Darbhanga Airport (IATA: DBR, ICAO: VEDH) is a domestic airport and an Indian Air Force Station, serving Darbhanga, Bihar, India. It is located just at the outskirts of the city near the NH-527B and NH-57 highways, which passes through Darbhanga. The airport is operated by the Airports Authority of India (AAI). The foundation stone for the airport was laid by the then Chief Minister of Bihar, Nitish Kumar, and the then Civil Aviation Minister, Suresh Prabhu, in the presence of the State Civil Aviation Minister, Jayant Sinha, on 24 December 2018.[5] After efforts taken by the then Civil Aviation Minister, Hardeep Singh Puri.[6] Commercial flights started on 8 November 2020.
Summary | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Airport type | Military/Public | ||||||||||
Owner | Indian Air Force | ||||||||||
Operator | Airports Authority of India | ||||||||||
Serves | Darbhanga | ||||||||||
Location | Darbhanga, Bihar, India | ||||||||||
Opened | 8 November 2020 | ||||||||||
Elevation AMSL | 171 ft / 52 m | ||||||||||
Coordinates | 26°11′41″N 085°55′03″E / 26.19472°N 85.91750°E | ||||||||||
Map | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (April 2023 - March 2024) | |||||||||||
| |||||||||||
History
editThis airport was built by Maharaja Kameshwar Singh Bahadur of Darbhanga when he started his own private airline. It was funded by a private aviation company Darbhanga Aviation after Second World War. He purchased three former military Douglas DC3 aircraft. Darbhanga Aviation was started in 1950 and became defunct in 1962.[7] During the 1962 Indo-China War, the airport was acquired by the Indian Air Force.[8]
Structure
editAirport Authority of India built an Interim Terminal Building, a taxi track, and the apron area. The runway was strengthened to handle the Airbus A320 and Boeing 737 and a pre-fabricated building was erected to serve as a temporary terminal building.[9] The government of India had sanctioned approximately ₹100 crores for these projects.[10] On 16 Feb 2021 one Apron of 167 mt X 62mt was made operational. This Apron can accommodate Two B737-800/A320 at a time making the landing of planes smoother. Earlier due to the lack of parking space, airplanes had to wait in the sky.[11] The terminal has six check-in counters, and a capacity to handle 200 peak hour passengers. A car parking facility has a capacity of 30 cars. [12]
UDAN Scheme
editIn January 2018, SpiceJet was selected to operate flights from Darbhanga to Delhi, Bengaluru and Mumbai, under the Government's Regional Connectivity Scheme called UDAN.[13][14]
Airlines and destinations
editAirlines | Destinations |
---|---|
IndiGo | Delhi,[15] Hyderabad, Kolkata,[16] Mumbai[15] |
SpiceJet[17] | Bangalore, Delhi, Mumbai |
Statistics
editGraphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
Passenger, Aircraft Movement, and Cargo at Darbhanga Airport (2021-2022)
Year | Passengers | Change | Aircraft Movement | Change | Cargo (MT) | Change | Ref |
---|---|---|---|---|---|---|---|
2021–22 | 619,948 | 4,350 | 96 | [18] |
Future
editThe Government of Bihar has the acquired additional 78 acres of the land and transferred to the Airports Authority of India (AAI), which has started the DPR process for the further expansion of the passenger terminal building at the airport.[19] The expansion plan is to develop a new passenger terminal, a new Air Traffic Control (ATC) tower, cargo facilities among other facilities close to NH-27 have been put forward by the AAI.[20] Darbhanga MP, Gopal Jee Thakur, met Jayant Sinha and later Prime Minister Narendra Modi, and demanded to name the airport as Mahakavi Kokil Vidyapati Airport.[21][22] This was also suggested by Jayant Sinha at the foundation stone laying ceremony for the construction of the current passenger terminal, by naming the airport after famous Maithili poet, Vidyapati.[5]
In March 2023, the Government of Bihar has acquired 24 acres of land for the runway expansion and another 54 acres for the construction of a new permanent terminal, while the remaining 24 acres for installation of Instrument Landing System (ILS) to facilitate night landing has been acquired, which was completed in mid-2023.[23][24][19]
In November 2023, the tenders were floated for Phase 1 of the new terminal of the airport by the AAI. The estimated cost was around ₹632 crore (US$76 million).[25] Then, bidding was opened and six firms bidded to build the terminal in February 2024, in which New Delhi-based Ahluwalia Contracts Pvt. Ltd. won the bid in the same month.[26][27] Therefore, work on the new terminal officially began after Prime Minister Narendra Modi laid the foundation stone on 20 October 2024. The cost of the terminal and adjoining developments has been revised to ₹912 crore (US$110 million), and the project has a deadline of completion by September 2026.[28]
New terminal
editThe new terminal building will act as a supersede to the airport and Darbhanga and its adjoining regions. It will be situated at the northern end of the airport, and will cover an area of 51,800 m2 (558,000 sq ft), a significant increase from the current terminal's 1,400 m2 (15,000 sq ft). The terminal will be developed in two phase as a two-storey building, of which the first floor will feature the departures area and the ground floor with the arrivals area, equipped with a wide range of facilities and amenities. It will have 40 check-in counters, 14 self-check-in kiosks, 12 automatic tray retrieval systems, 30 door- frame metal detector machines, four conveyor belts in the arrivals area and five aerobridges. As part of the first phase of the terminal, it will have an apron to accommodate seven widebody-type aircraft. With these considerable developments, the airport will be able to handle more than 8,000 flights per day from the present 1,500 and from 10 to over 50 aircraft operations everyday.
