New Technology Train (NTT)[1][2][3] is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes the current R142, R142A, R143, R160, R179, R188 and R211 models, along with the planned R262 and R268 models. Two prototypes, the R110A and R110B, were used to test the features that would be found on all NTT trains today.

The typical NTT car design for the A Division (top; an R142) and B Division (bottom; an R160)

Sometimes referred to as New Millennium Trains,[4] they are known for improvements in technology, energy efficiency, reliability, and comfort along with advanced passenger information systems. All of these trains are capable of operating with communications-based train control (CBTC)—which can allow for automatic train controls and compatibility with updated signal systems—and either already have CBTC or are scheduled to be retrofitted with the system.[5][6] Much of the engineering and construction efforts for the fleet have been done by Kawasaki Heavy Industries and Bombardier Transportation, with Alstom also participating in the construction of the R160 fleet.

List of New Technology Trains

edit

This is a list of all NTT trains operated by the New York City Subway, as well as future trains and retired trains of the MTA.

Current

edit
  • R142 – Built by Bombardier Transportation. The first production model of NTT trains. Built for the A Division. Entered service on July 10, 2000.[2][7] Assigned to the 2, 4, and 5 routes. The R142s are similar to the R142As and the R188s.[8][9]
  • R142A – Built by Kawasaki Rail Car Company. Used by the A Division. Also entered service on July 10, 2000, the same day the R142s entered service.[2][7] 380 cars converted into R188s. 220 cars remain unconverted,[10][11] and are currently assigned to the 4. The R142As are similar to the R142s and nearly identical to the R188s.[8][9]
  • R143 – Built by Kawasaki Rail Car Company. The first model of NTTs for the B Division, assigned to the L. Entered service on February 12, 2002.[12] Equipped with CBTC, the first subway car to be equipped with this feature.[8] The R143s are similar to the R160s and R179s.[8][13][14]
  • R160 – Built by Alstom and Kawasaki Rail Car Company. Used by the B Division. There are two subtypes since these cars were built by two different manufacturers. R160As were built by Alstom, while R160Bs were built by Kawasaki. The R160Bs entered service on August 17, 2006, while the R160As entered service on October 17, 2006. Currently, the R160s are assigned to the E, F, G, J/Z, L, M, and R routes. 17 four-car sets have CBTC for the L. An additional 309 sets, configured in four and five-car sets, will be equipped with CBTC for the IND Queens Boulevard Line, which the E, F, M, and R routes run on.[15] The R160s are similar to the R143s and R179s; however, none of them are interchangeable.[2][8][14][16][13]
  • R188 – Built by the Kawasaki Rail Car Company. The R188s entered service on December 15, 2013.[17] They are used exclusively on the 7 route of the A Division, and thus is grouped in eleven-car trains, and are CBTC equipped. The order consists of 380 converted R142A cars and of 126 identical newly built cars. The R188s are similar to the R142s in addition to being nearly identical to the R142As.[10][11]
  • R179 – Built by Bombardier Transportation. Used by the B Division. The first car to be delivered, numbered 3014, arrived at 207th Street Yard on September 6, 2016.[18] The R179s entered service on December 27, 2017.[19] All cars were delivered by the end of December 2019.[20] Currently, the R179s are assigned to the A, C, F, Rockaway Park Shuttle, M, and J/Z routes.[21] The R179s are similar to the R160s and R143s.[8][10]
  • R211 – Built by Kawasaki Rail Car Company. The first NTT train model with a redesigned appearance. Used by the B Division and the Staten Island Railway. 20 cars are open-gangway experimental prototype cars. Currently, the R211s are assigned to the A, C, and Rockaway Park Shuttle routes, in addition to the Staten Island Railway. Will also have Wi-Fi, security cameras, digital video screens, and electronic charging stations.[22] The R211 introduces a new exterior and interior not present on previous NTT orders.[10][23][24]

Future

edit
  • R262 – Will be used by the A Division. Will be equipped with communications-based train control and Ethernet systems. May include open gangways. Manufacturer has not been announced.[5]: 25 
  • R268 – Briefly mentioned in a June 2023 pre-award MTA document along with the R262. No additional information has yet been announced. May replace the R68s and R68As.[25]

