The Sydney Trains M sets, also referred to as the Millennium trains, are a class of electric multiple units (EMU) that operate on the Sydney Trains network. Built by EDi Rail between 2002 and 2005, the first sets initially entered service under the CityRail brand on 1 July 2002 after short delays due to electrical defects.[2][3] The M sets were built as "fourth generation" trains for Sydney's suburban rail fleet, replacing the 1960s Tulloch carriages and providing extra capacity on the suburban rail network.[4] The sets currently operate on the T2 Leppington & Inner West, T3 Liverpool & Inner West, T5 Cumberland, T6 Lidcombe & Bankstown, T7 Olympic Park and T8 Airport & South lines.

M set
M10 approaching Sydney Central in March 2024
Lower deck interior in 2011
In service2002–present
ManufacturerEDi Rail
Built atCardiff
ReplacedTulloch carriages
Constructed2002–2005
Entered service1 July 2002
Number built141 carriages
Number in service140 carriages
Formation35 4-car sets
Fleet numbers
  • D1001–D1041, D1043–D1060, D1062–D1073 (driving trailers)
  • N1501–N1540, N1543–N1560, N1562–N1573 (motor cars)
  • M1–M35 (full 4-car sets)
Capacity452
OperatorsSydney Trains
DepotsAuburn
Lines served
Specifications
Car body constructionStainless steel
Train length81.55 m (267 ft 6+58 in)
Car length
  • 20,532 mm (67 ft 4+38 in) (D)
  • 20,243 mm (66 ft 5 in) (N)
Width3.03 m (9 ft 11+14 in)
Height4,381 mm (14 ft 4+12 in)
DoorsPlug-style, 2 per side
Wheel diameter940 mm (37 in)
Maximum speed
  • 143 km/h (89 mph) (design)
  • 130 km/h (81 mph) (service)
Weight207 t (204 long tons; 228 short tons)
Traction systemAlstom ONIX 1500 2-level IGBTVVVF[1]
Traction motors8 × Alstom 4-EXA-2144 226 kW (303 hp) 3-phase AC induction motor
Power output1,808 kW (2,425 hp)
Electric system(s)1,500 V DC (nominal) from overhead catenary
Current collector(s)Pantograph
UIC classification2′2′+Bo′Bo′+Bo′Bo′+2′2′
Braking system(s)Automatic air, electropneumatic and regenerative
Coupling systemScharfenberg coupler
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Design

edit
 
Vestibule

The Millennium train, just like the entire Sydney Trains fleet and electric NSW TrainLink fleet, is a double decker. It is a four car consist, with the middle two cars being non-control motor cars and the two outer cars being driving control trailer cars fitted with the pantograph.[5] The Millennium train was the first to be equipped with an AC drive system unlike the Tangara, which has a DC drive system. The sets usually operate in eight-car formations with two four-car sets combined. While the Millennium train concept is an evolution of the Tangara concept (manufactured by A Goninan & Co), the Millennium train introduced new features such as internal electronic destination indicators, automated digital voice announcements for upcoming stops, a return to reversible seating, surveillance cameras, wider stairways, a new safety yellow colour scheme, and push-button opened internal doors. The Millennium Train also introduced crumple zones to absorb impact in a collision. Interiors were designed by Transport Design International.[6]

The train also features emergency help points, allowing passengers to contact the train crew in an emergency. The help points are located on the sides of the stairwell to the upper deck. There are actually two help points in the same location, with a large one at face height with a microphone and speaker, and a lower one with a microphone only. There are also emergency door releases which were retrofitted to the trains. These allow passengers to manually open the doors in an emergency, as recommended in the report for the Waterfall rail accident. The retrofit program was stated as having been completed in November 2014.[7]

Like with the T, A and B sets, the M sets feature Scharfenberg couplers.[8]

M sets are 3.03 metres (9 ft 11+14 in) wide, being classed by Transport for NSW as medium width trains, which allows them to operate within the whole Sydney Trains suburban network.[9]

Unlike sets M2–M35, set M1 has a slightly different interior design with differently coloured doors and different seat handles for unknown reasons.

