Sanyang Road Station (simplified Chinese: 三阳路; traditional Chinese: 三陽路; pinyin: sān yáng lù) serves as an interchange station of Line 1 and Line 7 of Wuhan Metro. The elevated station entered revenue service along with the completion of Line 1, Phase 1 on July 28, 2004, and the underground station entered service on October 1, 2018 with the opening of Line 7.[2]
Sanyang Road 三阳路 | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||
Location | Jiang'an District, Wuhan, Hubei China | |||||||||||||||
Coordinates | 30°35′52″N 114°18′06″E / 30.597785°N 114.301629°E | |||||||||||||||
Operated by | Wuhan Metro Co., Ltd | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (4 side platforms) | |||||||||||||||
History | ||||||||||||||||
Opened | July 28, 2004 | |||||||||||||||
Services | ||||||||||||||||
|
Station layout
edit3F | Side platform, doors open on the right | |
Westbound | ← Line 1 towards Jinghe (Dazhi Road) | |
Eastbound | Line 1 towards Hankou North (Huangpu Road) → | |
Side platform, doors open on the right | ||
2F | Concourse | Faregates, Station Agent |
G | Entrances and Exits | Exits A-H, J-L |
B1 | Concourse | Faregates, Station Agent |
B2 | Side platform, doors open on the right | |
Northbound | ← Line 7 towards Garden Expo North (Xianggang Road) | |
Southbound | Line 7 towards Qinglongshan Ditiexiaozhen (Xujiapeng) → | |
Side platform, doors open on the right | ||
B3 | Transfer Passage |
Facilities
editSanyang Road Station for Line 1 is a two-story elevated station placed along Jinghan Avenue. The station has two side platforms accommodating a pair of tracks, and is equipped with attended customer service concierges, automatic ticket vending machines, and accessible ramps. The underground Line 7 station has a two side platforms and is connected to the elevated portion with two pairs of escalators, and a connecting bridge over the Sanyang Road intersection on both sides of the Jinghan Avenue.
Exits
editThere are sixteen exits in service:
- Exit A: Northwestern side of Jinghan Avenue.
- Exit B: Southeastern side of Jinghan Avenue.
- Exit C1
- Exit C2
- Exit D
- Exit E
- Exit F
- Exit G
- Exit H
- Exit J
- Exit K1
- Exit K2
- Exit L1
- Exit L2
- Exit L3
- Exit L4
Transfers
editBus transfers to Route 502, 534, 559, 581, 598, 608, 622, 711 and 801 are available at Sanyang Road Station.[3]
References
edit- ^ "武汉地铁7号线一期年内开建 预计2017年建成". 荆楚报. September 3, 2013. Retrieved 18 December 2013.
- ^ "武汉轻轨开通9周年 客流量为开通初期近10倍". 武汉交通运输委员会. Archived from the original on 19 December 2013. Retrieved 18 December 2013.
- ^ "武汉公交查询". Retrieved 18 December 2013.