Midim Khola Hydropower Station (Nepali:मिदिम खोला जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Lamjung District of Nepal. The flow from Midim Khola River is used to generate 3 MW electricity. The plant is owned and developed by Union Hydropower P.Ltd, an IPP of Nepal. The plant started generating electricity from 2074-10-15BS. The generation licence will expire in 2104-05-05 BS, after which the plant will be handed over to the government. [1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.[2]
Midim Khola Hydropower Station | |
---|---|
Official name | Midim Khola Hydropower Project |
Country | Nepal |
Location | Lamjung District |
Coordinates | 28°10′53″N 84°17′30″E / 28.18139°N 84.29167°E |
Purpose | Power |
Status | Operational |
Owner(s) | Union Hydropower P.Ltd |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Midim Khola River |
Commission date | 2074-10-15 BS |
Type | Run-of-the-river |
Installed capacity | 3 MW |
See also
editReferences
edit- ^ "Operating Projects- Hydro (Above 1MW)".
- ^ Annual Report 2019/2030. Nepal Electricity Authority.