Expedition 48 was the 48th expedition to the International Space Station.

Expedition 48
Promotional Poster
Mission typeLong-duration expedition
Expedition
Space stationInternational Space Station
Began18 June 2016 05:52 UTC[1]
Ended6 September 2016 (2016-09-07Z) UTC
Arrived aboardSoyuz TMA-20M
Soyuz MS-01
Departed aboardSoyuz TMA-20M
Soyuz MS-01
Crew
Crew size6
MembersExpedition 47/48:
Aleksey Ovchinin
Oleg Skripochka
Jeffrey Williams
Expedition 48/49:
Kathleen Rubins
Anatoli Ivanishin
Takuya Onishi

Expedition 48 mission patch

(l-r) Skripochka, Williams, Ovchinin, Onishi, Ivanishin, Rubins
Sunrise panorama taken by Jeff Williams during Expedition 48.

Jeffrey Williams, Aleksey Ovchinin and Oleg Skripochka transferred from Expedition 47. Expedition 48 began upon the departure of Soyuz TMA-19M in 18 June 2016[1] and concluded upon the departure of Soyuz TMA-20M on September 6, 2016. The crew of Soyuz MS-01 were transferred to Expedition 49.[2][3][4]

Crew

edit
Position First Part
(June 2016)
Second Part
(July 2016 to September 2016)[5]
Commander   Jeffrey Williams, NASA
Fourth spaceflight
Flight Engineer 1   Aleksey Ovchinin, RSA
First spaceflight
Flight Engineer 2   Oleg Skripochka, RSA
Second spaceflight
Flight Engineer 4   Anatoli Ivanishin, RSA
Second Spaceflight
Flight Engineer 5   Takuya Onishi, JAXA
First Spaceflight
Flight Engineer 6   Kathleen Rubins, NASA
First spaceflight

EVA performed

edit
Spacewalkers Start (UTC) End (UTC) Duration
1.   Jeff Williams
  Kate Rubins
August 19, 2016
13:04
August 19, 2016
19:02
5 hours 58 minutes
Installation of the International Docking Adapter (IDA) on Pressurized Mating Adapter-2 and installation of cables for the next IDA[6]
2.   Jeff Williams
  Kate Rubins
September 1, 2016
11:53
September 1, 2016
17:41
6 hours 48 minutes
The main objective of this EVA was to retract a thermal radiator on the Integrated Truss Structure segment P1. This radiator was supposed to be retracted during Expedition 45's EVA 2 (November 6, 2015) but was not completed. The radiator had been deployed on Expedition 33's EVA 1 (November 1, 2012) in an attempt to isolate a coolant leak. Additional completed tasks included installing HD video cameras on the port/outboard side of the station (one zenith, one nadir), applying additional torque to SARJ bolts, photographing the inside of the SARJ, tying back a protective blanket covering hardware which will be robotically manipulate later, and tying back Crew and Equipment Translation Aid (CETA) Cart brake handles to keep them out of the SARJ rotation envelope.[7][8][9]

References

edit
  1. ^ a b "Soyuz TMA-19M lands from space station with Russian, American and Brit". 18 June 2016.
  2. ^ "Upcoming ISS expeditions". Spacefacts. Retrieved 13 March 2014.
  3. ^ "International Space Station Crew Assignments". Spaceflight101. Retrieved 13 March 2014.
  4. ^ "NASA, International Space Station Partners Announce Future Crew Members". RedOrbit. 11 February 2014. Archived from the original on 10 February 2015. Retrieved 13 March 2014.
  5. ^ "Launch of new series manned spacecraft rescheduled due to risk of docking disruption". TASS news agency. 6 June 2016.
  6. ^ "Spacewalkers being work to install commercial crew port". www.nasa.gov.
  7. ^ "ISS Spacewalkers to retract Thermal Radiator, Install HD Video Camera". spaceflight101.com/.
  8. ^ "EVA-37 installs first external HD cameras and conducts TTCR retract task | NASASpaceFlight.com". www.nasaspaceflight.com. September 2016. Retrieved 2016-10-19.
  9. ^ Julian Danzer (2016-08-24), ISS U.S. Spacewalk #37 Expedition 48 NASA TV Preview Briefing, retrieved 2016-10-19
edit