The Third Incheon Bridge (Korean인천 제3연륙교), or Third Yeonryuk Bridge, is a reinforced concrete cable-stayed bridge currently under construction in Incheon, South Korea. Construction began in December 2021 and is projected to be completed by 2025. The bridge will connect Cheongna International City in Seo District, Incheon and Jung District, Incheon on Yeongjongdo providing a third link to Incheon International Airport. In addition to a six-lane highway, pedestrian and cycle lanes will be installed, together with an observatory on one of the bridge's 180m towers. The bridge will connect to the Gyeongin Expressway and is projected to allow travel times from Yeongjongdo of 30 minutes to Yeouido and 45 minutes to Gangnam.[2]

Third Incheon Bridge
Coordinates37°30′58″N 126°35′20″E / 37.516°N 126.589°E / 37.516; 126.589
Carries6-lane expressway, pedestrian and cycleways[1]
LocaleIncheon, South Korea
Characteristics
DesignCable-stayed bridge
Total length4.68 kilometres (2.91 mi)[1]
Longest span560 metres (1,840 ft)[1]
History
Construction start2021
Construction end2025 (projected)
Location
Map

References

edit
  1. ^ a b c "[인천 제3연륙교] 영종~청라 제3연륙교 본 공사 위한 물량장 확보...1・2공구 교량 공사 22일 착공". 24news.kr (in Korean).
  2. ^ 지, 홍구 (13 February 2024). "인천공항 잇는 세 번째 '제3연륙교' 순풍...내년 말 준공". Maeil Business Newspaper.