Delivery

edit
 
Stairwell

The cars were constructed by EDi Rail at Cardiff Workshops. The contract included a 15-year maintenance agreement with EDi Rail to maintain the trains at a specialised maintenance centre at Eveleigh. During testing and initial revenue service, they ran as four car sets, with eight car sets commencing service towards the end of 2002 after further testing. All 35 four car sets were delivered by October 2005.

The initial order signed in October 1998 was for 81 carriages, in December 2002 an option was taken up for an additional 60.[2] In February 2017, Sydney Trains exercised an option to extend Downer's maintenance of the trains for a further 10 years.[10]

Criticisms

edit

The Millennium trains were criticised for having several technical problems and causing problems with Sydney Trains, they were referred to in the media reports as The "Mi-lemon" and "Millenni-Bug" as a result.[citation needed] Some of the problems were caused by insufficient power supply on the overhead to cope with the power demands of the more technologically advanced trains causing them to shut down. Software bugs also contributed to the trains' poor reliability.

The Millennium trains were withdrawn from service in April 2003 while the problems were being rectified and a full audit was carried out.[2] They were subsequently reintroduced into service in June 2003.

As of the new timetable since 20 October 2024, M Sets now run 8-car services on the T2 Leppington & Inner West, T3 Liverpool & Inner West, T5 Cumberland and T8 Airport & South lines, while also running 4-car services T5 Cumberland, T6 Lidcombe & Bankstown and T7 Olympic Park lines.

In service

edit

External Carriage Camera Trial

edit
 
Trial cameras

In late 2008, two Millennium trains were fitted with external cameras atop of carriages near the doors, testing their use for the then-future Waratah trains. These cameras were subsequently incorporated into the final design of the Waratah train.[11]

Lines serviced

edit

The Millennium trains typically operate on the following lines (normally described as Sector 2):

Maintenance Depots

edit

The trains were originally maintained at Eveleigh Maintenance Centre, they are now maintained at Auburn Maintenance Centre.

As with all other trains, these trains are not exclusively kept in Auburn overnight. They only need to return to the depot for maintenance, and at other times, they may be stabled at various yards on the lines that they operate, such as Blacktown, Liverpool and Rossmore yards.

References

edit
  1. ^ Connolly, Helen (7 November 2002). "Major supplier for Sydney's Millennium Trains". Alstom. Archived from the original on 21 August 2021. Retrieved 21 August 2021.
  2. ^ a b c RJ Sendt (June 2003). "Performance Audit - The Millennium Train Project" (PDF). The Audit Office of New South Wales. Archived from the original (PDF) on 22 August 2011. Retrieved 24 September 2007.
  3. ^ Darren Goodsir (16 April 2002). "Signal failure? No, it's just the Millennium train picking up steam". The Sydney Morning Herald. Archived from the original on 8 November 2012. Retrieved 31 August 2011.
  4. ^ "Concept drawings for the 4th Generation 'Millennium' train". collection.maas.museum. Archived from the original on 24 October 2021. Retrieved 15 October 2021.
  5. ^ Millennium Trains Archived 12 June 2018 at the Wayback Machine Transport for NSW
  6. ^ "millennium". Axis Communications. Archived from the original on 16 February 2011. Retrieved 20 July 2013.
  7. ^ "Waterfall SCOI Annual Status Report" (PDF). March 2019. Archived (PDF) from the original on 28 January 2020. Retrieved 28 January 2020.
  8. ^ "Exhibit 3 - Railcorp Train Performance Specification" (PDF). transport.nsw.gov.au. 17 January 2011. Archived (PDF) from the original on 21 April 2018. Retrieved 16 September 2018.
  9. ^ Train Operating Conditions (TOC) Manual - General Instructions (PDF). Asset Standards Authority. Transport for NSW. 2019. pp. 42, 242. Archived (PDF) from the original on 27 October 2019. Retrieved 27 October 2019.
  10. ^ Downer signs $225m M-set maintenance extension Archived 5 March 2017 at the Wayback Machine Rail Express 3 March 2017
  11. ^ "Platform Guards Irrelevant Ecotransit". Archived from the original on 26 July 2011. Retrieved 8 July 2011.

Further reading

edit
  • Beckhaus, John; Halgren, Stephen (2007). Sydney's Electric Trains. Australian Railway Historical Society NSW Division. ISBN 978-0-975787-08-3.
edit