The Rome Metro (Italian: Metropolitana di Roma) is a rapid transit system that operates in Rome, Italy. It started operation in 1955, making it the oldest in the country.

Rome Metro
Metropolitana di Roma logo
S/300 train into Conca d'Oro station, on platform 1
A S300 train
Overview
Native nameMetropolitana di Roma
LocaleRome, Italy
Transit typeRapid transit
Number of lines3[1]
Number of stations73[1][2][Note 1]
Daily ridership819,421 (2019)
Annual ridership320 million (2019)[3]
WebsiteATAC S.p.A.
Operation
Began operation9 February 1955; 69 years ago (9 February 1955)
Operator(s)ATAC
Number of vehicles83 trains[1]
Technical
System length60 km (37 mi)[1][2][4]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (Overhead lines)
System map
Laurentina
Battistini
EUR Fermi
Cornelia
EUR Palasport
Baldo degli Ubaldi
EUR Magliana
Valle Aurelia
Marconi
Cipro
Basilica S. Paolo
Ottaviano
Garbatella
Lepanto
Piramide
Flaminio
Circo Massimo
Spagna
Veniezia
Colosseo
Barberini
Cavour
Repubblica
Porta Metronia
Termini
Vittorio Emanuele
Castro Pretorio
Manzoni
Policlinico
S. Giovanni
Bologna
Re di Roma
Lodi
Ponte Lungo
Pigneto
Furio Camillo
Malatesta
Colli Albani
Teano
Arco di Travertioo
Gardenie
Porta Furba
Mirti
Numidio Quadrato
Parco di Centocelle
Lucio Sestio
Alessandrino
Giulio Agricola
Torre Spaccata
Subaugusta
Torre Maura
Cinecittà
Giardinetti
Anagnina
Torrenova
Torre Angela
S. Agnese/Annibaliano
Torre Gaia
Libia
Grotte Celoni
Conca d'Oro
Due Leoni - Fontana Candida
Jonio
Borghesiana
Tiburtina
Bolognetta
Quintiliani
Finocchio
Monti Tiburtini
Graniti
Pietralata
Monte Compatri - Pantano
S. Maria del Soccoroso
Ponte Mammolo
Rebibbia

A
Battistini - Anagnina
B
Laurentina - Rebibbia / Jonio
C
Monte Compatri-Pantano - San Giovanni

The Metro comprises three lines – A (orange), B (blue) and C (green) – which operate on 60 km (37 mi) of route, serving 73 stations.[1][2][Note 1] It has a daily ridership of approximately 820 thousand passengers, and an annual traffic of approximately 320 million passengers.[3]

In addition to the Metro, the center of Rome and its urban area are served by 8 FL lines (672 km (417.5 mi) with 131 stations) that surround Rome and the Lazio region,[5] 6 tram lines (36 km (22 mi) ) with 192 stations),[6] 3 commuter urban lines (135 km (83.8 mi) with 57 stations), as well as the Leonardo Express which connects Roma Termini, the central station of the city of Rome, to the Leonardo da Vinci Airport of Fiumicino,[7] and the Civitavecchia Express which connects the city to the main port of Rome, the Port of Civitavecchia.[8] Network extensions are currently under construction on Line C (Porta Metronia, Colosseo-Fori Imperiali and Venezia). There are further projects for Line A, Line B, Rome-Giardinetti and for the suburban rail system.[9] The entire transport system in Rome uses the Metrebus integrated tariff system (an acronym composed of the words "Metro", "Train" and "Bus"), which can be used within the limits of the Municipality of Rome and within the limits of the urban tariff.[10]

Line B was the first metro line inaugurated in the system, and the first official metro in Italy, but the names 'A' and 'B' were only added when the second line opened 25 years after the first. Inaugurated in post-war Italy in 1955 during the reconstruction and on the verge of the Italian economic miracle, it was designed and built for the 1942 universal exhibition (Esposizione Universale Roma, which is now the current business center of Rome) desired by the fascist regime, which never took place due to the outbreak of the World War II.[11]

Lines

edit
Line Termini Opened Newest
extension
Length Stations
km mi
  Battistini Anagnina 1980 2000 18.4 11.4 27
  Laurentina Rebibbia / Jonio 1955 2015 22.9 14.2 26
  Monte Compatri-Pantano San Giovanni 2014 2018 18.7 11.6 22

Line A

edit

Line A runs from the southeastern suburbs of Rome, then along the northeast section of downtown, and then to the northern section of the city, near Vatican City. It connects with Line B, along with many other national and regional rail services, at Termini, and with Line C at San Giovanni. It has 27 stations, with terminals at Battistini and Anagnina. It is identified by the colour orange.

