Talk:Calvert railway station
This article is rated Stub-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||||||||||||||
|
External links modified
editHello fellow Wikipedians,
I have just modified one external link on Calvert railway station. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
- Added archive https://web.archive.org/web/20071008215639/http://www.southeast-ra.gov.uk/southeastplan/key/study_areas/draft_strategies/mkav/aylesbury_vale-draft_strategy.pdf to http://www.southeast-ra.gov.uk/southeastplan/key/study_areas/draft_strategies/mkav/aylesbury_vale-draft_strategy.pdf
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}}
(last update: 5 June 2024).
- If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
- If you found an error with any archives or the URLs themselves, you can fix them with this tool.
Cheers.—InternetArchiveBot (Report bug) 13:00, 29 July 2017 (UTC)
Re-opening
edithttps://www.nic.org.uk/wp-content/uploads/5thStudio-FinalReport.pdf doesn't say anything about this station. The text on p94 discusses a proposed new city in this area around Calvert. On p93 the station symbol is at Steeple Claydon where the is passive provision (i.e. a gap) being left such that building a station there on EWR remains open option in the future. --FDent (talk) 19:27, 30 January 2018 (UTC)
- Note on the passive provision here: http://www.eastwestrail.org.uk/wp-content/uploads/2015/04/information_sheet_steeple_claydon_station_proposal_october_2014.pdf --FDent (talk) 20:15, 31 January 2018 (UTC)
- The cited Aylesbury Vale Draft Strategy doesn't mention Calvert railway station. Some mix-up with the then proposed Aylesbury Park is likely here.--FDent (talk) 19:57, 2 February 2018 (UTC)
- Note on the passive provision here: http://www.eastwestrail.org.uk/wp-content/uploads/2015/04/information_sheet_steeple_claydon_station_proposal_october_2014.pdf --FDent (talk) 20:15, 31 January 2018 (UTC)
First freight for HS2 engineering work arrives
editI don't know enough about the engineering to write this up, let alone whether or not it is important, still less where to put it. But someone else may?
- "First freight train arrives at HS2’s main construction compound"[1]
Have fun! (Acknowledgements to Google Alerts, which decided I might want to know, because it has the magic words "East West Rail" in it.) --John Maynard Friedman (talk) 00:26, 23 December 2020 (UTC)
References
- ^ ""First freight train arrives at HS2's main construction compound". Dry Bulk. 21 December 2020.