Excellence-class cruise ship

The Excellence class,[1][2][3] including the sub-classes Helios class[4] and XL or Excel class,[5] is a class of cruise ships ordered by Carnival Corporation & plc for its subsidiary brands AIDA Cruises, Costa Cruises, P&O Cruises and Carnival Cruise Line. The ships are being constructed by Meyer Werft at their shipyard in Papenburg, Germany, and Meyer Turku at their shipyard in Turku, Finland. The first, AIDAnova, entered service for AIDA Cruises in 2018.

AIDAnova, the first ship in the class, in 2018
Class overview
Builders
Operators
Preceded by
Built2017–2023
In service2018–present
Planned11
Building0
Completed9
Active9
General characteristics
TypeCruise ship
Tonnage183,900 GT
Displacement80,000
Length1,115 ft (340 m)
Height69.3 m (227 ft 4 in)-72 m (236 ft)
Installed power4x MaK 16VM46DF, 57.2 MW total
PropulsionTwo ABB azimuth thrusters, 37 MW total

History

edit

In March 2015, Carnival Corporation entered into a strategic partnership with Meyer Werft to build new ships between 2018 and 2022.[6] In June 2015, four ships were ordered for delivery between 2019 and 2020.[7][8] In September 2016, three more ships were ordered for Carnival Cruise Line and P&O Cruises for delivery in 2020 and 2022. [9] In February 2024, Carnival Cruise Line placed an order for another Excellence class ship for delivery in 2027.

The Excellence class are the first cruise ships in the world to be dual fueled by liquefied natural gas (LNG) and traditional fuel oil, which is intended to make them more environmentally friendly than traditional, diesel-powered ships.[8] Each ship is expected to cost $950 million.[10]

The first four ships in the class suffered delivery delays. The delays of AIDAnova, Costa Smeralda and Mardi Gras were attributed to the ships being the first to be fueled by LNG, design complexities, difficulties coordinating subcontractors, and the large size of the ships.[3] The delay of Iona was due to a temporary suspension of operations by P&O Cruises, and slower construction progress, in response to the COVID-19 pandemic.[11] Mardi Gras was later delayed until 2021, also due to the pandemic.[12]

Ships

edit
Ship Subclass Built Operator Builder Gross tonnage Flag IMO number Notes Image Newbuilding no.
AIDAnova Helios class[13] 2018 AIDA Cruises Meyer Werft 183,858[14]   Italy 9781865 World's first LNG-powered cruise ship.[15]   S.696
Costa Smeralda 2019 Costa Cruises Meyer Turku 185,010[16]   Italy 9781889   NB 1394
Iona Excel class[5] 2020 P&O Cruises Meyer Werft 184,089[17]   United Kingdom 9826548   S.710
Mardi Gras Excel class[18] 2020 Carnival Cruise Line Meyer Turku 180,800[19]   Bahamas 9837444   NB 1396
AIDAcosma Helios class[13] 2021 AIDA Cruises Meyer Werft 183,900[10]   Italy 9781877 Originally planned for 2020.   S.709
Costa Toscana 2021 Costa Cruises Meyer Turku 186,364[10]   Italy 9781891 Originally planned for 2020.   NB 1395
Carnival Celebration[20] Excel class[18] 2022 Carnival Cruise Line Meyer Turku 183,521[21]   Bahamas 9837456 Construction started on January 13, 2021.[22]   NB 1397
Arvia[23] Excel class[5] 2022 P&O Cruises Meyer Werft 185,581[24]   United Kingdom 9849693 Construction started on February 22, 2021.[25]   S.716
Carnival Jubilee[26] Excel class 2023 Carnival Cruise Line Meyer Werft 183,521[27]   Bahamas 9851737 Originally ordered for AIDA Cruises.[28] Construction started on March 18, 2022.[29]   S.717[30]
TBA Excel class 2027 Carnival Cruise Line Meyer Werft 180,000 Order announced February 13, 2024.[31]
first order by the Carnival Corporation after five years[32]
TBA Excel class 2028 Carnival Cruise Line Meyer Werft 180,000 Order announced March 26, 2024.[33]
Hermes cover underway[34][35]