Line A was the second line built in Rome. Approval was given for the construction of the city's second Metro line in 1959.

Work on Line A began in 1964 in the Tuscolana area, but suffered a series of delays caused the originally planned cut and cover method of construction posed serious problems for road traffic in southeast Rome. Work on the Metro was suspended and began again five years later, using bored tunnels, which partially resolved the traffic problems but caused numerous claims for compensation for vibrations caused by the machines. Work was also frequently interrupted by archaeological finds made during the excavations, particularly near Piazza della Repubblica.[citation needed]

Line A entered service in February 1980. In the late 1990s, it was extended from Ottaviano, in the Prati district, to Battistini to the west.

Since June 2022, the station of Valle Aurelia, on Line A, is connected with the reactivated railway station of Vigna Clara. The Vigna Clara-Valle Aurelia section is a relevant step to close the railway ring in North Rome because of the connection with the Line A, Line B (Ostiense) and the FL3 suburban line to Viterbo.[12]

Line B

edit

Line B was the first Metro line in Rome. Line B connects the northeast of the city with the southwest. It has 26 stations with terminals at Rebibbia, Jonio and Laurentina (just east of EUR). It is identified by the colour blue. Transfers are available with Line A and other rail services at Termini station.

Line B was planned during the 1930s by the fascist government to provide a rapid connection between the main train station, Termini, and a new district to the southeast of the city, E42, the planned location of the Universal Exposition (or Expo), which was to be held in Rome in 1942. The exposition never took place due to Italy's entry into the Second World War in 1940. When its construction was interrupted, some of the tunnels on the city-centre side of the Metro (between Termini and Piramide) had already been completed, and they were used as air raid shelters during the war.

Work restarted in 1948, together with the development of the site formerly designated for the Expo into a residential and business district under the name EUR. The Metro was officially opened on 9 February 1955 by the then President of the Republic, Luigi Einaudi. Regular services began the following day.[13]

In 1990, Line B was extended from Termini to Rebibbia in the east of the city and the entire line was modernised. A new 4 km (2.5 mi) long branch (B1) was opened connecting Piazza Bologna with Conca d'Oro on 13 June 2012; the branch's last stop (and new terminus), Jonio, was opened on 21 April 2015.

Line C

edit
 
Archaeological finds inside the San Giovanni station

Opened on 9 November 2014, line C currently runs radially from San Giovanni, serving as an interchange station for Line A, to the eastern terminus of Pantano (the former terminus of the Roma–Giardinetti light railway). It is the first Metro line to extend beyond the city boundaries in Rome.

It is planned to extend to the northwest, towards Grottarossa (north of the Vatican), via the city centre; it will also intersect with Line A at Ottaviano (beside the Vatican), with Line B at Colosseo, and with the planned Line D at Piazza Venezia, thus creating a fourth Metro hub in Rome.

 
San Giovanni Archeostation

The first section of the line, from Centocelle to Pantano,[14] is the furthest from the city centre and includes 15 of the planned 30 stops. A further 5.4-kilometre (3.4 mi) section of Line C, serving six additional stations, opened on 29 June 2015, as the line's western terminus was moved from Parco di Centocelle to Lodi.[2] On 12 May 2018, the western terminus was moved to San Giovanni (interchange station for line A).[15] After this third phase, the line will be further extended with three stations, Porta Metronia, Colosseo, and Piazza Venezia, located in the city centre.[16]

Progress on the line has been slow with projected completion dates being repeatedly delayed. Rome is one of the oldest cities in the world, and as such, the construction of the Metro system has encountered considerable obstacles owing to frequent archaeological discoveries.[17] While the excavation of the tunnels themselves can be undertaken well below the probable location of most archaeological finds, the excavation of stairwells and ventilation shafts – which must, by necessity, connect with the surface – pose considerable difficulties.

The trains operating on line C are completely automated,[18] and use the same AnsaldoBreda Driverless Metro system also featured on the Copenhagen Metro.

 
Projected overview map of Rome Underground and Rail

Archeostation

edit

During the excavation for the central route of line C, thanks to the archeological richness of Rome's ground a new type of underground station was born, as in Paris with Louvre–Rivoli station.

