List of tallest buildings in Charlotte

Charlotte, the largest city in the U.S. state of North Carolina, is the site of 62 completed high-rises over 200 feet (61 m), 8 of which stand taller than 500 feet (152 m).[1][2][3][4] The tallest building in the city is the Bank of America Corporate Center, which rises 871 feet (265 m) in Uptown Charlotte and was completed in 1992. It also stands as the tallest building in North Carolina and the 57th-tallest building in the United States.[5][6] The second-tallest skyscraper in the city is the 550 South Tryon formerly Duke Energy Center, which rises 786 feet (240 m) and was completed in 2010.[7] The Truist Center, completed in 2002 and rising 659 feet (201 m), is the 3rd tallest building in Charlotte.[8] 9 of the 10 tallest buildings in North Carolina are located in Charlotte.[9]

Bank of America Corporate Center550 South TryonTruist CenterOne Wells Fargo CenterThe VueOne South at The Plaza1 Bank of America CenterTwo Wells Fargo CenterCharlotte PlazaBB&T Center
Skyline of Charlotte (Use cursor to identify buildings)

The history of skyscrapers in the city began with the construction of the Independence Building in 1909. This building, rising 186 feet (57 m) and 14 floors,[10] is often regarded as the first skyscraper in Charlotte;[11] despite having been added to the Registered Historic Place in 1978, it was demolished in 1981 to allow for the construction of One Independence Center.[10] Charlotte's first building standing more than 492 feet (150 m) tall was the One South at The Plaza, completed in 1974.[12] The project Queensbridge Collective which is composed of 2 buildings will be the first buildings outside of Uptown to rise above 492 feet (150 m).[13][5][7][8][14][15][16][17] The residential tower broke ground May 24, 2023.[18] The office tower is expected to break ground at earliest July 2023. The exact date will depend upon market conditions for office buildings.[19] There are currently ten buildings under construction that are planned to rise at least 200 feet (61 m) or at least 15 floors.[20][21][22][23][24][25] Overall, the Council on Tall Buildings and Urban Habitat ranks Charlotte's skyline (based on existing and under construction buildings over 492 feet (150 m) tall) 4th in the Southeastern United States (after Miami, Atlanta and Sunny Isles Beach), 6th in the Southern United States (after Miami, Houston, Dallas, Atlanta and Sunny Isles Beach), and 19th in the United States.[26][a]

Skyline of Charlotte in 2018

Tallest buildings

edit

As of December 2024, there are 62 high-rises in Charlotte that stand at least 200 feet (61 m) tall, based on standard height measurement. This height includes spires and architectural details but does not include antenna masts.[b][1][2][3]