Retired

edit
  • R110A – Contract number was R130. Built by Kawasaki Rail Car Company and used mainly on the 2 route. Was a prototype train for the A Division that operated from 1993 to 1999. Used to test out new technology features that would be incorporated into the R142 car order. Was not intended for long-term production use.[8][26][27] All B-cars of the set were converted into pump cars between 2013 and 2014.[28][29] All A-cars set to be converted in the future.[30]
  • R110B – Contract number was R131. Built by Bombardier Transportation and used mainly on the A route. Also ran on the C route for final years in service. Was a prototype train for the B Division that operated from 1993 to 2000. Designed to test various new technology features that would eventually be incorporated into the R143 car order and was also not intended for long-term production use.[8][26][27] Five cars were sent away, while four cars remain at 207th Street Yard.

History

edit
 
Two R110B cars, the B Division NTT prototype, stored at 207th Street Yard

The New Technology program emerged from modernization efforts by the Metropolitan Transportation Authority (MTA) beginning in 1982, when the subway "was on the verge of collapse".[26][31][32] The New Technology program officially began in 1988, the first effort at a technologically advanced subway car since the R44 in the early 1970s.[33] In 1989, the MTA awarded contracts for two prototype test trains: the R110A (contract R130) for the A Division built by Kawasaki Heavy Industries, and the R110B (contract R131) for the B Division built by Bombardier Transportation.[1][26] The two New Technology test trains (NTTTs)[8][26] began service in June 1993, testing features that would be implemented on future mass-production orders.[26][33][34] Both trains were taken out of service by 2000, due to multiple issues with the trains.[27]

In 1997, the first mass order of New Technology trains was placed for the R142 and R142A trains of the A Division (awarded to Bombardier and Kawasaki respectively), in order to replace the final 1,410 Redbird cars in operation.[34][35] In 1998, a smaller contract of 212 cars, consisting of 100 in the base order and 112 in the optional order, was awarded to Kawasaki Heavy Industries, to build the R143 model for the B Division's BMT Eastern Division (primarily the BMT Canarsie Line's L train).[36] The first R142s and R142As entered service beginning in July 2000.[2][7][37] The R143s began operation in February 2002.[12][38]

 
The interior of a R160A in 2010 on an E train
 
A R211A A train at Inwood–207th Street station, showcasing the new exterior appearance.

In July 2002, the MTA awarded contracts to Kawasaki and Alstom for the R160 order for the B Division, with options for up to 1,700 cars to replace many 1960s- and 1970s-era cars.[39][12][8][14] The first R160 train, built by Kawasaki under the contract R160B, began service on August 17, 2006, on the N.[16] The initial 660-car base order was filled by October 2008, with a total of 1,662 cars delivered by May 6, 2010.[2][10]

On May 5, 2010, Kawasaki was awarded the contract for the R188 A Division order, to provide 46 CBTC-ready 11-car trains for the IRT Flushing Line (7 and <7>​ trains). Unlike the other orders, the R188 constructed only 126 new subway cars, with the remaining 380 cars consisting of converted R142As.[10][11][17] The first R188s entered service on November 9, 2013.[17]

On June 4, 2012, Bombardier was awarded the R179 contract for 300 new B Division cars, to replace the 50 R42s on the BMT Jamaica Line (J and ​Z trains).[10][11][40] In December 2012, preliminary designs began on the R211 B Division contract, which entails 940 cars in order to expand the system fleet, and to replace the R46 fleet, and the R44 fleet of the Staten Island Railway; both models were built in the 1970s.[11] Both the R179 and R211 orders were supposed to replace the 222 remaining R32 cars, which were built in the 1960s and have run well past their expected lives, by the year 2022.,[41][42][18] however, in January 2020, it was decided that the R179 fleet was to replace all remaining R32s.[43] The R179 order fell significantly behind schedule,[10][11] with first test train delivered in September 2016.[44][45][18]