San Giovanni

edit

San Giovanni station was the first archeostation to be opened on 12 May 2018. Excavation to a depth of about 20 metres allowed the exploration of about 21 stratifications of history up to the so-called virgin soil, the one in which man's presence is absent.

The exhibition is characterized by being a real tour with libraries for the finds along the route, explanatory panels on the walls and a temporal measurement of the historical phases that follows the path of the passengers from the atrium level to the platforms' level:

  • Atrium level: from Contemporary Age to Late Antiquity Age
  • First underground level: from Republican Age to Archaic Age
  • Platform level: Prehistoric Age

The various archaeological finds and exhibits include small items such as gold jewelry, coins, crockery, shells, large amphorae and elements of ancient columns and also large finds, such as the large pool, the largest reservoir ever found, located inside a farm of the imperial age.

Timeline

edit
Timeline of Rome metro construction
date section or station line
10 February 1955 Termini – EUR Fermi  
16 February 1980 Ottaviano – Cinecittà  
11 June 1980 Cinecittà – Anagnina  
8 December 1990 Termini – Rebibbia
Garbatella
Laurentina
 
12 March 1993 Marconi  
13 December 1995 Ponte Mammolo  
29 May 1999 Ottaviano – Valle Aurelia  
1 January 2000 Valle Aurelia – Battistini  
23 June 2003 Quintiliani  
12 June 2012 Bologna – Conca d'Oro  
9 November 2014 Monte Compatri-Pantano – Parco di Centocelle  
21 April 2015 Conca d'Oro – Jonio  
29 June 2015 Parco di Centocelle – Lodi  
12 May 2018 Lodi – San Giovanni  

Network map

edit

 


Rolling stock

edit
A CAF MB400 in service on line B in Termini station
CAF MA300 train on line A
MB100 in service on line B at the Piramide station
Detail of the trains used on line C, Hitachi Rail Italy Driverless Metro

All Rome metro lines are heavy rapid transit lines, with 6-car trains, approximately 105 m long. Line A of the Rome metro uses exclusively the CAF MA 300 series, line B essentially uses the CAF MB400 series together with other CAF MA300 series trains and the historic MB 100 Ansaldobreda. Line C is the longest driverless metro in Italy and one of the largest in Europe, using Hitachi Rail Italy's driverless technology.[19]

Service

edit

Fares

edit

An urban single journey ticket (integrated ticket), the Biglietto Integrato a Tempo (BIT), costs €1.50, and is valid on the Metro, buses, trams and suburban trains inside the Rome municipality for 100 minutes from first validation. Other tickets are available, including daily (€7.00), 2-day (€12.50), and 3-day (€18.00) passes (Rome 24h/48h/72h), and a weekly pass (€24.00), the Carta Integrata Settimanale (CIS). Monthly passes that are valid during the charged calendar month for unlimited journeys available for the personal usage (€35.00) or impersonal usage (€53.00) and may be used alternatively by different persons. Children under 10 years old travel can travel for free on public transport services when accompanied by a fare-paying adult.

Two proximity cards are available in Rome, ”èRoma” and Metrebus Card Red”, which can be charged with season tickets, replacing paper for this type of ticket.

Operating hours

edit

Service starts at about 5:30 am and ends at about 11:30 pm. On Fridays and Saturdays service ends later, at about 1:30 am.[20]

When the Metro is closed, a night bus service operates with lines that follow the same routes and stop at the same stations as the Metro. Line A is served by bus NMA, Line B is served by bus NMB/NMB1, and Line C is served by bus NMC.

Other rail lines

edit
 
Metro and urban railways map (before opening of Jonio station and line C)

Rome's local transport provider, ATAC, operates the Metro network and the Rome-Giardinetti line. The Roma–Lido, which connects Rome to Ostia, and the Roma–Viterbo line, used to be operated by ATAC until 1 July 2022, when it became part of the Cotral network.[21]

Roma–Lido

edit

Construction of the Roma–Lido line began shortly after the end of World War I and was completed some six years later in 1924. It began operation as a steam locomotion railway but electrification was completed less than a year later.

The line is operated as an integrated part of the Metro, but runs entirely overground. It runs from the Roma Porta San Paolo station beside the Line B Piramide station and runs alongside Line B as far as EUR Magliana. It then continues separately on to the seaside district of Ostia. The line terminates beside the end of Via Cristoforo Colombo.

