Marlborough railway stations

Marlborough railway stations refers to the two railway stations which served Marlborough, Wiltshire, England, until 1964.

Marlborough High Level
Marlborough railway stations, early 1900s postcard
General information
LocationMarlborough, Wiltshire
England
Other information
StatusDisused
History
Original companyMarlborough Railway
Pre-groupingGreat Western Railway
Post-groupingGreat Western Railway
Key dates
1864 (1864)Opened
1933 (1933)Closed for passengers
1964 (1964)Closed for goods
Marlborough Low Level
General information
LocationMarlborough, Wiltshire
England
Other information
StatusDisused
History
Original companySwindon, Marlborough and Andover Railway
Pre-groupingMidland and South Western Junction Railway
Post-groupingGreat Western Railway
Key dates
1881 (1881)Opened
1961 (1961)Closed for passengers
1964 (1964)Closed for goods

The stations were on separate routes. A branch line was built by an independent railway friendly to the Great Western Railway (GWR) from Savernake to Marlborough in 1864. A north–south railway, later to be part of a long-distance trunk route, opened from Swindon to its own station at Marlborough in 1881, extending south to Andover in 1881. The two routes came under the same management at the "Grouping" of the railways in 1923 and some rationalisation took place. Passenger services to Marlborough were withdrawn in 1961 and goods services in 1964.

The Great Western Railway Branch

edit
Marlborough and Savernake Area
 
Marlborough (GWR)
 
 
Marlborough
 
 
link (
1883–1898
1926–1964
)
Marlborough
Goods
(GWR)
 
 
 
 
 
Marlborough tunnel
Burbage Wharf goods
 
 
 
link (1933–1964)
 
 
 
Savernake Low Level
 
 
Savernake High Level
 
 
 
 
 
 
Grafton and Burbage
 

Marlborough Railway

edit

On 11 November 1862, the Berks and Hants Extension Railway (B&HER) opened a broad gauge railway line from Hungerford, itself originally the terminus of a branch line from Reading, to Devizes.[1] At Devizes the new line linked up with the Wilts, Somerset and Weymouth Railway branch line from Trowbridge which had opened in 1857. The line was worked by the larger Great Western Railway (GWR).[2][3]

Although Marlborough was an important market town, the new B&HER main line passed some distance to the south, near the village of Burbage. Local businessmen promoted an independent branch line, the Marlborough Railway, to connect their town to the Savernake station of the B&HER, north of Burbage. It opened on 15 April 1864; it was 5 miles 49 chains (9.0 km) in length, and built using the broad gauge. There were no intermediate stations, and trains departed from a new platform at Savernake.

This line too was worked by the GWR, and the B&HER and the Marlborough Railway were absorbed by the Great Western Railway in 1886; the Marlborough Railway was purchased for £9,250 in cash. Both lines were converted to standard gauge in 1874.[4]

Marlborough GWR station

edit

The GWR station in Marlborough was to the south-east of the town centre, on the west side of Salisbury Road; it had a substantial L-shaped red brick building with waiting rooms for both first-class and ordinary passengers. It had a single platform, and goods facilities were provided at the northern end.[5] There was also a separate goods yard to the south of the station and an engine shed to the north-east near the buffer stops.

 
Poster for road motor service to Calne, 1904

Marlborough GWR station became the focus for road traffic in the area, with horse buses at first along the Bath road; motor buses were introduced in 1904. Many of the bus services were operated by the GWR.[5]

The Midland and South Western Junction Railway

edit

The Swindon, Marlborough and Andover Railway

edit

Original plans for railways in the Marlborough area had focused on a scheme for a north–south line to link Swindon with Andover, passing through Marlborough. Though the GWR branch line got to Marlborough first, the north–south plans were revived with an Act in 1873, and the Swindon, Marlborough and Andover Railway was built in two halves. The northern section, from Swindon Town south to Marlborough, was opened in July 1881; the southern section, from Andover Junction north to Grafton and Burbage, opened the following year, 1882.[6]

The new Marlborough station opened as a terminus just to the east of the existing GWR station. It had a station building on the up platform (towards Swindon) with a huge canopy. There was a goods yard behind the up platform to the north-west of the passenger station, with a large goods shed.[6]

edit

Having built its lines from the north and the south, the financially strapped SM&AR then found that it could not join them, being unable to afford to persuade landowners to sell their property to build the missing link. Instead, it built a short link within Marlborough to the GWR branch line just south of Marlborough GWR station and another link from the GWR's Berks and Hants Extension Railway just east of Savernake station southwards to Grafton and Burbage station. From February 1883, SM&AR through trains used the GWR Marlborough branch and a short section of the B&HER main line, including Savernake station. A condition of the GWR lease was that passengers wanting to change at Savernake to other GWR services had to use the GWR trains from Marlborough.[7]

The Swindon and Cheltenham Extension Railway

edit

In 1884, the SM&AR combined with the Swindon and Cheltenham Extension Railway, which ran northwards from Swindon Town, first to Cirencester and then, from 1891, into Cheltenham Lansdown. The combined line was called the Midland and South Western Junction Railway (M&SWJR) and with its links northwards from Cheltenham to the Midlands and southwards from Andover over the Sprat and Winkle Line to the south coast ports it became a true through line.

