Line 2 (São Paulo Metro)

Line 2 (Green) (Portuguese: Linha 2–Verde) is one of the six lines that make up the São Paulo Metro, and one of the thirteen lines that make up the Metropolitan Rail Transportation Network. It currently runs between the Vila Madalena and Vila Prudente stations. The line is also called, and was originally known as, the Paulista Line, because it goes along much of the Avenida Paulista, one of the leading financial centers in São Paulo.[citation needed] Despite being the second line to be planned, it was the third to be built[citation needed]—the second line built was actually Line 3 (Red). This line connects the West and South-East regions.

São Paulo Metro Line 2 (Green)
São Paulo Metro logo
Overview
StatusOperational
OwnerGovernment of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
  • Current:
  • Future:
  • Planned:
Stations14 in operation
8 in construction
6 in project
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) CMSP
Depot(s)Tamanduateí rail yard
Rapadura train park (under construction)
Penha train park (under construction)
Paulo Freire rail yard (planned)
Rolling stock
Daily ridership431,000/business day[2]
History
Commenced1987
OpenedJanuary 25, 1991
Last extensionAugust 21, 2010
Technical
Line length14.7 km (9.1 mi)
Track gauge1,600 mm (5 ft 3 in)[3]
Electrification750 V DC third rail
Operating speed87 km/h (54 mph)
SignallingAlstom Urbalis CBTC
Route map

 20 
Cerro Corá
 20 
Up arrow
Planned
Vila Madalena train park
Vila Madalena
Santuário Nossa Senhora
de Fátima–Sumaré
Clínicas train park
Clínicas
Consolação
Trianon–Masp
Brigadeiro
Paraíso
Ana Rosa
Chácara Klabin
Ipiranga Brook
Av. Dr. Ricardo Jafet
Santos–Imigrantes
Alto do Ipiranga
Sacomã
Expresso Tiradentes
Tamanduateí rail yard
Tamanduateí
Tamanduateí River
Av. Dr. Francisco Mesquita
Vila Prudente
Expresso Tiradentes
Down arrow
Under construction
Orfanato train park
Orfanato
Santa Clara
Anália Franco
Vila Formosa
Rapadura train park
Santa Isabel
Guilherme Giorgi
Aricanduva
Penha–Lojas Besni
Penha train park
Down arrow
In expropriation
Penha de França
Gabriela Mistral
Fernão Dias
Paulo Freire rail yard
Ponte Grande
 19  to Anhangabaú
Dutra
 19 
 19  to Bosque Maia
Inside view of an Alstom type G train.

History

edit
 
Platform of Santuário Nossa Senhora de Fátima-Sumaré Station

The first section of Line 2 (Green Line), initially called the Paulista Line, was built using the New Austrian Tunnelling Method.[4] The line opened on January 25, 1991, having at that time a length of 2.9 kilometres (1.8 mi) and four stations. With this line, the metro system was extended to include a major axis of the expanded center of São Paulo, with a large concentration of financial institutions, hospitals, schools, hotels, consulates, offices of state radio and television, theaters, and museums. The following year, the Ana Rosa and Clínicas stations were opened, increasing the line's length to 4.7 kilometres (2.9 mi). In 1998, two new stations (Vila Madalena and Santuário Nossa Senhora de Fátima-Sumaré) were completed, adding a further 2.3-kilometre (1.4 mi) stretch.

On March 30, 2006, the then-Governor Geraldo Alckmin on his last day in office opened the Santos-Imigrantes station.[citation needed] Shortly after, on May 9, 2006, the Chácara Klabin station was formally opened by the subsequent Governor Claudio Lembo,[citation needed] thus completing the 2.9-kilometre (1.8 mi) stretch between Ana Rosa and Santos-Imigrantes, making the line a total of 9.9 kilometres (6.2 mi) long.

