This article needs additional citations for verification. (March 2021) |
The Huaibei–Suzhou–Bengbu intercity railway is a high-speed railway line currently under construction in China. It will be 162.2 kilometres (100.8 mi) long and have a maximum speed of 350 kilometres per hour (220 mph).[1]
Huaibei–Suzhou–Bengbu intercity railway | |
---|---|
Overview | |
Native name | 淮宿蚌城际铁路 |
Status | Under construction |
Termini | |
Stations | 6 |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 162.2 km (101 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
History
editThe feasibility study for the line was approved on 4 November 2020.[1] Construction officially began in December 2020.[2]
Route
editThe line takes a similar but less direct route than the existing Beijing–Shangqiu high-speed railway. It will have the following stations:
References
edit- ^ a b "The era of Guzhen high-speed rail is coming" [固镇高铁时代来了]. guzhen.gov.cn (in Chinese). 11 November 2020. Retrieved 23 March 2021.
- ^ "安徽6个重点铁路项目集中开工" [Six key railway projects in Anhui have been started]. 网易 (in Chinese). 31 December 2020. Retrieved 23 March 2021.