Rank Name Image Height
ft (m)
Floors Year Coordinates Notes
1 Bank of America Corporate Center   871 (265.5)[5] 60 1992 35°13′38.3″N 80°50′31.6″W / 35.227306°N 80.842111°W / 35.227306; -80.842111 (Bank of America Corporate Center) It is the 237th-tallest building in the world, the 56th-tallest in the United States, the tallest building in North Carolina, the tallest building between Philadelphia and Atlanta, the tallest building constructed in Charlotte in the 1990s, and the tallest office building in the Carolinas.[45] However, with 1,212,176 square feet (112,614.8 m2) of space it is the 2nd largest office building in Charlotte by leasable square feet, the largest is 550 South Tryon.[46]
2 550 South Tryon   786 (239.7)[7] 48 2010 35°13′26″N 80°50′54.7″W / 35.22389°N 80.848528°W / 35.22389; -80.848528 (Duke Energy Center) 550 South Tryon is the 479th-tallest in the world, the 62nd-tallest in the United States, and the 2nd-tallest in North Carolina. It is the tallest building constructed in Charlotte in the 2010s.[47] With 1,370,214 square feet (127,297.0 m2) of space it is the largest office building in Charlotte by leasable square feet.[46]
3 Truist Center   659 (200.8)[8] 47 2002 35°13′39.2″N 80°50′26.9″W / 35.227556°N 80.840806°W / 35.227556; -80.840806 (Hearst Tower) Truist Center is the 3rd-tallest in North Carolina. It is the tallest building constructed in Charlotte in the 2000s.[8][48] With 970,002 square feet (90,116.1 m2) of space it is the 5th largest office building in Charlotte by leasable square feet.[46]
4 Bank of America Tower   632 (192.6)[49] 33[49] 2019 Bank of America Tower is the 4th-tallest in North Carolina. It is also the signature building for the Legacy Union project.[50] With 841,164 square feet (78,146.7 m2) of space it is the 8th largest office building in Charlotte by leasable square feet.[46]
5 Duke Energy Plaza   629 (191.7)[14] 40 2022 Duke Energy Plaza be will be leased by Duke Energy and it will become the new headquarters for Duke.[20] With 1,000,000 square feet (93,000 m2) of space it is the 3rd largest office building in Charlotte by leasable square feet.[46]
6 One Wells Fargo Center   588 (179.2)[51] 42 1988 35°13′25.9″N 80°50′40.3″W / 35.223861°N 80.844528°W / 35.223861; -80.844528 (One Wells Fargo Center) One Wells Fargo Center is the 6th-tallest in North Carolina. It is the tallest building constructed in Charlotte in the 1980s.[52][53] With 994,033 square feet (92,348.7 m2) of space it is the 4th largest office building in Charlotte by leasable square feet.[46]
7 The Vue   576 (175.5)[15] 50 2010 35°13′51.6″N 80°50′41.3″W / 35.231000°N 80.844806°W / 35.231000; -80.844806 (The Vue) The Vue is the 7th-tallest in North Carolina and it is the tallest residential building in the Carolinas.[54]
8 One South at The Plaza   503 (153.3)[16] 40 1974 35°13′35.8″N 80°50′35.8″W / 35.226611°N 80.843278°W / 35.226611; -80.843278 (Bank of America Plaza) One South at The Plaza is the 9th-tallest in North Carolina and the tallest building constructed in Charlotte in the 1970s.[12][55] With 891,136 square feet (82,789.2 m2) of space it is the 7th largest office building in Charlotte by leasable square feet.[46]
9 1 Bank of America Center   484 (147.5)[56] 32 2010 35°13′35.3″N 80°50′26.4″W / 35.226472°N 80.840667°W / 35.226472; -80.840667 (1 Bank of America Center) 1 Bank of America Center is the 10th-tallest in North Carolina.[56] With 746,152 square feet (69,319.8 m2) of space it is the 9th largest office building in Charlotte by leasable square feet.[46]
10 300 South Tryon[c]   463 (141)[57] 25 2017 35°13′33.6″N 80°50′46.3″W / 35.226000°N 80.846194°W / 35.226000; -80.846194 (300 South Tryon) 11th-tallest in North Carolina.[57][58] With 638,000 square feet (59,300 m2) of space it is the 14th largest office building in Charlotte by leasable square feet.[46] It is anchored by Barings who occupies 200,000 square feet (19,000 m2).[59]
11 121 West Trade   462 (140.8)[60] 32 1990 35°13′38.6″N 80°50′38.6″W / 35.227389°N 80.844056°W / 35.227389; -80.844056 (121 West Trade) 12th-tallest in North Carolina.[60]
12 Three Wells Fargo Center   450 (137.2)[61] 32 2000 35°13′28″N 80°50′46.7″W / 35.22444°N 80.846306°W / 35.22444; -80.846306 (Three Wells Fargo Center) 14th-tallest in North Carolina.[61] With 931,046 square feet (86,497.0 m2) of space it is the 6th largest office building in Charlotte by leasable square feet.[46]
13 Museum Tower   447 (136.3)[62] 42 2017 35°13′29.1″N 80°50′55″W / 35.224750°N 80.84861°W / 35.224750; -80.84861 (Museum Tower) 15th-tallest in North Carolina.[d][62] It has 394 units built on top of the Mint Museum Uptown. It has resort style amenities on the 43rd floor with a saltwater pool, lounge and game room.[63]
Fifth Third Center   447 (136.3)[64] 30 1997 35°13′43″N 80°50′30.5″W / 35.22861°N 80.841806°W / 35.22861; -80.841806 (Fifth Third Center) 15th-tallest in North Carolina.[e][64][65] The tower was developed by Trammel Crow Co. for Bank of America.[66] Fifth Third became the anchor tenant in 2010. It occupies 100,300 square feet (9,320 m2).[67] However, Bank of America is the largest tenant with 318,000 square feet (29,500 m2) as of 2019.[68]
15 Two Wells Fargo Center   433 (132)[69] 32 1971 35°13′30.9″N 80°50′42.8″W / 35.225250°N 80.845222°W / 35.225250; -80.845222 (Two Wells Fargo Center) 18th-tallest in North Carolina. With 758,508 square feet (70,467.7 m2) of space it is the 9th largest office building in Charlotte by leasable square feet.[46]
16 Avenue   425 (129.5)[70] 36 2007 35°13′44.7″N 80°50′32.3″W / 35.229083°N 80.842306°W / 35.229083; -80.842306 (Avenue) 19th-tallest in North Carolina.[70] It is a 387 unit condo building on .8 acres developed by Novare Group Inc.[71]
17 400 South Tryon   420 (128)[72] 32 1974 35°13′29.8″N 80°50′49.6″W / 35.224944°N 80.847111°W / 35.224944; -80.847111 (400 South Tryon) 21th-tallest in North Carolina.[72]
18 Carillon Tower   394 (120.1)[73] 24 1991 35°13′42.6″N 80°50′43.2″W / 35.228500°N 80.845333°W / 35.228500; -80.845333 (Carillon Tower) 23rd-tallest in North Carolina.[73]
19 Charlotte Plaza   388 (118.3)[74] 27 1982 35°13′29.6″N 80°50′35.9″W / 35.224889°N 80.843306°W / 35.224889; -80.843306 (Charlotte Plaza) 25th-tallest in North Carolina.[74][75]
20 The Ellis   384 (117)[76] 33 2021 549 apartment units with 19,000 square feet (1,800 m2) of retail.[77] It is one of the tallest residential towers in Charlotte.[78] It is the 14th largest apartment complex in the Charlotte area.[79]
21 Ally Charlotte Center   378 (115.2)[80] 26 2021 Construction started in December 2016 and the building delivered on May 3, 2021.[81][82][83][84] With 725,000 square feet (67,400 m2) of space it is the 11th largest office building in Charlotte by leasable square feet.[46]
22 FNB Tower Charlotte   371 (113)[85] 29 2021 FNB Corporation anchored building with 156,000 square feet (14,500 m2) of office space, 196 luxury apartments, and 2,300 square feet (210 m2) of retail space. It broke ground in December 2018.[86] The building opened on July 21, 2021.[87]
23 Lowe's Global Technology Center   357 (108.8)[88] 23 2021 It sits across the street from the Design Center of the Carolinas and is anchored by Lowe's. Construction started August 2019.[22] It is the tallest building outside of Uptown.[13]
24 Catalyst   338 (103)[89] 27 2009 35°13′33.5″N 80°50′53.1″W / 35.225972°N 80.848083°W / 35.225972; -80.848083 (Catalyst) With 462 apartments it is the 23rd largest apartment complex in the Charlotte area.[79][90]
Ascent Uptown   338 (103)[91] 33 2017 35°13′38.7″N 80°50′48.9″W / 35.227417°N 80.846917°W / 35.227417; -80.846917 (Ascent Uptown) It contains 300 units with 20,000 square feet (1,900 m2) of amenities on the top 2 floors [92]
26 Honeywell Tower   331 (101)[93] 23 2021 Construction starting September 2019. The third building as part of the Legacy Union development.[23]
27 525 North Tryon   330 (100.6)[94] 19 1999 35°13′51.9″N 80°50′17.3″W / 35.231083°N 80.838139°W / 35.231083; -80.838139 (525 North Tryon) With 425,298 square feet (39,511.5 m2) of space it is the 24th largest office building in Charlotte by leasable square feet.[46] Bank of America is the largest tenant of the building occupying seven floors for 194,000 square feet (18,000 m2) of space.[95][96][97]
28 TradeMark   325 (99.1)[98] 28 2007 35°13′44.4″N 80°50′44.5″W / 35.229000°N 80.845694°W / 35.229000; -80.845694 (TradeMark) [99]
29 First Citizens Plaza   320 (97.5)[100] 23 1987 35°13′36.7″N 80°50′39.3″W / 35.226861°N 80.844250°W / 35.226861; -80.844250 (First Citizens Plaza) With 476,987 square feet (44,313.5 m2) of space it is the 20th largest office building in Charlotte by leasable square feet.[46] It was purchased by The Dilweg Cos. in 2017 for $79 million.[101] However, in April 2023 the property was returned to the lender after the owner defaulted on the loan at that time the building was 43% occupied.[102][103]
30 Kingston South End   318 (96.9)[104] 24 2024 It is a 24-story residential tower with 324 apartments and 15,000 square feet (1,400 m2) of ground floor retail. It is being developed by White Point Partners and Greystar, located at the corner of South Blvd and E Kingston in South End. Construction began in December 2021 and it delivered in October 2024[105][106][107]
31 The Arlington   310 (94.5)[108] 24 2002 35°13′1.8″N 80°51′9.1″W / 35.217167°N 80.852528°W / 35.217167; -80.852528 (The Arlington) It was the tallest building outside of Uptown Charlotte until Lowe's Global Technology Center was completed in 2021.[109][88]
Skye   310 (94.5)[110] 22 2013 35°13′21.3″N 80°50′27.7″W / 35.222583°N 80.841028°W / 35.222583; -80.841028 (Skye) It is a 172 room Hyatt Place hotel and contains 69 condos with a 8,000 square feet (740 m2) restaurant on the 20th floor.[111][112]
33 110 East   305 (92.9)[113] 23[114] 2024 It is a 370,000 square feet (34,000 m2) office tower with 7,000 square feet (650 m2) of street level retail at the intersection of South Boulevard and East/West Boulevard.[114] Ground breaking occurred on January 26, 2022.[115]The building delivered in April 2024 without any tenants.[116]
34 One Independence Center   301 (91.8)[117] 22 1983 35°13′39.9″N 80°50′34.1″W / 35.227750°N 80.842806°W / 35.227750; -80.842806 (101 Independence Center) The building is the site of the former Independence Building, which is considered Charlotte's first skyscraper.[10][118] With 565,694 square feet (52,554.7 m2) of space it is the 18th largest office building in Charlotte by leasable square feet.[46] As the largest tenant Bank of America occupies 166,000 square feet (15,422 m2)[119][120][117][121]
35 200 South College   300 (91.5)[122] 22 1974 35°13′31.4″N 80°50′37.1″W / 35.225389°N 80.843639°W / 35.225389; -80.843639 (BB&T Center) The building was developed for Southern National Bank.[123] BB&T was the anchor tenant with 120,000 square feet (11,000 m2) until 2021 when they left the building to relocate their employees to Truist Center.[124] With 567,865 square feet (52,756.4 m2) it is the 7th largest office building in Charlotte by leasable square feet.[46][122][125]
AC Hotel/Residence Inn Charlotte EpiCentre   300 (91.5[126] 22 2018 Construction started in 2015 and it delivered in the spring 2018. With 300 rooms it the 11th largest hotel in Charlotte by number of rooms.[127][128]
37 200 South Tryon   299 (91.1)[129] 18 1961 35°13′35.3″N 80°50′40.9″W / 35.226472°N 80.844694°W / 35.226472; -80.844694 (200 South Tryon) Tallest building constructed in Charlotte in the 1960s.[129][130]
38 The Westin Charlotte   293 (89.3)[131] 25 2003 35°13′18.7″N 80°50′50.1″W / 35.221861°N 80.847250°W / 35.221861; -80.847250 (The Westin Charlotte) It contains 700 rooms, making it the largest hotel in Charlotte by number of rooms.[127]
550 South   293 (89.3)[132] 20 2009 35°13′14.2″N 80°50′38.9″W / 35.220611°N 80.844139°W / 35.220611; -80.844139 (NASCAR Plaza) [132][133]
40 The Hilton Charlotte Center City[f]   292 (89)[134] 22 1990 35°13′26.1″N 80°50′37.6″W / 35.223917°N 80.843778°W / 35.223917; -80.843778 (The Hilton Charlotte Center City) With 400 rooms it is the 5th largest hotel in Charlotte by number of rooms.[127][135][136]
41 650 S Tryon   291 (88.6)[137] 18 2020 Second office tower planned on the Legacy Union development site. Construction completed mid November 2020.[138]
42 112 Tryon Plaza   280 (85.3)[139] 22 1927 35°13′37.3″N 80°50′37.5″W / 35.227028°N 80.843750°W / 35.227028; -80.843750 (112 Tryon Plaza) Tallest building constructed in Charlotte in the 1920s.[139][140]
JW Marriott Charlotte   280 (85.3)[141] 22 2021 Construction started in December 2018. With 381 rooms it is the 7th largest hotel in Charlotte by number of rooms.[127] The hotel opened August 17, 2021.[142]
44 Element Uptown[f]   278 (84.9)[143] 22 2014 35°13′36.2″N 80°50′56″W / 35.226722°N 80.84889°W / 35.226722; -80.84889 (Element Uptown) 22-story 352-unit apartment tower across the street from Romare Bearden Park, developed by Childress Klein. It was sold to Bell Partners in June 2022 for $165 million.[144][145]
45 SkyHouse Uptown North Tower   264 (80.5)[146] 24 2015 35°13′56.4″N 80°50′14.8″W / 35.232333°N 80.837444°W / 35.232333; -80.837444 (SkyHouse Uptown North Tower) One of 2 twin residential towers that combined feature 672 apartments, which makes it the 5th largest apartment complex in the Charlotte area. The project was developed by Novare Group, Batson-Cook Development Co, and Grubb Properties.[147][148][79]
SkyHouse Uptown South Tower   264 (80.5)

[149]

