Line 3 of the Nanning Metro is a rapid transit line in Nanning. The line opened on 6 June 2019. The line is 27.9 km long with 23 stations.
Line 3 | |
---|---|
3 | |
Overview | |
Status | Operational |
Owner | Nanning |
Locale | Nanning, Guangxi, China |
Termini | |
Stations | 23 |
Service | |
Type | Rapid transit |
System | Nanning Metro |
Services | 1 |
Operator(s) | Nanning Rail Transit Corporation |
Rolling stock | 6-car Type B |
History | |
Opened | June 6, 2019 |
Technical | |
Line length | 27.9 km (17.34 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 | |||||||
---|---|---|---|---|---|---|---|
Chinese name | |||||||
Simplified Chinese | 南宁地铁3号线 | ||||||
Traditional Chinese | 南寧地鐵3號線 | ||||||
| |||||||
Zhuang name | |||||||
Zhuang | Nanzningz Didez 3 Hauhsienq |
Opening timeline
editSegment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Keyuan Dadao — Pingliang Overpass | 6 June 2019 | 27.9 km (17.34 mi)[1] | 22 | |
Donggouling | 10 September 2020[2] | Infill station | 1 |
Stations
editStation name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | Zhuang | ||||
Keyuan Dadao | 科园大道 | Daihloh Gohyenz | Xixiangtang | |||
Chuangye Lu | 创业路 | Roen Cangyez | ||||
Anji Coach Station | 安吉客运站 | Camh Yinhhek Anhgiz | 2 | |||
Beihubei Lu | 北湖北路 | Roen Baek Bwzhuz | ||||
Xiufeng Lu | 秀峰路 | Roen Siufungh | ||||
Yongwu Lu | 邕武路 | Roen Yunghvuj | Xixiangtang / Xingning | |||
Dajicun | 大鸡村 | Dagihcunh | Xingning | |||
Xinggui Lu | 兴桂路 | Roen Hinghgvei | ||||
Xiaojicun | 小鸡村 | Siujgihcunh | 5 | |||
Donggouling | 东沟岭 | Dungruhlingj | ||||
Changgang Lu | 长堽路 | Roen Cangzgangh | ||||
Dongge Lu | 东葛路 | Roen Dunghgoz | Qingxiu | |||
Binhu Lu | 滨湖路 | Roen Binhhuz | ||||
Jinhu Square | 金湖广场 | Ginhhuz Gvangjcangz | 1 | |||
Langxi | 埌西 | Langsih | ||||
Qingzhu Overpass | 青竹立交 | Cinghcuz Lizgyauh | ||||
Qingxiushan | 青秀山 | Cinghsiusanh | ||||
Nanning Museum | 市博物馆 | Si Bozvuzgvanj | Liangqing | |||
Advanced Business Park | 总部基地 | Cungjbu Gihdi | 4 | |||
Guangxi Planning Exhibition Hall | 广西规划馆 | Gvangjsih Gveihva’gvanj | ||||
Qingge Lu | 庆歌路 | Roen Ginggoh | ||||
Wuxianghu | 五象湖 | Vujsienghuz | ||||
Pingliang Overpass | 平良立交 | Bingzliengz Lizgyauh | 2 | |||
References
edit- ^ a b "南宁地铁3号线6月6日开通试运营!看站点、换乘、票价". 2019-06-03.
- ^ "9月10日起,南宁地铁3号线东沟岭站正式开通运营". 2020-09-09.