On January 19, 2018, the MTA Board suggested that Kawasaki Rail Car Corp., a subsidiary of Kawasaki Heavy Industries, be awarded the $3.7 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with open gangways; 75 R211S cars for the Staten Island Railway, to be delivered near the end of the base order; and 440 cars similar to the R143/R160 series, operating in five-car units.[46] The cars will be assembled at Kawasaki's factories in Lincoln, Nebraska, and Yonkers, New York.[46] After multiple delays, the first R211A test train was delivered in July 2021, with the production cars being delivered between 2021 and 2023.[47] The first of the R211Ts were delivered on October 31, 2022.[48][better source needed] On March 10, 2023, the R211As were placed into revenue service on the A for a 30-day in-service acceptance test.[49][50]

In January 2019, the MTA announced that the R262s would be replacing the R62 and R62A fleets, a new fleet that would be ordered as part of a future capital program.[5]: 25 

In June 2023, the MTA hinted towards the existence of the R268 subway car contract. More information is to be announced.[25]

Design and features

edit
A driver's cab of a R160A subway car on an N train
A DCS (right) installed on a R188 car in 7 service

The NTT models utilize a common car design; stainless-steel car bodies with a black (blue on the R211) front fascia on the "A" (cab) cars, open lexan-glass windows on non-cab ends allowing passengers to see through to the next car, and electronic outer route signs, as opposed to the rollsigns used by previous models.[1][33][34] Improvements to the conductors' interface include the addition of speedometers as well as electronic consoles that monitor mechanical problems that may occur on the train.[34] The cars feature a white fiberglass interior with blue-gray plastic bench seats both to combat vandalism, along with bright fluorescent lighting and LED interior passenger information signs.[1][33][34] The bench-style seats, designed with lumbar supports, also replaced the bucket-style seats used on rolling stock built in the 1970s and '80s, which were uncomfortable for some passengers and harder to clean.[1] The trains utilize an airbag suspension (replacing conventional springs) for a more comfortable ride, and employ regenerative braking which converts the energy from brake application into electricity that is fed back into the third rail.[1][34][4][51]

All NTT trains are capable of being equipped with communications-based train control (CBTC) technology, which is installed in the "A" cars behind the train operator's cab.[13][39][12] Until the late 2010s, only the R143s and R188s, as well as sixty-eight R160As, had been upgraded for automated service on the L and 7 routes.[11][8][52] During the late 2010s and early 2020s, most of the remaining R160s were also retrofitted with CBTC.[6] All existing cars in the R142 and R142A fleets[5]: 23–25  and future cars in the R211[53] and R262 fleets will also be equipped with CBTC in the future.[5]: 23–25 

Recorded announcements

edit

The NTTs are the first rolling stock in the system to utilize pre-recorded train announcements, as opposed to live announcements from conductors. The recorded announcements are used for station information, closing doors, and other general messages. Station announcements rely on a wheel-rotation counter to make accurate stop announcements.[54] The recordings began in the late 1990s and feature Bloomberg Radio on-air speakers, who volunteered at the request of their employer Michael Bloomberg, who would later become mayor of New York City.[8][55] Voices include Dianne Thompson (for the 1, 2, and 3 (and the discontinued 9) trains), Melissa Kleiner (original voice of the 4 and 5 trains outside of Manhattan), Jessica Ettinger Gottesman (current voice for the 4, 5, and 6 trains), Annie Bergen (for the 7 train and 42nd Street Shuttle), Catherine Cowdery (for the B, D, E, G, J, L, M, N, Q, R, (V discontinued), W, and Z trains), Kathleen Campion (for the A, C, and F trains, as well as the Franklin Avenue Shuttle and Rockaway Park Shuttle), and Charlie Pellett (for other announcements).[55][56] Since 2018, Velina Mitchell has also done some of the announcements formerly performed by Pellett, particularly informational messages and station accessibility information.[57]

Female voices are typically used for station, route, and transfer/connection announcements, although Pellett announces the majority of the transfers on the A Division instead of the female voices. Pellett's recordings are used for most of the remaining announcements, most notably "Stand clear of the closing doors, please" before train doors closing, but also for safety announcements such as "Please be careful of the gap between the platform and the train" before entering a station with curved platforms, and "If you see something, say something."[55][56][58] With regard to why certain messages are voiced by males and others by females, MTA spokesperson Gene Sansone said in 2006, "Most of the orders are given by a male voice, while informational messages come from females. Even though this happened by accident, it is a lucky thing because a lot of psychologists agree that people are more receptive to orders from men and information from women."[56][59] Manual announcements can still be made over the public address system by train operators and conductors.[34][54]

