Telangana II Solar Power Plant

The solar park Telangana II is at Palwai village near Gadwal in the Mahbubnagar district of Telangana. It is a 12 megawatt (MWDC) photovoltaic power station, commissioned in June 2016. It is in direct neighbourhood to its sister project Telangana I. Telangana II was constructed using 38,430 solar modules. The plant covers an area of 40 acres (16 hectares) and supplies about 18,000 people with energy.[1] The estimated reduction of CO2 is more than 8,000 metric tons per year.

Telangana II
Map
CountryIndia
LocationGadwal, Mahbubnagar district, Telangana
Coordinates16°9′10″N 77°45′56″E / 16.15278°N 77.76556°E / 16.15278; 77.76556
StatusOperational
Commission date1 June 2016; 8 years ago (2016-06-01)
OwnerTalettutayi Solar Projects Private Limited
Solar farm
Type
Collectors38,430
Total collector area40 acres
Power generation
Nameplate capacity12 MWDC
Map of Telangana with mark showing location of Power Plant
Map of Telangana with mark showing location of Power Plant
Telangana II
Location of Power Plant Telangana II in the State of Telangana

Owner of the power plant is Solar Arise India Projects Limited, which the shareholders are Thomas Lloyd Group, the European Initiative on Clean, Renewable Energy, Energy Efficiency and Climate Change related to Development SICAV SIF in relation to Global Energy Efficiency and Renewable Energy Fund (“GEEREF”), advised by the European Investment Bank Group, Kotak Mahindra managed Core Infrastructure India Fund (“CIIF”) and the founding management team Anil Nayar, James Abraham and Tanya Singhal.[2][3] Solar Arise currently owns and operates 130 MW of grid-connected solar power projects in India. The park is operated by Talettutayi Solar Projects Six Private Limited.

The state of telangana has started its “Telangana Solar Power Policy” in 2015 to create "an enabling environment for prospective solar power developers".[4] The government of India has a target of developing 22,000 megawatts (7.507×1010 British thermal units per hour) of solar power plants and an additional 8,000 megawatts (2.730×1010 British thermal units per hour) is expected in local generation, bringing the total to 30,000 megawatts (1.0236×1011 British thermal units per hour) by 2022, which was later increased to 100,000 megawatts by the Narendra Modi government in the 2015 Union budget of India.[5]

References

edit
  1. ^ "Telangana II".
  2. ^ ThomasLloyd takes stake in SolarArise Foreign Investors on India, issue of 2018, october, 10. Retrieved 2019-02-03.
  3. ^ Business: Kotak Mahindra, EIB to Invest in India’s SolarArise, Bloomberg, issue of 2014, october, 9. Retrieved 2019-03-18.
  4. ^ "Telangana announces new solar power policy". www.downtoearth.org.in.
  5. ^ "Revision of cumulative targets under National Solar Mission from 20,000 MW by 2021–22 to 1,00,000 MW". pib.nic.in. Retrieved 27 March 2017.
edit