24 2017 35°13′54.4″N 80°50′17.6″W / 35.231778°N 80.838222°W / 35.231778; -80.838222 (SkyHouse Uptown South Tower) One of 2 twin residential towers that combined feature 672 apartments, which makes it the 5th largest apartment complex in the Charlotte area. The project was developed by Novare Group, Batson-Cook Development Co, and Grubb Properties.[147][150][79]
47 Regions 615   260 (79.1)[151] 19 2017 35°13′17.5″N 80°50′53.3″W / 35.221528°N 80.848139°W / 35.221528; -80.848139 (615 South College) It contains 375,865 square feet (34,919 m2) of leasable space. Regions Financial anchors the building.[152]The building also contains 300 MUFG Union Bank employees.[153] As of September 2023 it was 99% occupied.[154]
48 Charlotte Marriott City Center   252 (76.8)[155] 19 1984 35°13′40.6″N 80°50′36.9″W / 35.227944°N 80.843583°W / 35.227944; -80.843583 (Charlotte Marriott City Center) The Charlotte Marriott City Center was built as a part of the $120 million 101 Independence Center and hotel project developed by Henry Faison. The hotel sits on the land of the former White House Inn, the site of the vacant hotel was purchased in 1982.[156][157] With 446 rooms it is the 2nd largest hotel in Charlotte by number of rooms.[127][158]
Omni Charlotte Hotel[f]   252 (76.8)[159] 19 1977 35°13′35.3″N 80°50′33.5″W / 35.226472°N 80.842639°W / 35.226472; -80.842639 (Omni Charlotte Hotel) With 373 rooms it is the 8th largest hotel in Charlotte by number of rooms.[127][24][160]
50 129 West Trade   250 (76.2)[161] 17 1958 Tallest building constructed in Charlotte in the 1950s.[161]
51 Le Méridien Charlotte[f]   238 (72.5)[162] 18 1973 35°13′2.4″N 80°50′18.7″W / 35.217333°N 80.838528°W / 35.217333; -80.838528 (Le Méridien Charlotte) The hotel was previously part of the Blake Hotel, which had 605 rooms. In early 2015 the former hotel completed a $20 million renovation to become The Sheraton with 305 room and Le Méridien with 300. Le Méridien is the 11th largest hotel in Charlotte by number of rooms.[127][163][164][165][166]
Sonesta Charlotte Executive Park   238 (72.5)[167] 18 1983 The hotel is owned by Hospitality Properties Trust, purchased in 2017 for $44 million. With 300 rooms it is the 11th largest hotel in Charlotte by number of rooms.[168][127] In 2014 a $10 million renovation was finished.[169] The renovation included upgrades to guestrooms, public areas, meeting space, the hotel restaurant, and bar.[170]
53 The Francis Apartments   230 (70.1)[171] 19 2018 $150 million mixed used development by Crescent Communities and CNM Enterprises in Uptown Charlotte. It contains 459 apartments, a 38,000 square feet (3,530 m2) Whole Foods, Home2 Suites by Hilton hotel, and 23,000 square feet (2,137 m2) of additional retail space. Retail tenants include Starbucks, Fifth Third Bank, and a high-end nail salon.[172]
54 Kimpton Tryon Park   226 (69)[173] 18 2017 35°13′34.4″N 80°50′47.6″W / 35.226222°N 80.846556°W / 35.226222; -80.846556 (Kimpton Tryon Park Charlotte) With 217 rooms it is the 25th largest hotel in Charlotte by number of rooms.[127][174][175][176]
55 Ritz-Carlton Charlotte   225 (69.1)[177] 17 2009 150 room hotel built by Bank of America for $500 million combined cost for 1 Bank of America Center and the hotel. The bank has an agreement with the hotel to cover their losses in order to keep the hotel open.[178][179] Also, bank employees will receive discounted rates.[180]
Johnston Building   225 (69.1)[181] 17 1924 It was the tallest building in Charlotte when completed. The building was designated as a historic landmark by the Charlotte-Mecklenburg Historic Landmarks Commission in 1992.[182] In December 2024 Charlotte City Council approved a redevelopment of the entire building to become a 245 room hotel.[183]
56 Uptown 550   223 (68)[184] 21 2019 21 story apartment tower that along with a 6-story building contains 421 apartments. It was developed and owned by Northwood Ravin. The building broke ground in December 2016 and was completed in October 2019. The project cost was $82.151 million, and it sits on a 3.76-acre site in Uptown Charlotte.[185]
57 Charlotte-Mecklenburg Government Center   214 (65.2)[186] 14 1988
58 440 South Church   212 (64.7)[187] 16 2009 The building contains 365,000 square feet (33,900 m2), Ally Financial anchored the building from 2009[188] to moving into Ally Charlotte Center in 2021.[189]
Towerview at Ballantyne   212 (64.7)[190] 16 2021 Announced in October 2019 by Northwood Ravin as Ballantyne Corporate Park's first apartment tower. The 16-story building with an attached low-rise building have 212 apartments. The building was part of the early stages of Ballantyne Reimagined.[191]
The Line   212 (64.6)[192] 16 2022 A 16-story building developed by Portman[25] on a 2.2 acre lot next to the former location of Sycamore Brewing.[193] Foundry Commercial became the first tenant of the building starting on May 16, 2022.[194]
61 Capitol Towers North   200 (60.9)[195] 10 2017 Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[196][197]
Capitol Towers South   200 (60.9)[198] 10 2015 Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[196][197]

Tallest under construction

edit

As of December 2024, there are 9 buildings that are under construction, or under demolition, or in site prep in Charlotte that are planned to rise at least 200 feet (61 m).[g][2][3]

Name Image Height
ft (m)
Floors Year Notes
Queensbridge Collective Residential Tower   556 (169.4) 42[199] 2025 The tower will be 42 stories it includes 409 apartments and 25,000 square feet (2,300 m2) of retail.[200][201][202] It broke ground on May 24, 2023.[18] However, vertical construction did not start until December 2023 and it will deliver in the third quarter of 2025. Once completed it will be the second tallest residential tower in North Carolina.[200][203]
Southern Land Company Residential Tower   397 (121) 30[204] 2026 It is a mixed-use tower with 300 luxury apartments that will be built on the current site of Tyber Creek Pub. It is being developed by Southern Land Company on an 1 acre (0.40 ha) lot at the corner of Tremont Ave and South Blvd which combines lots 1919, 1923 and 1933 South Blvd. The historic building at 1923 South Blvd., which is part of the land purchased by Southern Land Company, will be relocated to 1829 Cleveland Ave.[205][206] Tyber Creek will be closing on March 18, 2024.[207]
Metropolitan Apartment Tower   357 (108.8) 27[208] 2027 Northwood Ravin is planning to build a 27-story[208] 283-unit apartment tower at the corner of Metropolitan Avenue and South Kings Drive. In 2020 Northwood purchased the 1.3 acres (0.53 ha) site for $2.25 million from J.P. Morgan Chase & Co.[209] The rezoning was approving in April 2021 originally for 330 apartments.[210] It will broke ground in early 2024.[208]
Radius Dilworth Overlook   345 (105.1)[211] 26[212] 2025[213] The complex is composed of 2 apartment towers at the corner of Morehead Street and Euclid Avenue with a combined total of 626 units with 6,000 square feet (560 m2) of ground level retail.[214] The 2 parcels that make up the lot were purchased by Spandrel Development in December 2020 for $17.8 million.[212] The project broke ground in May 2022. The 2 buildings include the 26-story tower, Overlook, which will deliver in the 4th quarter of 2024 and the 8-story building, Enclave, which will deliver in the first quarter of 2024.[215] Once it delivers the complex will be the 7th largest apartment community in the Charlotte area.[79]
Oro Ballantyne   345 (105.1) 26[216] 2025[217] It is a 26-story apartment tower that will have 365 units that is split between the high-rise and mid-rise buildings located in Ballantyne Corporate Park as part of The Bowl, which is a part of the Ballantyne Reimagined project. The building topped out in March 2024 and it is on track to deliver in October 2025.[218][216][219]
600 South Tryon   318 (96.9)[220] 24[221] 2024 It is the 4th office tower that is a part of the Legacy Union project. The tower will be anchored by Robinson Bradshaw, who signed a 15-year lease, they will occupy 102,000 square feet (9,500 m2) of space over the top 4 floors.[221] Construction started in April 2022 and will complete in September 2024.[222][221][223][224] The 24-story tower will contain 415,000 square feet (38,600 m2) of total space including 20,000 square feet (1,900 m2) of ground floor retail.[221] Once completed it will be the 25th largest office building in Charlotte by square footage.[46]
Linea   318 (96.9)[225] 24[226] 2024 It is an apartment tower with 370 units along with 18,700 square feet (1,740 m2) of ground-floor retail and restaurant space. It is being built next to the completed The Line where Sycamore Brewing relocated.[227] The vertical construction of the tower began in January 2023[227][228] and it topped out in March 2024. The building is expected to deliver in the 4th quarter.[229]
The Howard R. Levine Center for Education   270 (82.2)[230] 14[231] 2025[232] It will be the Wake Forest University School of Medicine Charlotte campus main education tower containing medical school classrooms. The building will be 14 stories, 270 feet tall, with 300,000 square feet (27,871 m2) of space.[230][233] The ground breaking ceremony occurred on January 17, 2023 near the intersection of Baxter and South McDowell. Construction will complete by spring 2025.[234][231]
Bond on Mint   226 (68.8)[235] 17[236] 2025 It is a 17-story apartment building being developed by Aspen Heights Partners, located at the corner of Mint St and Morehead St in South End with 393 units. The 1.4 acre lot was purchased in April 2022 for $16.3 million and groundbreaking occurred shortly after the land sale was complete. Construction will complete in the fall of 2023.[236]