In January 2020, as part of an agreement between the MTA and Comedy Central to promote actress Awkwafina's TV show Nora From Queens, the default pre-recorded announcements for the 7 train on the R188s were replaced with those from Awkwafina for one week. The announcements from Awkwafina featured jokes in addition to the standard station announcements.[60][61][62] The agreement was the first time that the MTA has replaced train announcements as a form of advertising.[63] In April 2024, the MTA indicated that it would record public service announcements by celebrities, which would be played on New Technology Trains for one year as part of a pilot program.[64][65]

Electronic strip maps

edit
An electronic strip map on a R142 4 train
An electronic strip map on a R143 L train

The R142s, R142As, R143s, and R188s feature electronic "strip maps." These maps utilize a total of 63 amber LED lights, numbered 001–063, to display stops, with a plastic card on top showing the route, stations, and transfers. A light will flash when a stop is being approached, and while idle at that stop. Lights turned off to indicate a stop already reached, or a part of the route not serviced on that particular trip.[1][26][39] LED arrows at either end of the map indicate the direction of service.[66]

Electronic strip maps were first tested on the R110A and R110B in the 1990s.[26][34] While an upgrade from static route maps, most of the strip maps can only facilitate one service and must be turned off when a train is used on another route.[13] This problem is common on the 2 and 5 trains, which both use R142 cars based from the East 180th Street and 239th Street yards and have large amounts of route overlap on the IRT White Plains Road, Eastern Parkway, and Nostrand Avenue lines.[66] The problem is also seen occasionally on the J/Z and L trains, which use R143 cars from the East New York yard that is shared by all three services. To solve this problem, the MTA began replacing the individual strip maps for cars assigned to these routes in 2016, with combined strip maps showing both services;[66] the R143s would later be retrofitted with strip maps that also show all stops used by all three services beginning in late 2019.[67][better source needed]

Digital displays

edit

Wayfinding displays

edit
The FIND display system on an R160.
The digital display system on an R211.

The R160s, R179s, and R211s employ digital display systems as an advanced alternative to strip maps. These systems update the stations at every stop, also giving the number of stops to each station listed. As the displays can be used by multiple routes instead of one, this allows for instant route or line changes with the correct information, which includes, but is not limited to, omitting certain stops (displayed as "Will not stop" in red).[33][11][13]

The R160s and R179s employ a system called the Flexible Information and Notice Display, or FIND. There are three of these in every car. This includes an LCD screen displaying the route, route information, and advertisements, as well as a dynamic red, yellow, and green LED strip map that displays the next ten stations, plus five consecutive "further stops" to riders. Although they function the same on both models, the FIND systems used on the R179s have slight differences. The LCD displays where the route's emblem is displayed are slightly larger than those on the R160s. If the FIND has gone blank, the R179 FIND displays "Route change: this map is not in use", as opposed to the R160 FIND, which displays "Listen to train crew for announcement."[33][11][68][69]

The R211 introduces a new digital display system, known as the Flexible Ceiling Strip Display (FCSD). There are eight of these in each car, located above each set of doors.[70]: 338  An LCD strip map displays the next ten stations, plus consecutive "further stops". The screens of the R211s have the ability to display additional information when arriving at a station, such as specific bus transfers, elevator locations, and which car the customer is located in.[70]: 338  When the display is not being used for wayfinding purposes, the FCSD will show the text "Route Change: This Map is Not in Use", a media display, or an informational message.[70]: 341 

Advertising displays

edit

New Technology Trains built between the 1990s and mid-2010s did not originally have digital advertising displays. In September 2017, the MTA announced plans to add 31,000 digital advertising screens in 5,134 cars,[71] which were installed by Outfront Media starting in 2019.[72][73] In 2020, the MTA started displaying real-time service metrics on the screens, such as service changes and dynamic transfer information.[74][75]