The Marlborough and Grafton Railway

edit
 
Marlborough and Savernake lines in 1922

With the northern extension to Cheltenham complete, the M&SWJR turned its attention in the early 1890s to resolving its problem at Marlborough, where it was paying £1,000 a year to run over the GWR Marlborough branch tracks. The company negotiated successfully with the Marquess of Ailesbury to run a new line from the M&SWJR station in Marlborough, through a 640-yard tunnel and across Savernake Forest. The new section then crossed the GWR's Berks and Hants Extension line and joined the southern section of the original SM&AR line just north of Grafton and Burbage station.[7]

The new double-track section was called the Marlborough and Grafton Railway and was given parliamentary approval in 1893. It opened for through traffic on 26 June 1898, at which point the link just outside Marlborough station to the GWR branch line was closed. The only intermediate station on the new section was at Savernake, about 200 yards from the GWR Savernake station but not connected to it.

The Marlborough and Grafton Railway was formally taken over by the M&SWJR in 1899, and for the next quarter century Marlborough had regular services on both lines. The April 1910 timetable, for example, shows each line offering about eight services a day, though the GWR did not run trains on Sundays.[8]

Rationalisation after the Grouping

edit

Station renaming

edit

The Railways Act 1921 grouped most of the railways in mainland Great Britain into four large companies, and the Midland and South Western Junction Railway was incorporated into the Great Western Railway, its rival for the rail traffic at Marlborough. For a few years, the GWR did nothing to rationalise the anomaly of having two parallel lines running into the town, but it did rename the stations. Confusingly the former GWR stations were named Marlborough High Level and Savernake Low Level, while the former M&SWJR stations were renamed as Marlborough Low Level and Savernake High Level.

edit

In 1926, the GWR reopened the 1883 link between the two lines just outside the two Marlborough stations, enabling trains from the main line junction at Savernake Low Level to pass through Marlborough on to the north.

edit

Further changes came in 1933. The GWR built a second link between its original branch line and the M&SWJR line much nearer Savernake and closed the original branch and station in Marlborough to passenger traffic. The goods yard at Marlborough GWR station was retained, but was accessed from the north through the Marlborough M&SWJR station using the link that had been restored in 1926.

All passenger services were rerouted to the M&SWJR station at Marlborough. The GWR chose to operate the double track M&SWJR line as two separate single track lines: the former up line (towards Swindon) was used for the branch services from Savernake Low Level while the through north–south services which passed through Savernake High Level all ran on the former down line. This odd arrangement persisted into British Railways days.[7]

Decline and closure

edit

World War II

edit

The Midland and South Western Junction line was very heavily used for troop and other military movements across Salisbury Plain in the Second World War, but after the war both passenger and goods traffic declined sharply in competition with road transport. Marlborough, about midway between London and Bath/Bristol, had become a focus for long-distance east–west bus services and the railway found it difficult to compete.

Closure

edit

The whole line closed for passenger services in 1961, including the remaining branch line service from Savernake Low Level. Before the closure, there had been one last twist in the intertwined history of the two lines and the various stations. In September 1958, a landslip blocked the main line close to Savernake High Level station. Through services were diverted back through Savernake Low Level, as they had been from 1883 to 1898, but this time using the later 1933 link between the lines, and Savernake High Level station closed. This arrangement, however, lasted only three years until passenger services were withdrawn.

Goods traffic continued to Marlborough from Savernake for a further three years, with the GWR station's goods yard remaining open until May 1964 and the M&SWJR station's goods facilities holding on until September 1964. There were occasional passenger services too in this period, associated with Marlborough College excursions.

The sites today

edit

Both Marlborough stations have disappeared beneath new developments in the town.[5][6]

Routes

edit

Marlborough High Level

edit
Preceding station   Disused railways   Following station
Terminus   Great Western Railway
Marlborough Railway
  Savernake Low Level
1864-1933

Marlborough Low Level

edit
Preceding station   Disused railways   Following station
Ogbourne
1881-1961
  Midland and South Western Junction Railway
Swindon, Marlborough and Andover Railway
  Savernake High Level
1898-1958
    Savernake Low Level
1883-1898,1958-1961
Terminus   Great Western Railway
Marlborough Railway
  Savernake Low Level
1933-1958

References

edit
  1. ^ E T MacDermot, History of the Great Western Railway, vol. 1 part II, published by the Great Western Railway Company, London, 1927
  2. ^ E T MacDermot, History of the Great Western Railway, vol. 1 part I, published by the Great Western Railway Company, London, 1927
  3. ^ Mike Oakley (October 2004). Wiltshire Railway Stations (2004 ed.). Dovecote Press, Wimborne. pp. 51–53. ISBN 1-904349-33-1.
  4. ^ E T MacDermot, History of the Great Western Railway, volume II, published by the Great Western Railway Company, London, 1931
  5. ^ a b c Mike Oakley (October 2004). Wiltshire Railway Stations (2004 ed.). Dovecote Press, Wimborne. pp. 88–90. ISBN 1-904349-33-1.
  6. ^ a b c Mike Oakley (October 2004). Wiltshire Railway Stations (2004 ed.). Dovecote Press, Wimborne. pp. 90–92. ISBN 1-904349-33-1.
  7. ^ a b c Mike Oakley (October 2004). Wiltshire Railway Stations (2004 ed.). Dovecote Press, Wimborne. pp. 86–88. ISBN 1-904349-33-1.
  8. ^ Bradshaw's April 1910 Railway Guide (1968 reprint ed.). David and Charles. 1968. pp. 32, 37 and 116. ISBN 0-7153-4246-0.

51°24′58″N 1°43′21″W / 51.4162°N 1.7224°W / 51.4162; -1.7224