Tallest approved pending construction

edit

These buildings have either been approved, issued permits, or awaiting construction [237] [238][239]

Name Height
ft (m)
Floors Year Notes
1111 South Tryon Street 463 (141.1) 35[199] 2025 Office tower with 600,000 square feet (56,000 m2)[240] to be developed by Riverside Investment & Development, planned on the 3 acres (1.2 ha) site of the Uptown Cabaret and Midnight Diner at 1111 S. Tryon Street. The entire project will include 2,000 parking spaces.[201][202] The development's groundbreaking ceremony occurred on May 24, 2023. Commercial real estate market conditions will determine the office tower's start of construction. The Uptown Cabaret once occupied the site of the tower, it closed July 1, 2023 and the building was torn down shortly thereafter.[241][19]
Carson & Tryon Office Building 411 (125.2)[242] 31[243] 2025 It is a 31-story mixed use tower with 565,000 square feet (52,500 m2) of office space, 200 room hotel, 10,000 square feet (930 m2) of retail, and 200 residential units.[244][243][245] The 3 acres (1.2 ha) site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site.[246][247] Crescent Communities applied for building permits with Mecklenburg County on October 14, 2024, although a ground breaking date has not been set.[248] Charlotte's largest law firm Moore & Van Allen will anchor the building. The firm currently occupies 152,000 square feet (14,100 m2) at Bank of America Corporate Center. It is unclear how much space the firm will occupy in the new building.[249]
Carson & Tryon Hotel 265 (80.7) 20[204] 2025 200 room hotel that is a part of the development Carson & Tryon. The development also includes a 31-story mixed use tower with 565,000 square feet (52,500 m2) of office space, 10,000 square feet (930 m2) of retail, and 200 residential units.[244][243][245] The 3 acres (1.2 ha) site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site[246][247] Construction will start in 2023[202] and complete in 2025.[243]
1728 South Blvd. 265 (80.7) 20[250] 2025 Office Tower that will be a joint venture between White Point Partners, MRP Realty and Barings with 400,000 square feet (37,000 m2) of office space, ground floor retail, and a rooftop terrace. The building will be near Ascent South End. It will be built on the lot that Walgreens once occupied and the store will be built on the ground floor once complete. Construction will begin in 2023.[250]
VeLa Uptown 368 (112.1) 32[251] 2026 379 luxury apartments which are being developed at 200 E. Seventh St., former site of the Levine Museum of the New South. The .7 acres (0.28 ha) site at the corner of East Seventh and North College was purchased on March 13, 2022, for $10.75 million. It will also include 4,000 square feet (370 m2) of retail and 20,000 square feet (1,900 m2) of resident amenity space. The project cost is $170 million. Construction will begin in 2025 and complete in the 4th quarter of 2026.[252][251][253]
205 E Bland St 265 (80.7) 20[254] 2026 Cousins Properties is planning a 200,000 square feet (19,000 m2) office building on a .9 acres (0.36 ha) parking lot. The building will also include ground-floor retail and onsite parking.[254] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lot 1401 S. Tryon St. and 200 E. Bland St.[254][255]
2915 Griffith 265 (79.2) 20[256] 2026 325,000 square feet (30,200 m2) building on a 1.7 acres (0.69 ha) lot located directly next to Suffolk Punch and across from Lynx Blue Line's New Bern Station in South End, construction will start in the second quarter of 2022 and finish in 2024.[257][258]
Camden Exchange 398 (121.3) 30[259] 2026 Apartment tower with 315 units, 10,000 square feet (930 m2) of ground floor retail, and 10,000 square feet (930 m2) of office space occupied by Catalyst. It is being developed by Catalyst Capital Partners and Stiles Corp and it will be built on the former site of Price's Chicken Coop located at 1600 and 1604 Camden Road. It will break ground in late 2024.[253][202][260]
Intercontinental Hotel at Belk Place 451 (137.4) 34[261] 2026 It will contain 244 room luxury hotel,[261] which will make it the 22nd largest hotel in Charlotte by number of rooms.[127] Construction started in February 2018, on hold due to the COVID-19 pandemic's effect on the Charlotte hotel business[262] Will become the tallest hotel in the Southern United States outside of Atlanta upon completion.[263][264] The hotel developer, Salter Brothers, announced in June 2023 the project is back on track. Construction will start in summer 2024 and complete in mid-2026.[261]
1427 South Blvd 411 (125.2) 31[265] 2027[266] Washington, D.C. developer Akridge and Virginia-based property management company Kettler are developing a 31-story 450 unit apartment building on a .9 acres (0.36 ha) lot. The building will also include ground level retail, a resort style pool, fitness center, and co-working space. The companies purchased the lot on December 20, 2022, for $13.5 million. It is currently occupied by businesses Modern Man, Savvy Seconds Consignment, Fresh Nails, Lucky Fish and Destined To Make It.[265] It will break ground in 2024.[266]
Brooklyn Village Phase 1 Office Tower 1 318 (96.9) 24[267] 2026 It is a 24-story office tower that is being built as a part of the Brooklyn village development phase 1. This is 1 of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot that was previously occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave.[267] The land sold in July 2023 for $10.3 million. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[268][269]
Brooklyn Village Phase 1 Office Tower 2 212 (65) 16[267] 2026 It is a 16-story office tower being built as a part of the Brooklyn village development phase 1. This is the second of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels.[267] The land sold in July 2023 for $10.3 million. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[268][269]
Phillips Place Office Tower 250 (76.2)[270] 10[271] Mixed used building with 250,000 square feet of office space and 20,000 square feet of ground retail that will be developed by Lincoln Harris. It will be built on the 3.65 acres (1.48 ha) site that the Regal Phillips Place once occupied.[272] The movie theater's lease ran until the end of 2025. Therefore, construction of the new tower was not planned to begin until after the theater's lease expires.[273][274] If built it will be the tallest building in South Park.[275] The Regal Phillips Place closed on October 16, 2022.[276] The building was demolished in March 2023. However, Lincoln Harris has still not released a timeline for construction.[277]
South End Station Building 1 212 (64.7) 16[204] Cousins Properties is planning a 2 building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include a potential 300 multifamily units, retail and office space.[255][204] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[254][255][278]
South End Station Building 2 212 (64.7) 16[204] Cousins Properties is planning a 2 building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include a potential 300 multifamily units, retail and office space.[255][204] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[254][255][278]
Tremont Alley Office Building 251 (76.5) 19[279] Cousins is building a 350,000 square feet (33,000 m2) office tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail and the building will sit on podium parking. It will occupy a 2.4 acre lot that was purchased in December 2020 for $18.7 million that was composed of 3 parcels 242 Tremont Ave., 306 Tremont Ave., and 305 Dogget St.. The lot is currently vacant, the previous industrial building have been demolished.[279][278]
Tremont Alley Apartment Building 251 (76.5) 19[279] Cousins is building a 305-unit residential tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail and the building will sit on podium parking. It will occupy a 2.4-acre lot that was purchased in December 2020 for $18.7 million that was composed of 3 parcels 242 Tremont Ave., 306 Tremont Ave., and 305 Dogget St. The lot is currently vacant, the previous industrial building has been demolished.[279][278]
1426 S Tryon St. 265 (80.7) 20[280] Highwoods Properties Inc. in May 2022 purchased the lot across the street from the Railyard for $27 million. Currently occupying the site is a low-rise building containing an ABC store. A mixed-use building with 300,000 square feet (28,000 m2) of office space and 250 apartments is planned.[280]
1175 Pearl Park Way 275 (83.82)[281] Pappas Properties is a planning a three building development in midtown that is the final phase of a multi phase development in the area. The three building includes a 275 foot apartment tower with 425 units, 150-room hotel, 100,000 square feet (9,300 m2) of office space, 35,000 square feet (3,300 m2) of retail on a 2.2 acre lot.[281]

Timeline of tallest buildings

edit
 
The Bank of America Corporate Center has been the tallest building in Charlotte since 1991.

Since 1909, the year the first high-rise in the city was constructed,[11] the title of the tallest building in Charlotte has been held by eight high-rises.