In the R211s, twelve digital advertising displays may be installed in each car, six on either side.[70]: 338  There are also provisions for eight Flexible Wall Displays, which are to be mounted next to the door leaves.[70]: 339–340 

References

edit
  1. ^ a b c d e f g Sims, Calvin (May 9, 1990). "For This Project, Subway Cars Are the Stuff of Dreams". The New York Times. Archived from the original on February 3, 2016. Retrieved January 24, 2016.
  2. ^ a b c d e f "New Technology Train Rolled Out This Morning Along the E Line". Metropolitan Transportation Authority. December 22, 2008. Archived from the original on October 26, 2021. Retrieved December 7, 2015.
  3. ^ "The MTA 2006 ANNUAL REPORT: Comprehensive Annual Financial Report for the Year Ended December 31, 2006 Comprehensive Annual Financial Report for the Year Ended December 31, 2006" (PDF). Metropolitan Transportation Authority. May 1, 2007. Archived (PDF) from the original on March 18, 2020. Retrieved December 28, 2015.
  4. ^ a b "New York City Transit and the Environment". Metropolitan Transportation Authority. Archived from the original on January 30, 2016. Retrieved January 24, 2016.
  5. ^ a b c d e "Capital Program Oversight Committee Meeting" (pdf). Metropolitan Transportation Authority. January 2019. Archived (PDF) from the original on November 20, 2021. Retrieved January 18, 2019.
  6. ^ a b "Capital Program Oversight Committee Meeting 7/24/2017" (PDF). Metropolitan Transportation Authority. July 24, 2017. p. 18. Archived (PDF) from the original on September 1, 2017. Retrieved October 28, 2017.
  7. ^ a b c "New York City Transit - History and Chronology". Metropolitan Transportation Authority. Archived from the original on January 8, 2014. Retrieved July 14, 2016.
  8. ^ a b c d e f g h i j k l Gene Sansone (October 25, 2004). New York Subways: An Illustrated History of New York City's Transit Cars. JHU Press. pp. 273–282. ISBN 978-0-8018-7922-7.
  9. ^ a b "New York subway orders". Railway Gazette International. June 1, 2003. Archived from the original on September 17, 2016. Retrieved September 9, 2016.
  10. ^ a b c d e f g h "Capital Program Oversight Committee Meeting: October 2012" (PDF). Metropolitan Transportation Authority. October 2012. Archived from the original (PDF) on February 5, 2016. Retrieved July 14, 2016.
  11. ^ a b c d e f g h i "MTA Capital Program Oversight Committee Meeting: January 2016" (PDF). mta.info. Metropolitan Transportation Authority. January 2016. Archived from the original (PDF) on January 29, 2016. Retrieved January 23, 2016.
  12. ^ a b c d Kennedy, Randy (July 31, 2002). "1,700 Subway Cars to Be Built Under Largest Such Contract in New York History". The New York Times. p. B3. Archived from the original on May 10, 2017. Retrieved February 11, 2017.
  13. ^ a b c d e Chan, Sewell (November 30, 2005). "New Subway Cars Promise All Kinds of Information". The New York Times. Archived from the original on March 15, 2023. Retrieved October 27, 2007.
  14. ^ a b c "Subway contract won with help from Brazil". Railway Gazette International. January 1, 2003. Archived from the original on March 10, 2016. Retrieved January 27, 2016.
  15. ^ "Capital Program Oversight Committee Meeting" (PDF). Metropolitan Transportation Authority. January 2020. Archived from the original on April 5, 2023. Retrieved May 14, 2024.
  16. ^ a b Lueck, Thomas J. (August 18, 2006). "City Subways Put New Cars Into Service as a Test Run". The New York Times. Archived from the original on May 10, 2017. Retrieved January 24, 2016.
  17. ^ a b c "MTA | news | New Subway Cars Being Put to the Test". New.mta.info. November 18, 2013. Archived from the original on May 15, 2014. Retrieved August 24, 2014.
