Suseo Station (Korean수서역; Hanja水西驛; RRSuseo-yeok) is a railroad station on the Suin–Bundang Line and Line 3 of the Seoul Metropolitan Subway. The station is in the Suseo neighborhood of the Gangnam District in Seoul, South Korea. Prior to the Line 3 extension to Ogeum station in 2010, Suseo Station was the southeastern terminus of Line 3. Along with Yangjae station, Suseo Station serves as an important transfer point between Line 3 and buses from/to southern cities such as Seongnam, Yongin, and Suwon.

Suseo Station

수서역
Station building
General information
LocationGangnam, Seoul
South Korea
Operated bySR Corporation
Korail
Seoul Metro
GTX-A Line Co., Ltd.
SG Rail Co., Ltd.
Construction
Structure typeAt-grade and underground (SRT and Subway)
History
OpenedOctober 30, 1993 (1993-10-30) (Seoul Metro)
September 1, 1994 (1994-09-01) (Korail)
December 9, 2016 (2016-12-09) (SRT)
March 30, 2024 (2024-03-30) (GTX-A)

In December 2016,[1] it became the northern connection point to the Suseo–Pyeongtaek high-speed railway running SRT.

Construction of Line A of the metropolitan express railway is underway, and it is scheduled to open in 2024. It will join the Suseo Pyeongtaek Express Line at GTX Suseo Station. In the future, Bundang Line station plans to install evacuation lines on the platform as part of the express train operation. The Suseo Pyeongtaek Express Line is an underground section from this station to Dongtan station.

Services

edit
 
Inside Suseo station

Suseo station is the terminus of All SRT trains including:

  • All trains that run Suseo–Pyeongtaek high-speed railway and directly to Daejeon, Daegu, and Busan by the Gyeongbu High-speed Railway
  • All trains that run Suseo–Pyeongtaek high-speed railway and directly to Iksan, GwangjuSongjeong, and Mokpo by the Honam High-speed Railway

Seoul Subway

edit
 
Platform signage

Seoul Subway serves the station with Line 3 and Suin–Bundang Line.

The GTX-A line linking Dongtan to Unjeong will be opened in 2024.

Station layout

edit

SRT platforms

edit
Suseo

수서
 
General information
LocationSuseo-dong, Gangnam
Seoul
Operated bySR Corporation
Line(s)
Platforms3
Tracks
  • 6
Construction
Structure typeGround
History
OpenedDecember 9, 2016
Services
Preceding station   Korea Train Express Following station
Terminus Suseo SRT Dongtan
towards Mokpo or Busan
Terminus
| 65 | | 43 | | 21 |
Dongtan
1·2   for Busan · Dongdaegu · Mokpo · GwangjuSongjeong · Jinju · Masan · Yeosu EXPO · Pohang
3·4
5·6

Seoul Metro platforms (Line 3)

edit
수서
Suseo
 
Line 3 platform
General information
LocationSuseo-dong, Gangnam
Seoul
Operated bySeoul Metro
Line(s)     Line 3
Platforms
  • 3
Tracks
  • 2
Construction
Structure typeUnderground
History
OpenedOctober 30, 1993
ElectrifiedYes
Services
Preceding station Seoul Metropolitan Subway Following station
Irwon
towards Daehwa
Line 3 Garak Market
towards Ogeum
Irwon
| | 13 |
Garak Market
1   Line 3 for Express Bus Terminal · Jongno 3(sam)-ga · Gupabal · Daehwa
2 for National Police Hospital · Ogeum
or Alighting Passengers Only
3   Line 3 for Express Bus Terminal · Jongno 3-ga · Gupabal · Daehwa

Korail platforms (Suin–Bundang Line)

edit
수서
Suseo
 
 
Suin–Bundang Line platform
General information
LocationSuseo-dong, Gangnam
Seoul
Operated byKorail
Line(s)     Suin–Bundang Line
Platforms
  • 2
Tracks
  • 2
Construction
Structure typeUnderground
History
OpenedSeptember 1, 1994
ElectrifiedYes
Services
Preceding station Seoul Metropolitan Subway Following station
Daemosan Suin–Bundang Line Bokjeong
towards Incheon
Daemosan
| |
Bokjeong
1   Suin–Bundang Line for Moran · Yatap · Seohyeon · Suwon · Incheon
2 for Guryong · Seonjeongneung · Wangsimni · Cheongnyangni

GTX-A

edit
수서
Suseo
 
GTX-A platform
General information
LocationSuseo-dong, Gangnam
Seoul
Operated byGTX-A Line Co., Ltd.
Line(s)     GTX-A
Platforms
  • 1
Tracks
  • 2
Construction
Structure typeUnderground
History
OpenedMarch 30, 2024
ElectrifiedYes
Services
Preceding station Seoul Metropolitan Subway Following station
Terminus GTX-A Seongnam
towards Dongtan
↑ Terminus
| |
Seongnam
1   GTX-A for Guseong · Dongtan
2 Terminus
edit

Exits

edit
Exit No. Image Destinations
1 Sindonga APT
1-1 Daejin Design High School
2 Samik APT
3 Sejong High School, Suseo Elementary & Middle Schools
4   Suseo E-Mart
5   Daegok Elementary School, Mido APT
6 Gungmaeul

References

edit
  1. ^ "SRT to start operation next month". The Korea Times. 2016-11-02. Retrieved 2016-11-03.
edit