References

edit
  1. ^ "Carnival not occupied with building world's largest cruise ship". April 17, 2018. Retrieved January 11, 2020.
  2. ^ "Steel cut for Carnival Cruise Line's first Excellence-class ship". November 15, 2018. Retrieved May 29, 2019.
  3. ^ a b "Mardi Gras delays not surprising but still costly for Carnival". January 5, 2020. Retrieved January 6, 2020.
  4. ^ "AIDAnova". www.meyerwerft.de. Retrieved May 3, 2019.
  5. ^ a b c "P&O Cruises and Cunard make 2022 single use plastics commitment". Retrieved May 26, 2019.
  6. ^ "Carnival Corporation Enters into Strategic Partnerships to Add Nine Cruise Ships to its Fleet over a Four-Year Period Starting in 2019". March 24, 2015. Retrieved January 2, 2017.
  7. ^ "Carnival Corporation orders two cruise ships from Meyer Turku". June 15, 2015. Archived from the original on September 25, 2019. Retrieved January 2, 2017.
  8. ^ a b "Carnival Corporation Finalizes Contract with Meyer Werft to Build Four Next-Generation Cruise Ships". June 15, 2015. Retrieved January 2, 2017.
  9. ^ "Carnival Corporation to Build Three New LNG-Powered Cruise Ships with Meyer Werft and Meyer Turku". September 6, 2016. Retrieved January 2, 2017.
  10. ^ a b c "Cruise ship ordeerbook". 6 January 2011. Retrieved February 25, 2017.
  11. ^ Spencer, Kerry (March 30, 2020). "P&O Cruises Reveals Maiden Voyage of New Ship Iona Will be Delayed". Cruise Critic. Archived from the original on January 16, 2023. Retrieved March 31, 2020.
  12. ^ Limone, Jerry (July 7, 2020). "Another delay for Carnival's Mardi Gras ship". Travel Weekly. Retrieved July 7, 2020.
  13. ^ a b "AIDA orders third Helios-class cruise ship". 28 February 2018. Retrieved May 30, 2019.
  14. ^ "AIDAnova (9781865)". LeonardoInfo. Registro Italiano Navale. Retrieved January 11, 2020.
  15. ^ "AIDAnova, World's 1st LNG Cruise Ship, Delivered". World Maritime News. December 12, 2018. Retrieved September 10, 2019.
  16. ^ "Costa Smeralda (9781889)". LeonardoInfo. Registro Italiano Navale. Retrieved January 11, 2020.
  17. ^ "MS Iona (9826548)". LeonardoInfo. Registro Italiano Navale. Retrieved 2020-12-12.
  18. ^ a b "Carnival Cruise Line Names First XL-Class Ship Mardi Gras". 6 December 2018. Retrieved May 30, 2019.
  19. ^ "Carnival Mardi Gras (9837444)". LeonardoInfo. Registro Italiano Navale. Retrieved 18 December 2020.
  20. ^ Kalosh, Anne (August 21, 2020). "Carnival's 2022 Excel-class ship is named Carnival Celebration". Seatrade Cruise News. Retrieved August 21, 2020.
  21. ^ "Carnival XL Class 2 | MEYER WERFT | Delivery in 2022". Meyer Werft. Archived from the original on 22 February 2020. Retrieved 18 December 2020.
  22. ^ "Steel Cut for New Carnival Ship". Cruise Industry News. January 13, 2021. Retrieved April 22, 2022.
  23. ^ Coulter, Adam (18 February 2021). "P&O Cruises Reveals Name of New Ship, Arvia". Cruise Critic. Archived from the original on 8 March 2021. Retrieved 18 February 2021.
  24. ^ "Arvia". LR Class Direct. London: Lloyd's Register of Shipping. Retrieved 22 July 2023.
  25. ^ Coulter, Adam (February 22, 2021). "P&O Cruises Cuts Steel For New Cruise Ship, Arvia". Cruise Critic. Archived from the original on March 8, 2021. Retrieved February 23, 2021.
  26. ^ "Third LNG Carnival Vessel to Be Named Carnival Jubilee and Based in Texas". Cruise Hive. 2021-11-11. Retrieved 2021-11-11.
  27. ^ "Excel Class | Cruise Ship #3". Meyer Werft. Archived from the original on 22 February 2020. Retrieved 18 December 2020.
  28. ^ "Carnival Cruise Line To Grow Fleet By Two Additional Ships by 2023 – Carnival Cruise Line News". Carnival Cruise Lines. Retrieved 23 June 2021.
  29. ^ "Steel Cut for New Carnival Ship Jubilee". Cruise Industry News. March 18, 2022. Retrieved April 22, 2022.
  30. ^ Picture of the ship down the river Ems
  31. ^ "MEYER WERFT to build another cruise ship for Carnival Cruise Line". MEYER WERFT. Retrieved 2024-02-13.
  32. ^ "Carnival books new LNG-powered cruise ship at Meyer Werft". 14 February 2024.
  33. ^ plc, Carnival Corporation &. "Carnival Corporation Orders an Additional Excel-Class Ship for Carnival Cruise Line, the Line's 5th Excel-Class Ship and the 11th Across the Global Fleet". www.prnewswire.com (Press release). Retrieved 2024-03-26.
  34. ^ "Meyer Werft: Bürgschaft für AIDA-Eigentümer Carnival". 18 July 2024.
  35. ^ "Unterstützung für Meyer Werft - Bürgschaft für Reederei Carnival".
edit