  18. ^ a b c Barone, Vincent (September 6, 2016). "New MTA subway cars to arrive for testing, will replace oldest fleet". AM New York. Archived from the original on September 7, 2016. Retrieved September 8, 2016.
  19. ^ Metropolitan Transportation Authority (January 22, 2018). "Capital Program Oversight Committee Meeting" (PDF). p. 46. Archived (PDF) from the original on January 20, 2018. Retrieved January 19, 2018.
  20. ^ https://m.facebook.com/BombardierRail/photos/a.902865919774651/2806951702699387/?type=3 Archived July 20, 2020, at the Wayback Machine [user-generated source]
  21. ^ "Subdivision 'B' Car Assignments: Cars Required September 16, 2019" (PDF). The Bulletin. 62 (10). Electric Railroaders' Association: 16. October 2019. Archived (PDF) from the original on December 5, 2019. Retrieved December 5, 2019.
  22. ^ "NYC, meet your (possible) subway cars of the future". am New York. January 25, 2016. Archived from the original on November 8, 2020. Retrieved April 25, 2016.
  23. ^ "Governor Cuomo Unveils Design of Reimagined MTA Subway Cars and Details Ambitious Plan to Enhance Subway Stations". July 18, 2016. Archived from the original on August 5, 2016. Retrieved July 19, 2016.
  24. ^ "MTA renderings" (PDF). www.governor.ny.gov. July 18, 2016. Archived (PDF) from the original on September 19, 2016. Retrieved July 18, 2016.
  25. ^ a b "Non-construction Contract Solicitation Notice". Metropolitan Transportation Authority. June 9, 2023. Retrieved June 9, 2023.
  26. ^ a b c d e f g h "Transit Cooperative Research Program Report 46: The Role of Transit Amenities and Vehicle Characteristics in Building Transit Ridership: Amenities for Transit Handbook and The Transit Design Game Workbook; PART 2: IMPACTS OF AMENITIES" (PDF). Washington, D.C.: Transportation Research Board, Project for Public Spaces, National Academy Press. 1999. Archived (PDF) from the original on September 10, 2016. Retrieved January 24, 2016.
  27. ^ a b c Campanile, Carl (July 21, 1999). "NEW $2M SUBWAY CARS GET OFF ON THE WRONG TRACK; EXCLUSIVE". Daily News (New York). Archived from the original on September 21, 2016. Retrieved September 9, 2016.
  28. ^ "Capital Program Oversight Committee Meeting June 2014" (PDF). mta.info. Metropolitan Transportation Authority. June 23, 2014. Archived from the original (PDF) on March 16, 2016. Retrieved July 24, 2016.
  29. ^ "Metropolitan Transportation Authority (MTA) Notice of Public Hearing and Description of Projects – Tuesday, August 23, 2016 4:30 P.M. – Request for Federal Financial Assistance Under the Federal Transportation Authorization For Federal Fiscal Year 2017 Capital Improvement Projects" (PDF). mta.info. Metropolitan Transportation Authority. July 28, 2016. p. 37. Archived from the original (PDF) on August 17, 2016. Retrieved August 23, 2016.
  30. ^ Negron, Daniel (February 14, 2013). "Showing Image 138752". nycsubway.org. Archived from the original on March 5, 2016. Retrieved July 24, 2016.
  31. ^ Chan, Sewell (July 27, 2005). "Damaged Cars Hinder New York's Order for New Subways". New York Times. Archived from the original on June 30, 2013. Retrieved August 30, 2009.
  32. ^ "A Review of the Proposed Capital Program for the Metropolitan Transportation Authority" (PDF). Office of the New York State Comptroller. September 2009. Archived (PDF) from the original on October 24, 2016. Retrieved January 24, 2016.
  33. ^ a b c d e f Seaton, Charles (December 6, 2006). "New York City Bringing Rail Into the 21st Century". Metro Magazine. Archived from the original on February 3, 2016. Retrieved January 27, 2016.
  34. ^ a b c d e f g h Pierre-Pierre, Garry (January 22, 1997). "After a Few Suggestions, City Presents Subway Cars With Seats of Amplitude". The New York Times. Archived from the original on February 3, 2016. Retrieved January 24, 2016.
