Kandivli West metro station

Kandivali West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Kandivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2][3]


Kandivali West
Mumbai Metro station
General information
LocationKandivali, Siddhivinayak Nagar, Kandivali West, Mumbai, Maharashtra 400067
Coordinates19°12′51″N 72°50′14″E / 19.21413°N 72.83735°E / 19.21413; 72.83735
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 2A
Platforms2 (2 side platform)
Tracks2
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened2 April 2022; 2 years ago (2022-04-02)
Services
Preceding station Logo of the Delhi Metro Mumbai Metro Following station
Pahadi Eksar
towards Dahisar East
Line 2A Dahanukarwadi
towards Andheri West
Location
Map

History

edit

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[4] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[5]

Kandivali West was opened to the public on 2 April 2022, along with the first phase of Line 2A.[6]

Station layout

edit
G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform 2
Southbound
Towards → Andheri West next station is Dahanukarwadi
Platform 1
Northbound
Towards ← Dahisar East next station is Pahadi Eksar
Side platform | Doors will open on the left  
L2

Power and signaling system

edit

Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

See also

edit

Charkop

Mahavir Nagar

Kandivali

Kandivali Railway Station

References

edit
  1. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  3. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  4. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  5. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  6. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.