993 with the most recent section opened in 2008.

History

edit

Construction of the O-30 was started in 1988 in order to relieve traffic on the congested D-550, which was the only direct north–south road at the time. Along with relieving inner-city congestion, the O-30 was planned to be a connecting hub for two other motorways under construction at the time. The first section of the motorway was opened to traffic on 12 December 1993, between Karabağlar and Işıkkent.[2] This 18 km (11 mi) long section provided an alternate route around the city from Gaziemir (south İzmir) to Bornova (east İzmir) as well as connecting to the O-31, which opened its first section on the same day. Construction of the O-30 slowed down over the next years, due to financial difficulties. Construction of the southern half of the O-30 progressed faster than construction of the northern half. On 10 July 1997, the O-30 was connected to the D-300, which was the main east–west trunk road and on 15 August 1998, the 2.5 km (1.6 mi) long section between Karabağlar and Uzundere was opened to traffic. In 1999, connection to the İzmir Bus Terminal was opened on the 10 April, followed by the 5 km (3.1 mi) long section between Uzundere and Balçova, which was opened on 30 April. The motorway was finally connected to the O-32 on 6 August 2002, via a 1.5 km (0.93 mi) viaduct through Balçova, thus completing the southern half of the O-30.[2] Due to the slow progression of its northern half, the O-30 was nicknamed the motorway that will never open (Turkish: Açılmaz otoyol) and residents of İzmir started to protest the delay.[3] Construction was sped up in 2006 and in January 2007 the 12.6 km (7.8 mi) section between Bornova and Karşıyaka along with two tunnels was opened. Construction progressed at a steady pace over the next years as the O-30 was extended from Karşıyaka to Çiğli on 15 June 2008.

Exit list

edit
 
O-30 in Buca
ProvinceDistrictkmmiExitDestinationsNotes
İzmirBalçova0.00.0K1  O-32Çeşme, ÜçkuyularTrumpet interchange
1.20.75Fuat Köprülü St.Northbound entrance, southbound exit
Karabağlar4.62.9K2Kütüphaneci Rasime Şeyhoğlu St.
6.84.2K3Eski İzmir Ave.
Gaziemir7.94.9İzmir FairgroundNorthbound exit, southbound entrance and exit
9.45.8K4  D.550Aydın, MuğlaCloverleaf interchange
Buca10.76.6K4-1677/19 St.
16.810.4K5Doğuş Ave.Cloverleaf interchange
18.111.2K6Dokuz Eylül UniversityTrumpet interchange
19.812.3K7  O-31AydınToll motorway
Bornova26.816.7K8Aydınlar Ave.
27.417.0Kemalpaşa Ave.Northbound exit
29.418.3K9  O-5Ankara, Istanbul, Manisa and KemalpaşaCloverleaf interchange
30.719.1K10372nd St.
31.719.7K11  D.300Afyon, Konya, Kayseri, Van / Üniversite Ave. — Ege University
3321K12Yzb. İbrahim Hakkı Ave.
35.321.9K131620/39th St.
Bayraklı36.422.6Bayraklı-1 Tunnel
38.924.2Bayraklı-2 Tunnel
39.924.8K147375th St.
Karşıyaka41.425.7K15Girne Blvd. — KarşıyakaCloverleaf interchange
43.326.9K166718th St. — Yamaçevler
44.527.7K17  D.550Aliağa, ÇanakkaleCloverleaf interchange
Çiğli46.128.6K18Caher Dudayev Blvd. — Mavişehir, ÇiğliVia service road
48.630.2K19Mustafa Kemal Atatürk Blvd.Via service road
50.431.3K20Ahmet Priştina Ave. — Sasalı
52.932.9K21Askeri Havaalanı Cd. — İzmir Kâtip Çelebi University
Menemen56.835.3K22Karaağaç YoluCloverleaf Interchange
60.237.4K23  D.550Aliağa, Çanakkale   O-33Aliağa, ÇanakkaleCloverleaf Interchange, Highway continues as O-33
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit
  1. ^ "Otoyollar İzmir-Bursa 2022".
  2. ^ a b İzmir-Aydın ve İzmir Çevre Yolu İnşaatı, Abdullah Bizden, p. 26
  3. ^ İzmir Beltway is expanding further