  35. ^ "Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS); Chapter 2: Project Alternatives" (PDF). Metropolitan Transportation Authority, Federal Transit Administration, United States Department of Transportation. April 2003. Archived (PDF) from the original on December 5, 2019. Retrieved January 24, 2016.
  36. ^ "Metro Business; Subway Job to Kawasaki". The New York Times. December 30, 1998. Archived from the original on March 5, 2016. Retrieved February 11, 2017.
  37. ^ Siegal, Nina (October 1, 2000). "NEIGHBORHOOD REPORT: NEW YORK UNDERGROUND; 2 New Trains in the Subways: Catch Them if You Can". The New York Times. Archived from the original on February 3, 2016. Retrieved January 24, 2016.
  38. ^ "Kawasaki completes NYCT R143 order. (Market).(New York City Transit)(subway cars contract)". Railway Age. March 1, 2003. Archived from the original on February 20, 2016.
  39. ^ a b c Press Release (July 31, 2002). "MTA NYC TRANSIT AWARDS NEW CAR CONTRACT". Metropolitan Transportation Authority. Archived from the original on February 3, 2006. Retrieved July 14, 2016.
  40. ^ "R179 Staff Summary" (PDF). Archived (PDF) from the original on October 15, 2013. Retrieved January 28, 2016.
  41. ^ "Review of the A and C Lines" (PDF). Metropolitan Transportation Authority. December 11, 2015. Archived (PDF) from the original on February 3, 2020. Retrieved January 19, 2016.
  42. ^ Rivoli, Dan (August 13, 2015). "Ancient subway trains on C and J/Z lines won't be replaced until 2022, documents say". Daily News (New York). Archived from the original on November 26, 2015. Retrieved November 25, 2015.
  43. ^ Bechtel, Allyson (April 24, 2020). "Car assignments – effective April 27, 2020". New York City Transit. Archived from the original on April 26, 2020. Retrieved April 25, 2020.
  44. ^ "Photo by David Paul Gerber". Photobucket. September 6, 2016. Archived from the original on September 21, 2016. Retrieved September 7, 2016.
  45. ^ "Exclusive: New subway cars to arrive for testing this week". September 6, 2016. Archived from the original on September 7, 2016. Retrieved September 7, 2016.
  46. ^ a b Maslin Nir, Sarah (January 19, 2018). "New York Set to Acquire the Next Generation of Subway Cars". The New York Times. Archived from the original on January 20, 2018. Retrieved January 20, 2018.
  47. ^ Metropolitan Transportation Authority (January 22, 2018). "Capital Program Oversight Committee Meeting" (PDF). pp. 39–40. Archived (PDF) from the original on January 20, 2018. Retrieved January 19, 2018.
  48. ^ Hammers, DJ (November 1, 2022). "New Prototype R211T Open-Gangway Test Train Delivered to New York City!". YouTube. Archived from the original on November 2, 2022. Retrieved November 4, 2022.
  49. ^ Lin, Sarah Belle (March 10, 2023). "Latest subway cars roll into service, start their journey on the a line | amNewYork". amNewYork. Archived from the original on March 10, 2023. Retrieved March 10, 2023.
  50. ^ "New MTA subway cars roll out on the A line". Spectrum News NY1 New York City. March 10, 2023. Archived from the original on March 10, 2023. Retrieved March 10, 2023.
  51. ^ "Feasibility Study of On-Car Regenerative Braking System (RBS) for Electric Rail Applications Final Report". ny.gov. New York State Energy Research and Development Authority. January 11, 2013. Archived from the original on March 15, 2023. Retrieved January 24, 2016.
  52. ^ "Volume 2, Part 3 - November 2008 MTA Financial Plan: Section IV-3 and section IV-12" (PDF). Metropolitan Transportation Authority. Archived (PDF) from the original on May 10, 2017. Retrieved July 19, 2016.
  53. ^ "New York City Transit and Bus Committee Meeting October 2018" (PDF). mta.info. Metropolitan Transportation Authority. October 19, 2018. pp. 188–189. Archived from the original (PDF) on October 20, 2018. Retrieved October 20, 2018.