 
Brigadeiro Station platform

On June 30, 2007, the Governor José Serra opened the Alto do Ipiranga station, located at the junction of Avenida Dr. Gentil de Moura and Rua Visconde de Piraja, bringing the metro network in São Paulo to a total length of 61 kilometres (37.9 mi), with a forecast of passenger demand on Line 2 of 370,000 people per day. Jose Serra published a decree and authorization to extend the line to Vila Prudente, adding the Sacomã, Tamanduateí and Vila Prudente stations.[citation needed]

On May 10, 2007, during the Papal visit of Benedict XVI to the city of São Paulo, Line 2 had the highest demand of its history up until then, carrying 370,226 passengers.[citation needed] During the weekend of May 17–18, 2008, Line 2 was temporarily shut down between the stations Clínicas and Consolação to allow the use of a tunnel boring machine just seven meters (23 ft 0 in) below the level of its tunnel being used for the extension project of Line 4 (Yellow).[citation needed] The current record of passengers carried by the line was on May 7, 2008, with 428,056 passengers.

On March 28, 2009, the first of the sixteen new trains came into operation for the inauguration of the Sacomã - Vila Prudente stretch. On January 10, 2010, Sacomã station was opened to the public, initially only in operation from 10:30 to 15:00 and then from the 22nd, from 10:00 to 16:00. Finally, on the 30th of that month, it was fully opened to the public. Although the extension project of Line 2 was the only one to receive the whole amount in 2009, the schedule was delayed—the opening of the Tamanduateí and Vila Prudente stations originally scheduled for March 2010 was postponed.[5] On August 18 it was announced that the opening of Vila Prudente station would happen just three days later. On September 21, the Tamanduateí station opened.

Stations

edit
 
Sacomã Station is one of the most modern metro stations in Latin America.

The Santos-Imigrantes station is semi-elevated with metal and concrete structures that support the roof of the station. The Santuário Nossa Senhora de Fátima-Sumaré station is elevated and situated in a valley (under the Dr. Arnold viaduct). The Tamanduateí station is elevated with concrete structures mixed with metal, supporting the arched ceiling. All other stations are underground. The Trianon-Masp, Consolação, Brigadeiro, Ana Rosa, Chácara Klabin, and Santos-Imigrantes stations are composed of island platforms. The other station use the more common side platforms.

The line also integrates with Line 15 (Silver) and the extension of Line 5 (Lilac).

Code Station Platforms Position Connections District
COA Cerro Corá Side platforms Underground    20  (Planned) Between Pinheiros and Lapa
VMD Vila Madalena Side platforms Underground   Vila Madalena Bus Terminal Between Pinheiros and Perdizes
SUM Santuário Nossa Senhora de Fátima-Sumaré Side platforms Elevated - Between Perdizes and Jardim Paulista
CLI Clínicas Side platforms Underground - Between Consolação and Jardim Paulista
CNS Consolação Island platforms Underground    
  Campo Limpo–Rebouças–Centro Bus Corridor
Between Consolação and Jardim Paulista
TRI Trianon-Masp Island platforms Underground - Between Bela Vista and Jardim Paulista
BGD Brigadeiro Island platforms Underground - Between Bela Vista and Vila Mariana
PSO Paraíso Split platforms Underground     Vila Mariana
ANR Ana Rosa Island platforms Underground      16  (Planned)
  Ana Rosa Bus Terminal
Vila Mariana
CKB Chácara Klabin Island platforms Underground     Vila Mariana
IMG Santos-Imigrantes Island platforms Elevated - Cursino
AIP Alto do Ipiranga Side platforms Underground - Ipiranga
SAC Sacomã Side platforms Underground     Sacomã Bus Terminal
    Expresso Tiradentes
  BRT ABC (Future)
Ipiranga
TTI Tamanduateí Side platforms Elevated    
  BRT ABC (Future)
Between Ipiranga and Vila Prudente
VPT Vila Prudente Side platforms Underground    
  Vila Prudente Bus Terminal
    Expresso Tiradentes
Vila Prudente
OFT Orfanato Side platforms Underground - Vila Prudente
TBA Santa Clara Side platforms Underground   Santa Clara Bus Terminal (Future) Água Rasa
ANF Anália Franco Side platforms Underground    16  (Planned) Água Rasa
VFO Vila Formosa Side platforms Underground   Vila Formosa Bus Terminal (Future) Vila Formosa
TBA Santa Isabel Side platforms Underground - Carrão
GUI Guilherme Giorgi Side platforms Underground - Carrão
ARI Aricanduva Side platforms Underground - Vila Matilde
PEN Penha–Lojas Besni Side platforms Underground    
    (Future)
    North Penha Bus Terminal
  South Penha Bus Terminal
Penha
PEF Penha de França Side platforms Underground - Penha
TIC Gabriela Mistral Side platforms Underground   Tiquatira Bus Terminal (Planned)
  Guarulhos–São Paulo Metropolitan Corridor (Planned)
      (Planned)
Cangaíba
TBA Fernão Dias Side platforms Underground - Cangaíba
PGD Ponte Grande Side platforms Underground - Ponte Grande (Guarulhos)
DUT Dutra Side platforms Underground    19  (Planned)
    Dutra Bus Terminal (Planned)
Vila Augusta (Guarulhos)
  • Note: Stations in bold are under construction; stations in italic are in planning.