Original name Years as tallest Height
ft (m)
Floors Reference(s)
Independence Building[h] 1909–1924 (15 years) 185 (56.3) 14 [10]
Johnston Building[i] 1924–1926 (2 years) 225 (68.58) 17 [181]
112 Tryon Plaza 1926–1961 (35 years) 280 (85.3) 22 [139]
200 South Tryon 1961–1971 (10 years) 299 (91.1) 18 [129]
Two Wells Fargo Center 1971–1974 (3 years) 433 (132) 32 [69]
One South at The Plaza 1974–1988 (14 years) 503 (153) 40 [16]
One Wells Fargo Center 1988–1991 (3 years) 588 (179.2) 42 [51]
Bank of America Corporate Center 1991–present (33 years) 871 (265.5) 60 [5]

See also

edit

Notes

edit
  1. ^ New York has 293 existing and under construction buildings over 492 feet (150 m),[27] Chicago has 128,[28] Miami has 56,[29] Houston has 39,[30] Los Angeles has 32,[31] San Francisco has 28,[32] Boston has 20,[33] Seattle has 20,[34] Dallas has 19,[35] Atlanta has 16,[36] Las Vegas has 15,[37] Philadelphia has 14,[38] Jersey City has 12,[39] Sunny Isles Beach has 11,[40] Pittsburgh has 10,[41] Minneapolis has 9,[42] Denver has 8,[43] Detroit has 8,[44] and Charlotte has 8.[26]
  2. ^ If two or more buildings are of the same height, they are listed in order of floor count, then alphabetically. The "Year" column indicates the year in which a building was originally completed.
  3. ^ Height estimated by the CTBUH.
  4. ^ Along with the Fifth Third Center.
  5. ^ Along with the Museum Tower.
  6. ^ a b c d Height estimated by Emporis.
  7. ^ Any buildings that have been topped out but are not completed are also included.
  8. ^ Demolished in 1981.
  9. ^ Original height unknown. 17 floors since 1929.

