Shoreline Trail Buffalo, NY

The Shoreline Trail is a paved path within Niagara and Erie County welcoming cyclists or walkers and is dog friendly. The trail begins in Buffalo Harbor State Park and stretches North including a variety of cities and views of multiple bodies of water. Parking for the Shoreline Trail is provided in multiple spots along the path.[1]

Sections

edit

West River Section

edit

This portion of the trail resides entirely in Grand Island and connects Buckhorn State Park to Big Six Marina to a preexisting trail in Beaver Island State Park. The trail has a seasonal restroom located at Big Six Marina and has four portable toilets located in various spots along the trail. Three paddle craft launches are located along the trail as well. Numerous duck blinds are along the trail.[2]

Riverwalk Section

edit

The Riverwalk Section of the Shoreline Trail stretches from North Tonawanda to Buffalo. This portion of the trail boasts water front views of the Erie Canal, Niagara River and Lake Erie. The trail connects several parks including Niawanda Park and Aqua Lane Park in the City of Tonawanda and Black Rock Canal Park, Towpath Park, Riverside Park, Front Park and Lasalle Park in Buffalo.[3]

Industrial Heritage Section

edit

This section stretches through Buffalo along Lake Erie and allows trail visitors to view nature. Located along this section of trail is Times Beach Nature Preserve and Tifft Nature Preserve.[3]

The Sunset View Section

edit

This section of the Shoreline Trail consists of several phases including the Bethlehem phase, Woodlawn phase and the Hamburg section. The Bethlehem phase in Buffalo and the City of Lackawanna connects trail users further south along the water. The Shoreline Trail in this area allows residents to enjoy the area around the previous Bethlehem Steel site.The Woodlawn phase is proposed to connect the Bethlehem phase of the trail to Blasdell including Woodlawn Beach State Park. The final stretch of the sunset view section is the Hamburg Section which is proposed to include Hamburg Town Park.[3]

The Beaches Section

edit

The Beaches section of the Shoreline Trail is made up of several phases some of which are yet to be completed with the intent to connect multiple beaches throughout the Town of Evans and the Town of Brant. Phase 1 which was completed in 2014 consisted of 1.5 miles of an eight foot wide path. The first portion of the trail stretches from Wendt Beach County Park to Bennet Beach Park. Phase 2 is just under 1.5 miles long and begins in Bennet Beach Park and travels south to Evans Town Park. Phase 2 is under construction but yet to be completed. Phase 3 is separated into Phase 3A and Phase 3B. Phase 3A includes 1.3 miles from Roat Drive to Sturgeon Point Road. Phase 3A is under construction. Phase 3B is proposed to be approximately 4 miles long beginning where Phase 3A ends, Sturgeon Point Road north to Eighteen Mile Creek. Phase 4 is proposed to be made up of over a mile and half of path from Evans Town Park to Lake Erie Beach. Proposed Phase 5 is just over a mile long beginning in Lake Erie Beach and ending in Evangola State Park. Upon completion of all five phases the Shoreline Trail would stretch over 10 miles.[3]

Funding

edit

A combination of government funding and grants that have been allocated to the Shoreline Trail project funded construction throughout the years. In September, 2018 the Natural Heritage Trust administered $1.6 million to complete the Riverwalk Section of the trail.[4] Erie County received $315,000 from the Greenway Fund Standing Committee in March, 2021.[5] Phase 1 of the Beaches Section was paid for with county, state and federal money. However, Phase 2 of the Beaches Section of the trail was funded via only county and federal money.[3]

References

edit
  1. ^ "Shoreline Trail - City of Buffalo | Empire State Trail". empiretrail.ny.gov. Retrieved 2021-07-16.
  2. ^ "West River Shoreline Trail Landscape Management Plan" (PDF).
  3. ^ a b c d e "Shoreline Trail | Environment & Planning". www2.erie.gov. Retrieved 2021-07-15.
  4. ^ "New York state's trailway project to be extended with grant from Wilson Foundation". bizjournals.com. Retrieved 2021-08-03.
  5. ^ oadmin (2021-03-19). "Greenway Fund Standing Committee awards combined $2 million to 6 worthy "waterfront" groups | News | Buffalo Olmsted Parks Conservancy". Buffalo Olmsted Parks. Retrieved 2021-08-03.