Talk:Mississippi River Trail

Latest comment: 1 year ago by ACAeditor in topic Updates required
edit

Hello fellow Wikipedians,

I have just modified one external link on Mississippi River Trail. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 13:54, 2 February 2018 (UTC)Reply

A Commons file used on this page or its Wikidata item has been nominated for deletion

edit

The following Wikimedia Commons file used on this page or its Wikidata item has been nominated for deletion:

Participate in the deletion discussion at the nomination page. —Community Tech bot (talk) 20:42, 5 September 2020 (UTC)Reply

A Commons file used on this page or its Wikidata item has been nominated for deletion

edit

The following Wikimedia Commons file used on this page or its Wikidata item has been nominated for deletion:

Participate in the deletion discussion at the nomination page. —Community Tech bot (talk) 05:06, 28 April 2021 (UTC)Reply

Eastern route in TN and MS.

edit

I recently discovered a map from the Memphis Convention & Visitors Bureau depicting the map going south through MLK Park, T. O. Fuller State Park, and down Horn Lake Rd. How does this fit into the larger network? ElToAn123 (talk) 15:29, 19 March 2022 (UTC)Reply

Updates required

edit

The USBR 45 link from the US Bicycle Route page directs to the Mississippi River Trail but these are not the same.  The Designation and signage text states that USBR designation requires signage.  This is false.  MRT as an organization is no longer active and therefore the MRT will not be maintained, upgraded except as local jurisdictions choose to do so.  Add link to Adventure Cycling USBRS maps: https://www.adventurecycling.org/usbrsmaps

I am the Adventure Cycling Association US Bicycle Route System Volunteer Coordinator. I am a volunteer with Adventure Cycling, have been working as a volunteer on the USBRS since 2004, and am not paid in any way by them or anyone else associated with the USBRS. I am a retiree and receive no income from any source other than pension, Social Security, and investments. I say this because I have been informed that I have a conflict of interest and therefore am not permitted to edit any pages associated with the USBRS. This despite the fact that I am actively involved with AASHTO, see all the USBR applications submitted by the DOTs, work directly with the DOTs in developing USBRS and in preparing their applications to AASHTO for USBR designation, and possess the historical documents associated with the USBRS and benefit in no way from providing this information to Wikipedia. ACAeditor (talk) 23:16, 16 May 2023 (UTC)Reply