References

edit
General
  • "Charlotte". The Skyscraper Center. CTBUH. Retrieved July 23, 2017.
  • "Charlotte". Emporis. Archived from the original on April 8, 2015. Retrieved July 23, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  • "Charlotte". Skyscraper Source Media. Retrieved July 23, 2017.
  • "North Carolina Skyscraper Diagram (completed)". Skyscraper Source Media. Retrieved July 27, 2017.
Specific
  1. ^ a b "Charlotte (completed)". The Skyscraper Center. CTBUH. Retrieved July 22, 2017.
  2. ^ a b c "High-rise buildings in Charlotte". Emporis. Archived from the original on July 31, 2017. Retrieved July 18, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  3. ^ a b c "Skyscrapers in Charlotte". Emporis. Archived from the original on July 30, 2017. Retrieved July 30, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  4. ^ "Charlotte Skyscraper Diagram". Skycraper Page. Retrieved December 9, 2023.
  5. ^ a b c d "Bank of America Corporate Center". The Skyscraper Center. CTBUH. Retrieved July 13, 2017.
  6. ^ "Bank of America Corporate Center". Emporis. Archived from the original on February 19, 2007. Retrieved July 13, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  7. ^ a b c "Duke Energy Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
  8. ^ a b c d "Hearst Tower". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
  9. ^ "North Carolina Skyscraper Diagram (completed)". Skyscraper Source Media. Retrieved November 20, 2017.
  10. ^ a b c d "Independence Building". Emporis. Archived from the original on May 14, 2015. Retrieved July 18, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  11. ^ a b "Charlotte High Rise Buildings". Charlotte-Mecklenburg Historic Landmarks Commission. Retrieved July 18, 2017.
  12. ^ a b "Bank of America Plaza". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
  13. ^ a b Soloff, Katie Peralta (October 7, 2021). "6 biggest developments underway shaping South End". Axios Charlotte. Retrieved October 7, 2021.
  14. ^ a b "Charlotte Metro Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  15. ^ a b "The Vue". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  16. ^ a b c "Bank of America Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  17. ^ Franco, Elise (September 13, 2022). "Riverside reveals changes to Queensbridge Collective project near uptown Charlotte, South End (RENDERINGS)". Charlotte Business Journal. Retrieved March 23, 2023.
  18. ^ a b Franco, Elise (May 25, 2023). "Riverside's Queensbridge Collective to be 'another jewel' in Charlotte's crown (PHOTOS)". Charlotte Business Journal. Retrieved May 25, 2023.
  19. ^ a b Franco, Elise (May 16, 2023). "Construction set to start on first phase of Riverside's $700 million mixed-use development (RENDERINGS)". Charlotte Business Journal. Retrieved May 16, 2023.
  20. ^ a b Fahey, Ashley (May 17, 2021). "Duke Energy to exit current HQ building in uptown after company's new tower delivers". Charlotte Business Journal. Retrieved May 17, 2021.
  21. ^ Cope, Cassie (December 26, 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved June 11, 2021.
  22. ^ a b Crane, Brianna (June 27, 2019). "View Renderings: Lowe's choose South End for new tech hub, moving into stunning 23-story tower". Charlotte Axios. Retrieved March 19, 2021.
  23. ^ a b "Honeywell HQ to anchor latest office tower at Legacy Union in uptown". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
  24. ^ a b Thomas, Jennifer (June 18, 2020). "When JW Marriott Charlotte expects to open in uptown after hitting construction milestone". Charlotte Business Journal. Retrieved May 30, 2021.
  25. ^ a b Sealey, Clayton (November 26, 2019). "Guide: The Growing Skyline in Charlotte's South End". Charlotte Magazine. Retrieved February 23, 2020.
  26. ^ a b "Charlotte United States". Council on Tall Buildings and Urban Habitat. Retrieved March 23, 2023.
  27. ^ "New York City (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  28. ^ "Chicago (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  29. ^ "Miami (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  30. ^ "Houston (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  31. ^ "Los Angeles (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  32. ^ "San Francisco (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  33. ^ "Boston (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  34. ^ "Seattle (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  35. ^ "Dallas (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  36. ^ "Atlanta (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  37. ^ "Las Vegas (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  38. ^ "Philadelphia (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  39. ^ "Jersey City (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  40. ^ "Sunny Isles Beach (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  41. ^ "Pittsburgh (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  42. ^ "Minneapolis (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  43. ^ "Denver (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  44. ^ "Detroit (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
  45. ^ "Bank of America Corporate Center". Skyscraper Source Media. Retrieved July 13, 2017.
  46. ^ a b c d e f g h i j k l m n o p q Sharipo, Amy (October 27, 2023). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved December 23, 2023.
  47. ^ "Duke Energy Center". Skyscraper Source Media. Retrieved July 14, 2017.
  48. ^ "Hearst Tower". Skyscraper Source Media. Retrieved July 14, 2017.
  49. ^ a b "Bank of America Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  50. ^ "620 South Tryon". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
  51. ^ a b "One Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  52. ^ "One Wells Fargo Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
  53. ^ "One Wells Fargo Center". Skyscraper Source Media. Retrieved July 14, 2017.
  54. ^ "The Vue". Skyscraper Source Media. Retrieved July 14, 2017.
  55. ^ "Bank of America Plaza". Skyscraper Source Media. Retrieved July 14, 2017.
  56. ^ a b "1 Bank of America Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  57. ^ a b "300 S Tryon". Council on Tall Buildings and Urban Habitat. Retrieved September 24, 2021.
  58. ^ "300 South Tryon". Skyscraper Source Media. Retrieved November 20, 2017.
  59. ^ Boye, Will (May 1, 2014). "Sources: Spectrum planning uptown office tower, has anchor tenant". Charlotte Business Journal. Retrieved June 13, 2021.
  60. ^ a b "121 West Trade". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  61. ^ a b "Three Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  62. ^ a b "Mint Museum Apartments Tower". Skyscraper Source Media. Retrieved November 29, 2022.
  63. ^ Williams-Tracy, Laura (October 20, 2017). "Uptown's Museum Tower is taking it to a higher level". Charlotte Business Journal. Retrieved January 1, 2024.
  64. ^ a b "Fifth Third Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  65. ^ "Fifth Third Center". Skyscraper Source Media. Retrieved July 14, 2017.
  66. ^ "What's In A Name", The Charlotte Observer, December 1, 1997.
  67. ^ Boye, Will (March 19, 2015). "Fifth Third Center lands new tenant, plus existing tenant expands at uptown tower". Charlotte Business Journal. Retrieved September 28, 2022.
  68. ^ Fahey, Ashley (November 22, 2019). "Bank takes more space at uptown tower as it plots growth in Charlotte region". Charlotte Business Journal. Retrieved September 28, 2022.
  69. ^ a b "Two Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  70. ^ a b "Avenue". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  71. ^ "Novare breaks ground on 27-story tower". Charlotte Business Journal. August 29, 2007. Retrieved January 3, 2024.
  72. ^ a b "400 South Tryon". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  73. ^ a b "Carillon Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  74. ^ a b "Charlotte Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  75. ^ "Charlotte Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
  76. ^ "The Ellis". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  77. ^ Sealey, Clayton (June 23, 2021). "Charlotte's newest residential tower is complete, with hundreds of ready-to-lease units". Charlotte Observer. Retrieved June 24, 2021.
  78. ^ "Hoar Construction Completes 33-Story Ellis Apartment High-Rise in Uptown Charlotte". ReBusiness Online. June 28, 2021. Retrieved June 28, 2021.
  79. ^ a b c d e Sharipo, Amy (August 18, 2023). "Charlotte's largest apartment communities". Charlotte Business Journal. Retrieved December 23, 2023.
  80. ^ "Ally Charlotte Center". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  81. ^ Chemtob, Danielle (May 3, 2021). "Construction on the latest bank tower in the Charlotte skyline is now complete". Charlotte Observer. Retrieved May 5, 2021.
  82. ^ Thomas, Jason (September 21, 2017). "Uptown will be getting a new bank tower — Ally Charlotte Center". Agenda. Charlotte Agenda. Retrieved December 12, 2017.
  83. ^ Portillo, Ely. "Busy uptown intersection is closing for December to make way for a new office tower". Charlotte Observer. Ely Portillio. Retrieved December 12, 2017.
  84. ^ Fahey, Ashley. "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
  85. ^ "FNB Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  86. ^ Cope, Cassie (December 26, 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved June 11, 2021.
  87. ^ Kuznitz, Allison (July 21, 2021). "The newest addition to the Charlotte skyline just opened near Bank of America Stadium". Charlotte Observer. Retrieved July 22, 2021.
  88. ^ a b "Design Center Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  89. ^ "Catalyst". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  90. ^ "Catalyst". Skyscraper Source Media. Retrieved July 15, 2017.
  91. ^ "Ascent Uptown". Skyscraper Source Media. Retrieved December 1, 2022.
  92. ^ Fahey, Ashely (June 28, 2017). "A look inside uptown Charlotte's newest luxury apartment high-rise (PHOTOS)". Charlotte Business Journal. Retrieved October 5, 2022.
  93. ^ "Honeywell Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  94. ^ "525 North Tryon". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  95. ^ Fahey, Ashley (January 25, 2017). "Bank of America renews 194,000-square-foot lease at 525 North Tryon". Charlotte Business Journal. Retrieved January 7, 2024.
  96. ^ Fahey, Ashley (November 18, 2016). "525 North Tryon updates part of changing corridor around it". Charlotte Business Journal. Retrieved January 7, 2024.
  97. ^ "525 North Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
  98. ^ "333 West Trade Street". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  99. ^ "TradeMark". Skyscraper Source Media. Retrieved July 15, 2017.
  100. ^ "First Citizens Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  101. ^ Fahey, Ashley (April 10, 2017). "Real estate firm acquires uptown office tower for $79M; plans to open Charlotte office". Charlotte Business Journal. Retrieved January 6, 2024.
  102. ^ Fahey, Ashley (April 24, 2023). "Real estate firm Dilweg hands First Citizens Bank Plaza back to lender after WeWork defaults on lease". Charlotte Business Journal. Retrieved January 6, 2024.
  103. ^ "First Citizens Building". Skyscraper Source Media. Retrieved July 15, 2017.
  104. ^ "1714 South Boulevard". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  105. ^ Franco, Elise (July 29, 2024). "White Point Partners, Greystar near delivery on high-rise luxury apartments in South End". Charlotte Business Journal. Retrieved July 29, 2024.
  106. ^ Huguley, Collin (June 29, 2021). "White Point Partners, Greystar reveal new details on high-rise project in South End". Charlotte Business Journal. Retrieved June 29, 2021.
  107. ^ "Greystar, White Point Break Ground on Ascent South End". Cision PR Wire. March 3, 2022. Retrieved March 9, 2022.
  108. ^ "The Arlington". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  109. ^ "The Arlington". Skyscraper Source Media. Retrieved July 15, 2017.
  110. ^ "Skye Building". Council on Tall Buildings and Urban Habitat. Retrieved December 21, 2022.