Roma–Giardinetti

edit
 
A train of the Roma–Giardinetti line

Officially termed a railway, the Roma–Giardinetti line is a narrow gauge tram which connects Laziali (a smaller, local train station some 800 metres east of Termini's main concourse) with Giardinetti, just past the Grande Raccordo Anulare (GRA) – Rome's orbital motorway. The line originally ran to Frosinone some 137 km (85 mi) from Rome, but has been gradually reduced in length, when the section from Giardinetti to Pantano, which will become a permanent part of Line C, was taken out of service. Most recently also the part from Centocelle to Giardinetti was reduced.

As regards future projects, the transformation of the line into a modern light rail line is planned, with an extension planned to the Tor Vergata area. The new light rail system will be called "line G" with respect to the metro network and line 11 with respect to the tram network. The work, after a long bureaucratic process, has been commissioned and financed, the line is expected to close during 2026 in order to begin work.[22]

Roma–Civita Castellana–Viterbo

edit
 
Montebello station of the Roma–Civita Castellana–Viterbo line

The Roma–Civita Castellana–Viterbo line (also called Roma Nord railway) began life as a narrow-gauge tram running from Piazza della Libertà in Rome to Civita Castellana. However, the next stretch of the line, to Viterbo, was built as a railway and over the years the tram section was converted into a railway as well, a process which concluded with the moving of the Roman terminus from the street-level terminus at Piazza della Libertà across the river to a new underground station in Piazzale Flaminio, beside the subsequently constructed Line A station, after World War II.

The line is operated in two modes: as an urban service from Piazzale Flaminio to Montebello, and as a suburban service from Piazzale Flaminio to Viterbo. The urban service operates with a frequency of about one train every ten minutes, while the suburban service operates considerably less frequently, with less than a third of the trains making the full two-and-a-half–hour journey from Rome to Viterbo.

Future expansions

edit

The Metro system is currently expanding:

  • An extension of line A from Battistini to Torrevecchia towards the west of the city is planned; a track of 2 kilometres (1.2 mi) with 2 stations.[23]
  • An extension of line B is also planned. A track of 2.8 kilometres (1.7 mi) with 2 stations should be realized from Rebibbia (Rome Metro) to Torraccia/Casal Monastero, towards the east of Rome. The extension of the line B1 is extending from Jonio to Bufalotta with 3.8 kilometers with 3 stations.
  • The extension of line C towards the centre of Rome is under construction. From San Giovanni (interchange station with line A) to Grottarossa (Rome Metro), the track is 3.6 kilometres (2.2 mi) long with an intermediate station near San Giovanni Addolorata Hospital, Amba Aradam.

New lines

edit
 
Proposed Line D

There are two proposed new lines, with no timeline for their construction:

  •   Line D is currently proposed to run from Ojetti in the north to Agricoltura in the south, passing through the city centre to the west of Roma Termini. Development on the project was suspended from 2012 to 2018.[24][25]
  •   Line E would take over the existing Rome–Lido railway and the Jonio branch of Line B, with a new railway connection south of Roma Porta San Paolo/Piramide.[26]
Line[citation needed] Terminals[citation needed] Opening Length[citation needed] Stations[citation needed]
  Ojetti Agricoltura 22 km 22
  Cristoforo Colombo Piramide 28.3 km 16

Signalling

edit
 
Signalling at the Marconi station

Signalling of the Rome Metro guarantees trains' safe and correct movements.

Line A

edit

Line A uses an evolution of the RS4 Codici, a classical block system of the Italian railway. Since its creation the signalling offers to the conductor advice about the speed limit and the freedom of the way.[27]

Line B

edit

Until 1990, Line B used a railway-like signaling system that advised only about the freedom of the way.[28]

Since 1990, the line uses a new signaling system, inspired by the Milan Metro's signaling, that gives information about the speed limit in the section within a range of 0 km/h and 80 km/h. Conductors are informed by classical light semaphores.[29]

Line C

edit

Line C is an automatic line and uses a radio frequency system for communication with the train. It has an electrical block system that permits a max frequency of a train every 90 seconds.[30]

See also

edit

Notes

edit
  1. ^ a b Counting Termini, the interchange station between Lines A and B, and San Giovanni, the interchange station between Lines A and C, only once.

