Longmiandadao station (simplified Chinese: 龙眠大道站; traditional Chinese: 龍眠大道站; pinyin: Lóngmiándàdào Zhàn), is a station of Line 1 of the Nanjing Metro. It began operations on 28 May 2010,[1][2] as part of the southern extension of line 1 from Andemen to CPU.
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | East Tianyuan Road (G104) Jiangning District, Nanjing, Jiangsu China | ||||||||||
Operated by | Nanjing Metro Co. Ltd. | ||||||||||
Line(s) | Line 1 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 104 | ||||||||||
History | |||||||||||
Opened | 28 May 2010 | ||||||||||
Services | |||||||||||
|
References
edit- ^ 大事记. Nanjing Metro. Retrieved 2018-07-24.
5月28日 南京地铁二号线及一号线南延线建成通车,运营里程跃居全国第四,初现网络化运营格局
- ^ 南京地铁二号线载人模拟运营 [Nanjing Metro Line 2 Undergoes Trial Runs]. Sina News (in Chinese). Yantse Evening News. May 23, 2010. Archived from the original on March 3, 2016. Retrieved December 20, 2016.