Pittsburg Center station

Pittsburg Center station is a Bay Area Rapid Transit station on the Yellow Line.[4] It is located at the Railroad Avenue overpass of Highway 4 in Pittsburg, California and serves the downtown area of about one mile (1.6 km) away via connecting buses provided by Tri Delta Transit. There is no reserved parking available at this station.[2]

Pittsburg Center
Bay Area Rapid Transit
A railcar at a railway station in the center of a highway
Westbound train at Pittsburg Center in May 2018
General information
Location2099 Railroad Avenue
Pittsburg, California
Coordinates38°01′06″N 121°53′25″W / 38.018227°N 121.890178°W / 38.018227; -121.890178
Owned bySan Francisco Bay Area Rapid Transit District
Line(s)BART E-Line (eBART)
Platforms1 island platform
Tracks2
ConnectionsBus transport Tri Delta Transit: 380, 381, 391[1]
Construction
Structure typeTrench cut
Parking262 spaces[2]
Bicycle facilitiesYes
AccessibleYes
Other information
Station codeBART: PCTR
History
OpenedMay 26, 2018 (2018-05-26)
Passengers
2024490 (weekday average)[3]
Services
Preceding station Bay Area Rapid Transit Following station
Pittsburg/​Bay Point Yellow Line (eBART) Antioch
Terminus
Location
Map

History

edit
 
The station under construction in 2016

Construction of the station was uncertain at the time of eBART's approval due to lack of available funds.[5] The station was originally known as Railroad Avenue during planning.[6] The city later chose Pittsburg Civic Center, which BART rejected because of its similarity to Civic Center/UN Plaza station. In January 2015, the city accepted BART's proposal of Pittsburg Center.[7]

Funding for the station was secured in early 2015 and was estimated at $11.9 million (equivalent to $16 million in 2023). Construction commenced on July 27, 2015,[8] and was opened with the rest of the line on May 26, 2018.[5]

As of June 2024, Pittsburg Center was the least-used station on the BART system, with 490 daily boardings.[3] As of 2024, BART indicates "significant market, local support, and/or implementation barriers" that must be overcome to allow transit-oriented development on the surface parking lots at the station. Such development would not begin until at least the mid-2030s.[9]

References

edit
  1. ^ "System Map". Tri Delta Transit. 2022. Retrieved January 5, 2023.
  2. ^ a b Coetsee, Rowena (January 5, 2018). "Signups for reserved eBART parking in Antioch start Jan. 16". East Bay Times. Retrieved January 7, 2018.
  3. ^ a b "Monthly Ridership Reports". San Francisco Bay Area Rapid Transit District. June 2024.
  4. ^ "East Contra Costa BART Extension (eBART)". BART. 2010. Retrieved April 2, 2013.
  5. ^ a b Gartrell, Nate (January 22, 2015). "Pittsburg secures last piece of funding for eBART, expect new station in 2018". Contra Costa Times. Digital First Media. Retrieved April 21, 2016.
  6. ^ PBS&J (September 2008). East Contra Costa BART Extension (eBART) Draft Environmental Impact Report. San Francisco Bay Area Rapid Transit District.
  7. ^ "Pittsburg BART station name back in council's hands". East Bay Times. April 9, 2015.
  8. ^ "Pittsburg Center BART Station Groundbreaking" (PDF). BART and Contra Costa Transportation Authority. July 17, 2015. Archived from the original (PDF) on June 12, 2018. Retrieved April 21, 2016.
  9. ^ BART Transit-Oriented Development Program Work Plan: 2024 Update (PDF). San Francisco Bay Area Rapid Transit District. March 2024. p. 17.
edit