  111. ^ Stabley, Susan (February 7, 2013). "Skye Condominiums developer plans countersuit over loan commission claim". Charlotte Business Journal. Retrieved January 9, 2024.
  112. ^ "SKYE Condominiums". Skyscraper Source Media. Retrieved July 15, 2017.
  113. ^ "110 East". Emporis. Archived from the original on May 28, 2022. Retrieved April 26, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  114. ^ a b Fahey, Ashley. "RENDERINGS: Here's what South End's next office tower will look like". Charlotte Business Journal. Retrieved March 3, 2020.
  115. ^ Rago, Gordon (January 18, 2022). "23-story, $186 million tower to break ground later this month in booming South End". Charlotte Observer. Retrieved January 18, 2022.
  116. ^ Franco, Elise (June 25, 2024). "What JLL, CBRE and Cushman & Wakefield are seeing in office leasing". Charlotte Business Journal. Retrieved June 25, 2024.
  117. ^ a b "101 Independence Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  118. ^ "Sunday Morning Saga: Death On the Square", The Charlotte Observer, September 28, 1981.
  119. ^ Boye, Will (March 4, 2015). "Office tower in uptown Charlotte sells for $108 million". Charlotte Business Journal. Retrieved June 5, 2021.
  120. ^ Boye, Will (August 7, 2015). "Bank of America to vacate floors at uptown office building, creating big block for new owner". Charlotte Business Journal. Retrieved June 5, 2021.
  121. ^ "101 Independence Center". Skyscraper Source Media. Retrieved July 15, 2017.
  122. ^ a b "BB&T Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  123. ^ "Southern National Bank May Build Instead of Remodel", The Charlotte Observer, December 4, 1970.
  124. ^ Hudon, Caroline (November 15, 2021). "Truist Financial to relocate uptown branch next year, add another locally". Charlotte Business Journal. Retrieved September 30, 2022.
  125. ^ "BB&T Building". Skyscraper Source Media. Retrieved July 15, 2017.
  126. ^ "AC Hotel/Residence Inn Charlotte City Center". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  127. ^ a b c d e f g h i j Shapiro, Amy (January 20, 2023). "Charlotte's largest hotels". Charlotte Business Journal. Retrieved July 12, 2023.
  128. ^ "AC Hotel/Residence Inn Charlotte EpiCentre". Emporis. Archived from the original on February 24, 2018. Retrieved July 17, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  129. ^ a b c "200 South Tryon Street". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  130. ^ "200 South Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
  131. ^ "The Westin Charlotte". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  132. ^ a b "NASCAR Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
  133. ^ "NASCAR Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
  134. ^ "Hilton Charlotte Center City". Emporis. Archived from the original on June 30, 2021. Retrieved October 7, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  135. ^ "Hilton Charlotte & Towers". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  136. ^ "The Hilton Charlotte Center City". Skyscraper Source Media. Retrieved July 16, 2017.
  137. ^ "Two Legacy Union". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  138. ^ Fahey, Ashley (December 10, 2020). "Developers, contractors get creative on Covid-19 challenges for construction". Charlotte Business Journal. Retrieved May 27, 2021.
  139. ^ a b c "112 Tryon Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  140. ^ "112 Tryon Plaza". Skyscraper Source Media. Retrieved July 16, 2017.
  141. ^ "JW Marriott Charlotte". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  142. ^ Thomas, Jennifer (July 26, 2021). "Luxury hotel JW Marriott set to open in uptown Charlotte". Charlotte Business Journal. Retrieved July 27, 2021.
  143. ^ "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  144. ^ Huguley, Collin (June 29, 2022). "Uptown Charlotte apartment complex fetches $165M in recent sale". Charlotte Business Journal. Retrieved October 16, 2022.
  145. ^ "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  146. ^ "SkyHouse Uptown North Tower". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  147. ^ a b Fahey, Ashley (June 19, 2017). "Grand opening for second SkyHouse tower set this week". Charlotte Business Journal. Retrieved October 16, 2022.
  148. ^ "SkyHouse Uptown North Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
  149. ^ "SkyHouse Uptown South Tower". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  150. ^ "SkyHouse Uptown South Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
  151. ^ "615 South College". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  152. ^ Fahey, Ashely (September 13, 2016). "Regions Bank to occupy 63,806 square feet at 615 South College". Charlotte Business Journal. Retrieved October 5, 2022.
  153. ^ Hudson, Caroline (June 30, 2019). "International financial group opens uptown office with plans to add 300 jobs". Charlotte Business Journal. Retrieved October 5, 2022.
  154. ^ Franco, Elise (September 13, 2023). "Chicago law firm Katten Muchin Rosenman to rightsize Charlotte office with uptown move". Charlotte Business Journal. Retrieved October 16, 2023.
  155. ^ "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  156. ^ "Working in The Round", The Charlotte Observer, March 3, 1982.
  157. ^ Van Hecke, MS (April 12, 1982). "Developer Delays Plans For Old Hotel". The Charlotte Observer.
  158. ^ "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  159. ^ "Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  160. ^ "Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. Retrieved July 17, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  161. ^ a b "129 West Trade Street". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  162. ^ "Le Meridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved October 7, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  163. ^ Thomas, Jennifer (November 10, 2022). "Behind the scenes of Le Méridien's multimillion-dollar transformation (PHOTOS)". Charlotte Business Journal. Retrieved January 5, 2015.
  164. ^ Boye, Will (November 10, 2022). "Charlotte's Blake Hotel to undergo $20M renovation, conversion". Charlotte Business Journal. Retrieved July 17, 2013.
  165. ^ "Le Méridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved July 17, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  166. ^ "The Blake Hotel". Skyscraper Source Media. Retrieved July 14, 2017.
  167. ^ "Crowne Plaza Executive Park". Emporis. Archived from the original on February 27, 2021. Retrieved May 5, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  168. ^ Fahey, Ashley (September 20, 2017). "Crowne Plaza Charlotte sells for $44M". Charlotte Business Journal. Retrieved May 5, 2022.
  169. ^ Thomas, Jennifer (November 11, 2014). "Here's a look at Crowne Plaza Charlotte's $10M renovation (PHOTOS)". Charlotte Business Journal.
  170. ^ "Hospitality Properties Trust Purchases 300-Room Hotel in Charlotte for $44M". Rebusiness Online. September 21, 2014.
  171. ^ "Novel Stonewall Station". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
  172. ^ Thomas, Jennifer (October 25, 2019). "Novel project put Stonewall in play — with more to come". Charlotte Business Journal. Retrieved October 16, 2022.
  173. ^ "Klimpton Hotel". Council on Tall Buildings and Urban Habitat. Retrieved January 10, 2023.
  174. ^ "Klimpton Hotel". The Skyscraper Center. CTBUH. Retrieved November 20, 2017.
  175. ^ "Kimpton Tryon Park". Emporis. Archived from the original on August 10, 2017. Retrieved November 20, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  176. ^ Portillo, Ely (June 13, 2017). "Charlotte's newest luxury hotel opens soon, with a new name". The Charlotte Observer. Retrieved November 20, 2017.
  177. ^ "The Ritz Carloton Charlotte". Emporis. Archived from the original on May 14, 2015. Retrieved February 23, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  178. ^ Rothacker, Rick (June 1, 2010). "Reflections of Grandeur". The Charlotte Observer.
  179. ^ Rothacker, Rick (June 21, 2007). "Ritz deal leaves hotel bill to BofA". The Charlotte Observer.
  180. ^ Rothacker, Rick (June 22, 2007). "BofA to pay hotel bill". The Charlotte Observer.
  181. ^ a b "Midtown Plaza". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
  182. ^ Fahey, Ashley (July 18, 2019). "Historic office building in uptown acquired by Boston investment firm". Charlotte Business Journal. Retrieved January 7, 2024.
  183. ^ Franco, Elise (December 11, 2024). "Redevelopment of historic uptown office building gets go-ahead". Charlotte Business Journal. Retrieved December 11, 2024.
  184. ^ "Uptown 550 on Stonewall". Council on Tall Buildings and Urban Habitat. Retrieved December 20, 2023.
  185. ^ "Finalist: Apartment or Condominium Development". Charlotte Business Journal. Retrieved October 16, 2022.
  186. ^ "Charlotte-Mecklenburg Government Center". Skyscraper Page. Retrieved December 9, 2023.
  187. ^ "Ally Center Charlotte". Emporis. Archived from the original on July 17, 2018. Retrieved February 23, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  188. ^ Boye, Will (October 14, 2009). "Charlotte office projects land tenants". Charlotte Business Journal. Retrieved January 1, 2024.
  189. ^ Hudson, Caroline (April 22, 2021). "ALLY'S BIG MOVE Fast-growing online bank joins major rivals on Tryon Street with opening of new hub". Charlotte Business Journal.
  190. ^ "Towerview at Ballantyne". Emporis. Archived from the original on November 21, 2021. Retrieved February 23, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  191. ^ Fahey, Ashley (October 1, 2019). "FIRST LOOK: Northwood Ravin's first Ballantyne Corporate Park apartments to include 16-story tower". Charlotte Business Journal. Retrieved October 15, 2022.
  192. ^ "The Line". Emporis. Archived from the original on July 20, 2021. Retrieved March 9, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  193. ^ Portillo, Ely (March 6, 2018). "Creative office building near prominent South End brewery goes on sale". Charlotte Observer. Retrieved December 8, 2020.
  194. ^ Franco, Elise (April 22, 2022). "Foundry Commercial relocating its Charlotte office from uptown to new South End tower". Charlotte Business Journal. Retrieved April 26, 2022.
  195. ^ "Capitol Towers North". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  196. ^ a b Boye, Will (December 19, 2014). "Lincoln Harris expects Capitol Towers building to deliver in July". Charlotte Business Journal.
  197. ^ a b last=Frazier |first=Eric|title="Construction starts on SouthPark office towers", The Charlotte Observer, May 30, 2014.
  198. ^ "Capitol Towers South". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  199. ^ a b "Queensbridge Collective". Council on Tall Buildings and Urban Habitat. Retrieved June 14, 2024.
  200. ^ a b Wilson, Jen (July 29, 2024). "Local coffee company becomes first retail tenant named for Queensbridge Collective". Charlotte Business Journal. Retrieved July 29, 2024.
  201. ^ a b Huguley, Colin (March 10, 2022). "RENDERINGS: Developer reveals new details about massive project on edge of uptown and South End". Charlotte Business Journal. Retrieved September 13, 2022.
  202. ^ a b c d Soloff, Katie Peralta (December 21, 2022). "The most anticipated Charlotte developments set to break ground in 2023". Axios Charlotte. Retrieved December 21, 2022.
  203. ^ Franco, Elise (November 17, 2023). "Woodfield Development delivers apartments at Farmington project near Harrisburg". Charlotte Business Journal. Retrieved November 17, 2023.
  204. ^ a b c d e f Sealey, Clayton (February 9, 2022). "Special report: South End's booming skyline". Charlotte Ledger. Retrieved January 2, 2023.
  205. ^ Thomas, Jennifer (October 18, 2023). "Historic Leeper-Wyatt building set for Dilworth move, eyed as sister restaurant to Leluia Hall". Charlotte Business Journal. Retrieved October 18, 2023.
  206. ^ Jordan, Chase (October 18, 2023). "Charlotte historic site dodges wrecking ball as city approves rescue plans for landmark". Charlotte Observer. Retrieved October 18, 2023.
  207. ^ Thomas, Jennifer (January 18, 2024). "What's next as Tyber Creek Pub gears up for final St. Patrick's Day at South End home". Charlotte Business Journal. Retrieved January 18, 2024.