The new terminal will be designed to showcase traditional Madhubani paintings and draw architectural inspiration from the 19th-century Darbhanga Fort. Local artists will create artworks and sculptures for the waiting areas and the interior design will feature natural and earthy colour palettes. It will be a green and sustainable building, with electricity powered by solar energy, rainwater harvesting and water recycling systems, use of natural light over artificial LED lights, and will be advanced with technology to benefit all passengers like lifts, escalators, free WiFi, washrooms, sufficient seating areas, facilities for physically challenged persons like wheelchairs, medical and emergency facilities, firefighting services, tourist facilitation services like tourist information desks and vehicle parking areas outside the terminal, which will include a multi-level parking building on either sides of the approach roads connecting the terminal, among others.
Apart from the new terminal, the airport's development will facilitated with the extension of the runway from 2,743 m (9,000 ft) to 4,267 m (14,000 ft), signalling a major upgrade to handle widebody aircraft like the Airbus A380. Otherwise, a cargo complex, a fire station, a new ATC building and an admin block will surround the upcoming terminal. Additional land will be reserved on either sides of the terminal for its second phase of development, thereby bringing the ultimate area of the terminal exceeding 100,000 m2 (1,100,000 sq ft), with an apron suitable for 10 widebody-type aircraft. Construction on the terminal's first phase began from October 2024, and will be completed by September 2026.[28][29][27]
See also
editReferences
edit- ^ "Information Paper" (PDF). icao.int. Archived (PDF) from the original on 5 May 2022.
- ^ "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 22 April 2024.
- ^ "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 22 April 2024.
- ^ "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 22 April 2024.
- ^ a b "Foundation of civil enclave laid at Darbhanga airport". The Times of India. 25 December 2018. Retrieved 16 May 2020.
- ^ "Bookings for daily flights from Darbhanga to start by month end: Hardeep S Puri". pib.gov.in. Retrieved 1 March 2023.
- ^ "Darbhanga Aviation history from India, Rest of World". Airline History. Retrieved 31 August 2019.
- ^ "First President's royal flight in '62". The Times of India. 10 July 2008. Retrieved 16 May 2020.
- ^ "SpiceJet: Indigo and SpiceJet express interest in operating flights from Darbhanga | India News - Times of India". The Times of India. 17 January 2018. Archived from the original on 19 May 2018. Retrieved 19 January 2018.
- ^ "Flight operations from Darbhanga from mid-2019, AAI at work | Patna News - Times of India". The Times of India. 28 September 2018.
- ^ Airports Authority of India [@AAI_Official] (16 February 2021). "To strengthen airports ops and to accommodate two B737-800/A320 at a time, #AAI's Darbhanga @aaidarairport is ready with a new 167 mt X 62mt apron, with a connecting taxiway and connecting road. The new apron has put in use from today onwards. #ProvidingTheBest https://t.co/MoIT84NF8l" (Tweet). Archived from the original on 16 February 2021. Retrieved 14 June 2021 – via Twitter.
- ^ "Darbhanga airport: CM Nitish Kumar lays foundation for civil enclave". Hindustan Times. 25 December 2018. Retrieved 16 May 2020.
- ^ "SpiceJet to start operations on UDAN 2 routes from April-end". Financial Express. 8 March 2018. Retrieved 21 September 2020.
- ^ "Indigo and SpiceJet express interest in operating flights from Darbhanga". The Times of India. 17 January 2018. Archived from the original on 19 May 2018.
- ^ a b "दरभंगा एयरपोर्ट से 1 दिसंबर से शुरू होगी इंडिगो की फ्लाइट : संजय झा". Dainik Bhaskar (in Hindi). 26 October 2024. Retrieved 26 October 2024.
- ^ "IndiGo Airlines to start flights from Darbhanga on July 5". www.jagran.com. Retrieved 5 June 2021.
- ^ "SpiceJet Flight Schedule". SpiceJet. Retrieved 29 October 2024.
- ^ "AAI Traffic News 2021-2022". www.aai.aero. Retrieved 14 May 2022.
- ^ a b Rumi, Faryal (7 March 2023). "Govt transfers land to AAI for Darbhanga airport development". The Times of India. Retrieved 9 March 2023.
- ^ "Story". Archived from the original on 24 January 2018. Retrieved 24 January 2018.
- ^ "Darbhanga MP meets PM Modi; demands renaming of airport". Hindustan Times. 12 August 2021. Retrieved 1 March 2023.
- ^ "Passengers at Bihar's Darbhanga airport struggle without transport at entry gate". Hindustan Times. 13 April 2021. Retrieved 1 March 2023.
- ^ "Govt acquires 24 acres for Bihar's Darbhanga airport runway expansion: Official". Hindustan Times. 19 October 2022. Retrieved 23 October 2022.
- ^ "Bihar hands over another 24 acres of land to upgrade Darbhanga airport". 19 October 2022.
- ^ "Airport Tenders". Airports Authority of India. Retrieved 3 December 2024.
- ^ "6 Bidders for Darbhanga Airport's New Terminal Contract in Bihar". The Metro Rail Guy. 6 February 2024. Retrieved 3 December 2024.
- ^ a b "Ahluwalia Wins Darbhanga Airport's New Terminal Contract". The Metro Rail Guy. 22 February 2024. Retrieved 3 December 2024.
- ^ a b Rumi, Faryal (21 October 2024). "PM lays foundation stone for new civil enclave at Darbhanga airport". The Times of India. Retrieved 3 December 2024.
- ^ "Bihar CM thanks PM for Darbhanga Airport project worth Rs 912 cr". The Week. 20 October 2024. Retrieved 3 December 2024.