The Kambar-Ata-2 Hydro Power Plant (Kyrgyz: Камбар-Ата-2 ГЭСи, Russian: Камбаратинская ГЭС-2) is a hydroelectric power station on the river Naryn near Kara-Jygach, Toktogul District, Kyrgyzstan.[1][2] When completed, it will have 3 individual Francis turbine-generators with a nominal output of around 120 MW each, with a combined generation capacity of 360 MW electricity. The first generator was operational on November 27, 2010.[2] The power plant's dam is 60 m (197 ft) tall and it creates a 70,000,000 m3 (56,750 acre⋅ft) reservoir of which 8,000,000 m3 (6,486 acre⋅ft) is active (or useful) for power generation.[3]

Kambar-Ata-2
One of the power plant's Francis turbines
Map
Official nameКамбаратинская ГЭС -2
Country
LocationKara-Jygach
Coordinates41°46′26″N 73°19′52″E / 41.77389°N 73.33111°E / 41.77389; 73.33111
StatusOperational
Construction began1970-1990. 2007-2010
Commission dateAugust 30, 2010
Thermal power station
Primary fuelHydropower
Power generation
Units operational1 x 120 MW Francis-type
Nameplate capacity120 MW

References

edit
  1. ^ "Kambar-Ata-2 hydropower plant produces 19 million kWh of power since launch". AKIpress News Agency (Kyrgyzstan). 11 January 2011. Archived from the original on 12 July 2011. Retrieved 21 January 2011.
  2. ^ a b "Kambar-Ata-2 HPP" (in Russian). Energo-ES. Retrieved 14 January 2022.
  3. ^ "List of major hydroelectric facilities Kyrgyzskoy Republic" (PDF) (in Russian). CA Water. Retrieved 24 February 2012.