  208. ^ a b c Soloff, Katie Peralta (December 10, 2023). "High-end apartment tower breaks ground soon in midtown". Axios Charlotte. Retrieved December 10, 2023.
  209. ^ Franco, Elise (October 5, 2023). "Northwood Ravin filings show work starting on an apartment tower in Charlotte's midtown neighborhood". Charlotte Business Journal. Retrieved October 5, 2023.
  210. ^ Wilson, Jen (April 19, 2021). "CBJ Morning Buzz: Midtown multifamily tower among projects on city's agenda; Pipeline company again underestimates gas spill in region". Charlotte Business Journal. Retrieved October 5, 2023.
  211. ^ "Radius Dilworth". Emporis. Archived from the original on May 17, 2022. Retrieved April 25, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  212. ^ a b Chemtob, Danielle. "A 26-story apartment tower is planned near Dilworth. Here's what it will include". Charlotte Observer. Retrieved May 18, 2021.
  213. ^ Franco, Elise (November 18, 2024). "Major Dilworth development hits milestone; tower project up next". Charlotte Business Journal. Retrieved November 18, 2024.
  214. ^ Peralta, Katie; Mahoney, Ashley. "26-story tower with skyline views breaks ground soon in Dilworth". Axios Charlotte. Retrieved September 24, 2021.
  215. ^ Franco, Elise (May 17, 2022). "Spandrel Development breaks ground on $235M Radius Dilworth project with apartments, retail". Charlotte Business Journal. Retrieved May 18, 2022.
  216. ^ a b Rago, Gordon (May 18, 2022). "See renderings of the Bowl at Ballantyne, a 20-acre project bringing a 'main street' feel". Charlotte Observer. Retrieved May 19, 2022.
  217. ^ "Construction Timeline". Ballantyne Reimagined. Retrieved August 7, 2023.
  218. ^ Franco, Elise (March 22, 2024). "Northwood reaches construction milestone on 26-story Ballantyne apartment tower". Charlotte Business Journal. Retrieved March 22, 2024.
  219. ^ Huguley, Collin (May 17, 2022). "RENDERINGS: Northwood Investors gives new peek at OMB-anchored The Bowl at Ballantyne". Charlotte Business Journal. Retrieved August 7, 2023.
  220. ^ "600 South Tryon". Emporis. Archived from the original on July 13, 2022. Retrieved July 13, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  221. ^ a b c d Rago, Gordon (July 12, 2022). "First look at latest addition to Charlotte skyline, a 24-story uptown office tower". Charlotte Observer. Retrieved July 12, 2022.
  222. ^ Franco, Elise (June 20, 2024). "What's next for Lincoln as latest Legacy Union office development wraps?". Charlotte Business Journal. Retrieved June 20, 2024.
  223. ^ "New uptown office tower signs law firm as first tenant". WSOC-TV. May 10, 2022.
  224. ^ Thomas, Jennifer (May 5, 2022). "WRobinson Bradshaw signs lease to anchor new Legacy Union tower". Charlotte Business Journal. Retrieved May 12, 2022.
  225. ^ "2161 Hawkins Street". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  226. ^ Fahey, Ashley (May 18, 2021). "Portman Residential planning high-rise apartment tower at South End site near the Rail Trail". Charlotte Business Journal. Retrieved May 18, 2021.
  227. ^ a b Franco, Elise (September 8, 2022). "Portman to start construction next month on South End apartment tower". Charlotte Business Journal. Retrieved September 8, 2022.
  228. ^ Franco, Elise (December 21, 2022). "Portman Holdings' apartment project at old Sycamore Brewing site to go vertical in early 2023". Charlotte Business Journal. Retrieved December 21, 2022.
  229. ^ Franco, Elise (December 21, 2022). "Portman Holdings' apartment tower in South End hits construction milestone". Charlotte Business Journal. Retrieved December 21, 2022.
  230. ^ a b Hudson, Caroline; O'Connell, Liz (August 24, 2021). "Atrium Health, development firm outline plans for future innovation district at med school site". Charlotte Business Journal. Retrieved October 16, 2022.
  231. ^ a b Franco, Elise (May 28, 2024). "Atrium Health's innovation district, medical school in Charlotte is 'on time and on track'". Charlotte Business Journal. Retrieved June 14, 2024.
  232. ^ Franco, Elise (June 14, 2024). "MIDTOWN'S FUTURE SHAPING UP". Charlotte Business Journal. Retrieved June 14, 2024.
  233. ^ Wilson, Jen (December 14, 2021). "Howard Levine Foundation donates $25M to support Atrium's innovation district building". Charlotte Business Journal. Retrieved October 16, 2022.
  234. ^ Franco, Elise (January 17, 2023). "Medical school, innovation district break ground in midtown Charlotte (PHOTOS)". Charlotte Business Journal. Retrieved January 17, 2023.
  235. ^ "Mint & Morehead". Emporis. Archived from the original on May 23, 2022. Retrieved May 17, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  236. ^ a b Franco, Elise (April 21, 2022). "UPDATE: Texas developer bringing multifamily tower to high-profile site near Bank of America Stadium (RENDERINGS)". Charlotte Business Journal. Retrieved May 3, 2022.
  237. ^ "GUIDE: The Growing Skyline in Charlotte's South End". Charlotte Magazine. November 26, 2019. Retrieved February 23, 2020.
  238. ^ "How Shorenstein is mapping out its $500M real estate pipeline in Charlotte". Charlotte Business Journal. bizjournals. Retrieved February 7, 2020.
  239. ^ Soloff, Katie Peralta (December 21, 2022). "The most anticipated Charlotte developments set to break ground in 2023". Axios Charlotte. Retrieved January 3, 2023.
  240. ^ Franco, Elise (May 25, 2023). "Riverside's Queensbridge Collective development to be 'another jewel' in Charlotte's crown (PHOTOS)". Charlotte Business Journal. Retrieved June 14, 2024.
  241. ^ Soloff, Katie Peralta (June 25, 2023). "Axios Charlotte Newsletter June 25, 2023". Axios Charlotte. Retrieved June 25, 2023.
  242. ^ "Carson South End". Emporis. Archived from the original on May 14, 2022. Retrieved April 26, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  243. ^ a b c d Rago, Gordon. "Charlotte skyline to change again with a 31-story, $600 million tower in South End". Charlotte Observer. McClatchy. Retrieved February 23, 2022.
  244. ^ a b Franco, Elise (November 28, 2022). "Crescent Communities, Nuveen Real Estate release new details on Carson & Tryon project in South End". Charlotte Business Journal. Retrieved November 28, 2022.
  245. ^ a b "Carson & Tryon". Crescent Communities. Retrieved November 4, 2022.
  246. ^ a b Soloff, Katie Peralta (February 26, 2022). "Enterprise site development aims to connect South End with Uptown". Axios Charlotte. Axios. Retrieved February 28, 2022.
  247. ^ a b Franco, Elise (June 22, 2022). "The Spectrum Cos. to manage leasing of planned South End development". Charlotte Business Journal. Retrieved November 1, 2022.
  248. ^ Franco, Elise (October 21, 2024). "Crescent Communities files permits for long-awaited South End office development". Charlotte Business Journal. Retrieved October 21, 2024.
  249. ^ Franco, Elise (October 21, 2024). "Law firm Moore & Van Allen to leave uptown, anchor major South End development". Charlotte Business Journal. Retrieved October 21, 2024.
  250. ^ a b O'Connell, Liz. "Joint venture plans South End office tower to start construction in 2023". Charlotte Business Journal. bizjournals. Retrieved February 3, 2022.
  251. ^ a b Franco, Elise (October 19, 2022). "VeLa Development Partners lays out plans for $170M apartment tower uptown". Charlotte Business Journal. bizjournals. Retrieved October 19, 2022.
  252. ^ Sands, Alexandria (December 16, 2024). "8 most anticipated Charlotte developments of 2025". Axios Charlotte. Retrieved December 17, 2024.
  253. ^ a b Soloff, Katie Peralta (December 19, 2023). "Most anticipated developments set to break ground in Charlotte in 2024". Axios Charlotte. Retrieved December 19, 2023.
  254. ^ a b c d e Franco, Elise (January 26, 2023). "Atlanta-based Cousins Properties to develop South End office tower at site of parking lot". Charlotte Business Journal. Retrieved January 26, 2023.
  255. ^ a b c d e Fahey, Ashley (December 2, 2020). "RailYard acquisition shatters office market record in $201M buy". Charlotte Business Journal. Retrieved January 26, 2023.
  256. ^ Fahey, Ashley (June 15, 2021). "Stream Realty Partners, The Durban Group plan mixed-use tower adjacent to The Suffolk Punch in South End". Charlotte Business Journal. Retrieved June 15, 2021.
  257. ^ Lu, Yiwen (June 16, 2021). "New mixed-use tower planned next to popular South End brewery. Here's what we know". Charlotte Observer. Retrieved June 16, 2021.
  258. ^ "Development Report Center City Charlotte" (PDF). Center City Partners. August 1, 2022. Retrieved October 21, 2022.
  259. ^ Huguley, Colin (November 16, 2021). "Catalyst Capital Partners, Stiles to develop mixed-use tower in South End". Charlotte Business Journal. Retrieved November 16, 2021.
  260. ^ Rago, Gordon. "Price's Chicken Coop land sold for close to $4M. Here's what's next for the site". Charlotte Observer. McClatchy. Retrieved September 2, 2022.
  261. ^ a b c Spanberg, Erik (June 8, 2023). "Australian developer Salter Brothers puts stalled InterContinental Hotel plan back in motion, eyes mid-2026 opening". Charlotte Business Journal. Retrieved June 8, 2023.
  262. ^ Thomas, Jason (December 7, 2017). "2 new luxury hotels set to begin construction". Agenda. Charlotte Agenda. Retrieved December 12, 2017.
  263. ^ Spanberg, Erik. "Construction of InterContinental Hotel atop historic theater in uptown on hold". Charlotte Business Journal. bizjournals. Retrieved April 25, 2021.
  264. ^ Soloff, Katie Peralta (March 13, 2021). "Charlotte hotels could be in trouble". Axios Charlotte. Retrieved July 6, 2021.
  265. ^ a b Franco, Elise (January 30, 2023). "Akridge, Kettler to add 865 apartments in South End". Charlotte Business Journal. Retrieved January 30, 2023.
  266. ^ a b "1427 SOUTH BLVD". Akridge. Retrieved October 11, 2023.
  267. ^ a b c d Franco, Elise (October 12, 2022). "Brooklyn Village mixed-use project is on track to break ground in early 2023". Charlotte Business Journal. Retrieved October 19, 2022.
  268. ^ a b Franco, Elise (July 31, 2023). "BK Partners to start construction on Brooklyn Village redevelopment this fall". Charlotte Business Journal. Retrieved August 1, 2023.
  269. ^ a b Bergeron, Josh (September 6, 2023). "Brooklyn Village project will demolish first-of-its-kind Black-developed building". Charlotte Observer. Retrieved September 6, 2023.
  270. ^ "Phillips Place Office Tower". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.{{cite web}}: CS1 maint: unfit URL (link)
  271. ^ France, Elise. "Charlotte City Council approves rezoning for 10-story office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
  272. ^ France, Elise. "Charlotte City Council approves rezoning for 10-story office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
  273. ^ Fahey, Ashley. "Lincoln Harris files plans for new office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
  274. ^ Fahey, Ashley. "Site plan filed for new office tower at SouthPark's Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
  275. ^ Wilson, Jen. "CBJ Morning Buzz: Developer's vision includes tallest building in SouthPark; Construction academy to launch here amid national expansion". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
  276. ^ Muccigrosso, Catherine (October 15, 2022). "Regal closing south Charlotte movie theater as parent company confronts bankruptcy". Charlotte Observer. Retrieved October 19, 2022.
  277. ^ Banks, Lindsey (March 1, 2023). "With movie theater demolished, center adds high-end stores and upscale restaurants; how does P.F. Chang's fit in?". Charlotte Ledger. Retrieved March 1, 2023.
  278. ^ a b c d Franco, Elise (June 1, 2023). "Atlanta-based Cousins targets South End site it owns for high-rise office tower, apartment building". Charlotte Business Journal. Retrieved June 1, 2023.
  279. ^ a b c d Rago, Gordon (May 26, 2023). "First look at latest towers coming to South End, planned for near Common Market". Charlotte Observer. Retrieved May 26, 2023.
  280. ^ a b Purtell, David (May 10, 2022). "Highwoods Properties plots $230M expansion in Charlotte with deals for Legacy Union tower, South End site". Charlotte Business Journal. Retrieved August 28, 2023.
  281. ^ a b Franco, Elise (March 19, 2024). "Charlotte developer Pappas Properties wins nod for final phase of major midtown project". Charlotte Business Journal. Retrieved March 19, 2024.
edit