The Kuril Flyover is the third largest flyover in Bangladesh. Its foundation stone was laid on 2 May 2010.[1][2][3] Finally the work started in March 2011.[4]
Kuril Flyover | |
---|---|
Coordinates | 23°49′20″N 90°25′14″E / 23.8223°N 90.4206°E |
Locale | Dhaka |
Characteristics | |
Total length | 3.1 km |
History | |
Constructed by | Project Builders Limited, China Major Bridge Engineering Corporation |
Construction start | 2 May 2010 |
Construction end | 4 August 2013 |
Construction cost | 3.06 billion taka[1] |
Location | |
The flyover was opened on 4 August 2013.[1]
References
edit- ^ a b c "PM opens Kuril Flyover". bdnews24.com. Retrieved 10 December 2020.
- ^ "PM inaugurates Kuril flyover". The Daily Star. Retrieved 10 December 2020.
- ^ "PM to open Kuril Flyover on Sunday". Dhaka Tribune. Retrieved 10 December 2020.
- ^ "Kuril flyover open for public". Risingbd.com. Retrieved 10 December 2020.