References

edit
  1. ^ a b c d e "Home > Azienda – I numeri di atac – Trasporto pubblico" [Home > Company – The numbers of ATAC – Public transportation] (in Italian). ATAC. 8 November 2014. Retrieved 6 April 2015.
  2. ^ a b c d Marco Chiandoni (30 June 2015). "Rome metro Line C reaches Lodi". International Railway Journal. Retrieved 30 June 2015.
  3. ^ a b "Pendolaria 2019: i dati su tram e metro a Roma di Legambiente" (PDF). legambiente.it (in Italian). Retrieved 11 February 2020.
  4. ^ "IL SETTIMANALE – VIDEO – Prossima fermata Lodi, la metro C di Roma si avvicina al centro". Gazzettadeitrasporti.it. 27 June 2015. Retrieved 9 February 2019.
  5. ^ "Rome Train Map". romemap360.com. Retrieved 1 March 2024.
  6. ^ "Trams in Rome". rome.info. Retrieved 1 March 2024.
  7. ^ "The Roma Termini - Leonardo Da Vinci Airport connection takes just 32 minutes with the Leonardo express". trenitalia.com. Retrieved 1 February 2024.
  8. ^ the%20train%20service%20for%202023. "Civitavecchia Express: non-stop train for cruise passengers". civitavecchia.portmobility.it. 20 February 2019. Retrieved 1 March 2024. {{cite web}}: Check |url= value (help)
  9. ^ "Piano Urbano della Mobilità Sostenibile". romamobilita.it (in Italian). Retrieved 1 March 2024.
  10. ^ "Tickets and passes". atac.roma.it. Retrieved 1 March 2024.
  11. ^ "The Construction of Metro Stations & Shafts through Ancient Rome". engineeringrome.org. Retrieved 1 March 2024.
  12. ^ "The Vigna Clara railway station has reopened after 32 years". Romamobilita.it. 15 June 2022.
  13. ^ Rome Underground Railway Opened The Railway Magazine issue 649 May 1955 page 361
  14. ^ "Tratta T3, avanti tutta. Fermarsi costerebbe 180 mln". Metroxroma.it. 25 October 2013. Retrieved 9 February 2019.
  15. ^ "Linea C, riaprono i cantieri, a San Giovanni nell'inverno 2015". Metroxroma.it. 10 September 2013. Retrieved 9 February 2019.
  16. ^ "Roma Capitale – Sito Istituzionale – Metro C, partiti lavori tratta San Giovanni Colosseo. Le aree interessate dal cantiere". Comune.roma.it. Retrieved 9 February 2019.
  17. ^ Squires, Nick (5 May 2017). "Rome unveils 'museum' metro station packed with hundreds of ancient artefacts found during construction". Telegraph.co.uk. Retrieved 9 February 2019.
  18. ^ "Rome's subway: the eternal project". Japan Times Online. 17 April 2016. Retrieved 9 February 2019.
  19. ^ "Caratteristiche treni Linea C" (in Italian). Archived from the original on 7 May 2015.
  20. ^ "Linee e orari di metro e ferrovie". Romanobilita.it (in Italian).
  21. ^ "Le ferrovie Roma-Lido e Roma-Nord sono passate a Cotral e Astral". Roma Mobilità - sito ufficiale (in Italian). Retrieved 23 August 2022.
  22. ^ "Termini Giardinetti Tor Vergata" (in Italian).
  23. ^ "Presentazione oltre Battistini" (PDF). Comune.roma.it (in Italian).
  24. ^ "Avviso di revoca del bando di gara (Italian)" (PDF). Roma. Retrieved 6 March 2013.
  25. ^ "Campidoglio ripensa ai costi del tracciato della Metro D." Roma. 11 July 2018. Retrieved 12 July 2018.
  26. ^ "ROMA | La Roma-Lido diventerà la Linea E della metropolitana". Mobilita.org (in Italian). 30 March 2019. Retrieved 27 May 2020.
  27. ^ IL DISTANZIAMENTO DEI TRENI E LA REGOLAZIONE DEL TRAFFICO SULLA LINEA A DELLA FERROVIA METROPOLITANA DI ROMA
  28. ^ Il vecchio segnalamento della metropolitana di Roma
  29. ^ Il segnalamento della metropolitana di Roma
  30. ^ LA NUOVA STAZIONE DI SAN GIOVANNI DELLA LINEA C DI ROMA
edit