Urja Ganga gas pipeline project was launched by Prime Minister Narendra Modi in his constituency Varanasi, Uttar Pradesh. Also referred to as the Jagdishpur-Haldia Bokaro-Dhamra Natural Gas Pipeline (JHBDPL) project, the project is of an estimated length of 2540 km which is under construction from the states of Uttar Pradesh to Odisha. [1]
Urja Ganga Gas Pipeline Project | |
---|---|
Country | India |
Prime Minister(s) | Narendra Modi |
Launched | 24 October 2016 |
Status | Active |
The project includes the North East Gas Grid being coordinated by Indradhanush Gas Grid Limited (IGGL).[2]
Objectives
editThe scheme is directed to provide piped cooking gas to the households of Varanasi within next two years and to millions others in neighbour states after one more year.[3] The government also plans to create 25 industrial clusters in these states which can utilise the gas as fuel and generate employment in these areas.[4]
Estimation
editThe allocated budget for laying the 1,500 km covered long cooking gas pipelines is about ₹51,000-crore along with gas stations at various areas. The length of pipeline will be extended to 2540-km in second stage of the project.[5]
Target
editThe project is committed to provide the household members health safety by providing clean fuel with the piped gas to the locals of Varanasi and later to Bihar, Jharkhand, West Bengal and Odisha. The seven main station cities include Varanasi, Patna, Bokaro, Jamshedpur, Kolkata, Ranchi, Bhubaneswar and Cuttack as the major beneficiaries of the project.
A lot of population lives in these states where cooking gas is scarcely available in the remote areas. An estimation to serve 50,000 households is planned to get PNG and almost 20,000 vehicles will be able to get CNG gas per year. It encompasses 40 districts and 2600 villages which will get the direct benefit. The project is estimated to get complete in 2020, after which people can get gas supply at their houses itself. It can also give lot of benefits to help renewal of a number of declining fertiliser industrialised units and other sectors like Power and Automotive. In this scheme not only households but about half a million vehicles may switch over to CNG mode so that the problem of fuel in the country could be resolved. Prime minister Modi also laid a foundation stone for the 120 km long Varanasi-Allahabad railway line that will cost approximate ₹750.66 crore and provide speedy transit for cylinder and worker movements.
Length wise distribution
editThe state of UP gets the gas line of length 338 km. Bihar state will get about 441 km long line. Jharkhand, a state in east India, gets 500 KM long and another state in eastern India, West Bengal, will have the pipe line of length 542 km and Odisha gets benefited by 718 km pipeline as per the specifications of project details issued in public.
Barauni–Guwahati pipeline
editBarauni–Guwahati pipeline | |
---|---|
Location | |
From | Barauni Refinery, Barauni |
Passes through |
|
To | Guwahati, Assam |
General information | |
Type | Natural gas |
Status | Under construction |
Operator | GAIL |
Expected | 2021 - 2023 |
Technical information | |
Length | 729 km (453 mi) |
Maximum discharge | 15 million metric standard cubic meters per day |
Diameter | 24 in (610 mm) |
The Barauni–Guwahati natural gas pipeline is a proposed GAIL feeder line approximately 729 km (453 mi) long between Bihar and Assam through Siliguri.[6][7] A number of spur lines have been proposed as well.[8] This line will be fed through Jagdishpur–Haldia lines.[9][8] It will be connected to the under construction North East Gas Grid being coordinated by the Indradhanush Gas Grid Limited.[10] This is part of the expanded Urja Ganga Gas Pipeline Project.[10][11][12] The government's vision for expanding hydrocarbon connectivity was clarified in 2016.[13]
References
edit- ^ Kapur, Manavi (25 July 2015). "What makes the Give It Up campaign click". Business Standard India. Retrieved 27 November 2016.
- ^ Singh, Bikash (8 January 2020). "Govt to provide Rs 5,559 crore funding to Northeast gas grid". The Economic Times. Retrieved 22 January 2022.
- ^ "PM Modi launches 'Urja Ganga' gas pipeline project". Business Standard India. Retrieved 27 November 2016.
- ^ "PM Modi launches 'Urja Ganga' gas pipeline project". Retrieved 27 November 2016.
- ^ "PM Narendra Modi inaugurates Rs 51,000 crore Urja Ganga gas pipeline in Varanasi". huntnews.in. Retrieved 27 November 2016.
- ^ "GAIL contracts ₹1,100-cr worth pipes for Barauni-Guwahati gas pipeline". The Hindu BusinessLine. 8 November 2018. Retrieved 22 January 2022.
- ^ "Baruni-Guwahati Gas Pipeline project to be completed by Next Year". Northeast Today. 13 October 2020. Retrieved 22 January 2022.
- ^ a b Choudhary, Sanjeev (7 June 2017). "Assam Gas submits EoI for Barauni-Guwahati pipeline". The Economic Times. Retrieved 22 January 2022.
- ^ "Barauni–Bongaigaon–Guwahati, India". Offshore Technology. 1 November 2021. Retrieved 22 January 2022.
Carmen is a robot, or rather an algorithmic journalist, who creates valuable automated content for our audiences.
- ^ a b "Barauni-Ghy Pipeline Project to Complete by April 2021". Pratidin Time. 13 October 2020. Retrieved 22 January 2022.
- ^ Singh, Bikash (13 November 2021). "Guwahati to get piped gas supply by December 2022". The Economic Times. Retrieved 22 January 2022.
- ^ IANS (16 August 2018). "GAIL awards contract for 108 km of Barauni-Guwahati gas pipeline". Business Standard India. Retrieved 22 January 2022.
- ^ "Petroleum Minister releases Hydrocarbon Vision 2030 for North-East". Press Information Bureau, Government of India. 9 February 2016. Retrieved 22 January 2022.