Expansion plans

edit

Vila Prudente ↔ Cidade Tiradentes

edit

In May 2009 a joint delegation of the city and the state of São Paulo visited the monorail system in Tokyo to begin planning the implementation of a monorail to extend Line 2 (Green) from Vila Prudente to Cidade Tiradentes.[6] On November 6, 2009, international bidding was opened in order to build the monorail system. On November 23, 2009, construction on the Vila Prudente-Oratório was started. The system will be 23.8 kilometres (14.8 mi) long between Vila Prudente and Cidade Tiradentes and will have 17 stations (Vila Prudente, Oratório, São Lucas, Vila Tolstoi, Vila União, Jardim Planalto, Sapopemba, Fazenda da Juta, São Mateus, Jardim Colonial, Iguatemi, Jaquiriça, Bento Guelf, Érico Semer, Márcio Beck, and Cidade Tiradentes) and 54 trains, each capable of carrying 1000 passengers. The line is projected to carry around 510,000 passengers daily.[7]

However, it was decided in September 2012, that the eastward extension monorail to Cidade Tiradentes will be named Line 15, and Line 2 will be extended northwards from Vila Prudente to Dutra. The extension will be 13.3 km (8.3 mi) long and have 13 stations. Funds were approved in mid-2012 for the first section (4.6 km or 2.9 mi), which includes the Orfanato, Santa Clara, Anália Franco and Vila Formosa stations. This section is expected to open in 2017 or 2018.[needs update]

Vila Madalena ↔ Cerro Corá

edit

In addition, there are plans to expand Line 2 (Green) 2.9 kilometres (1.8 mi) from Vila Madalena station to Avenida Cerro Corá, in the neighborhood of Lapa.[8]

References

edit
  1. ^ Meier, Ricardo (17 April 2023). "Novo trem do Metrô, futura Frota R irá operar sem condutor na Linha 2-Verde". Metrô CPTM (in Brazilian Portuguese). Retrieved 17 April 2023.
  2. ^ "Entrada de Passageiros por Linha - 2022" (PDF) (in Portuguese). 2022-07-20. Retrieved 2022-08-01.
  3. ^ Ferreira, Robert; Tharcisiu Alves. (January 2012). "São Paulo Metro". www.nycsubway.org. Archived from the original on 2014-02-02. Retrieved 2014-02-02. On Lines 1, 2 and 3, the track gauge is a non standard 1600 mm, the third rail is 750 V DC and under running. For Lines 4 and 5, the track gauge is 1435 mm and they use overhead pantograph, precluding any connection to the rest of the system, plus the 4 and 5 lines can't connect because the trains on the 4 line use drive-less technology while trains on 5 line are OPTO. Lines 7, 8, 9, 10, 11 and 12 (operated by CPTM) are all 1600mm and use overhead pantograph.
  4. ^ Uchôa, Marco (April 7, 1992). "Túnel passará pela torre da 'Cultura'". O Estado de S. Paulo (in Portuguese). São Paulo. pp. Cidades, pg. 2.
  5. ^ Grandin, Felipe (2010-04-26). "Governo de SP deixou de investir R$ 1,3 bi no Metrô". Jornal da Tarde (in Portuguese). No. 14490. São Paulo. pp. 3A. ISSN 1516-294X. Archived from the original on 2011-07-06. Retrieved 2010-05-01.
  6. ^ Mayor of São Paulo visits monorail system in Tokyo. (in Portuguese) Archived 2012-06-30 at archive.today
  7. ^ Construction begins on the monorail between Vila Prudente and Cidade Tiradentes (in Portuguese)
  8. ^ Companhia do Metropolitano de São Paulo - METRÔ (2006). "Rede Essencial".