  54. ^ a b Biederman, Marcia (December 12, 2002). "For Subway Riders, a Sense of Place". The New York Times. Archived from the original on February 3, 2016. Retrieved January 24, 2016.
  55. ^ a b c "The voice behind the closing doors would like to clear something up". nypress.com. Straus News. March 18, 2003. Archived from the original on September 20, 2018. Retrieved December 7, 2015.
  56. ^ a b c "GUIDED BY SUBTERRANEAN VOICES". whosevoice.com. January 4, 2010. Archived from the original on January 5, 2016. Retrieved December 7, 2015.
  57. ^ Mauceri, Joe (May 16, 2018). "Meet the new voice of the NYC subway system". WPIX 11 New York. Archived from the original on February 16, 2019. Retrieved February 16, 2019.
  58. ^ Shaweddy, Vici (January 11, 2013). "Charlie Pellett - The Voice of New York Subway". YouTube. Archived from the original on November 19, 2015. Retrieved December 7, 2015.
  59. ^ AM New York (September 25, 2006): "Voices Down Below", by Justin Rocket Silverman
  60. ^ Goldbaum, Christina (January 16, 2020). "Awkwafina's Latest Role: Subway Announcer. New Yorkers Have Thoughts". The New York Times. ISSN 0362-4331. Archived from the original on January 17, 2020. Retrieved January 17, 2020.
  61. ^ "'Stop Manspreading!': Queens Native Awkwafina Takes Over 7 Train Subway Announcement". NBC New York. January 16, 2020. Archived from the original on January 17, 2020. Retrieved January 17, 2020.
  62. ^ "Queens-born actress Awkwafina will voice 7 train announcements for a week before her new show premieres". amNewYork. January 16, 2020. Archived from the original on May 18, 2020. Retrieved January 17, 2020.
  63. ^ "The MTA Is Now Turning Subway Announcements Into Ads, Starting With Awkwafina". Gothamist. January 16, 2020. Archived from the original on January 17, 2020. Retrieved January 17, 2020.
  64. ^ Rahmanan, Anna (April 26, 2024). "Celebrity voices will be trying to sell you stuff on the subway now". Time Out New York. Retrieved April 28, 2024.
  65. ^ Martinez, Jose (April 26, 2024). "More Celebrity Voices and Promo Spots Coming to Subway Stations and Trains". THE CITY - NYC News. Retrieved April 28, 2024.
  66. ^ a b c "New Interior Electronic Strip Maps Coming to Subway Cars on 2 5 Lines". Metropolitan Transportation Authority. February 12, 2016. Archived from the original on February 12, 2016. Retrieved February 12, 2016.
  67. ^ "JamaicaZ160". www.facebook.com. Archived from the original on March 15, 2023. Retrieved September 26, 2020.
  68. ^ Chan, Sewell (November 30, 2005). "New Subway Cars Promise All Kinds of Information". The New York Times. Archived from the original on March 15, 2023. Retrieved October 27, 2007.
  69. ^ Samuel, Jvoan (September 2016). "R179 interior of #3014 in 207th Street Yard". Archived from the original on December 16, 2016. Retrieved September 10, 2016.
  70. ^ a b c d e "New York City Transit Contract R34211; R211 Technical Specification" (PDF). New York City Transit Authority. February 2018. Archived from the original (PDF) on October 17, 2022. Retrieved July 11, 2023.
  71. ^ Plitt, Amy (September 27, 2017). "NYC subway to get thousands of digital ad screens". Curbed NY. Retrieved September 30, 2017.
  72. ^ Rivoli, Dan (February 26, 2019). "Subway stations and train cars will get thousands of new digital screens, earning the MTA millions of dollars". New York Daily News. Retrieved July 12, 2023.
  73. ^ Barone, Vincent (February 25, 2019). "Subway cars and stations will get more digital screens to boost ad revenue". amNewYork. Retrieved July 12, 2023.
  74. ^ Rivoli, Dan (July 7, 2020). "MTA Installing Thousands of New Digital Screens in Stations and Subway Cars". Spectrum News NY1 | New York City. Retrieved July 7, 2020.
  75. ^ Guse, Clayton (July 7, 2020). "MTA to spend $100M on 9,000 digital screens for ads across NYC subway". nydailynews.com. Retrieved July 7, 2020.
edit