Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing, China. According to the Comprehensive Transport Plan of Chongqing Main City Zone, the system will have a total of 14 lines.
Chongqing Suburban Railway | |
---|---|
Overview | |
Native name | 重庆市郊铁路 |
Locale | Chongqing, China |
Transit type | Commuter rail, rapid transit |
Website | http://www.cqrailway.com |
Operation | |
Operator(s) | Chongqing Railway Group Co, Ltd |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 25 kV AC overhead line |
Top speed | 100 km/h (62 mph) – 200 km/h (120 mph) |
Chongqing Suburban Railway | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 重庆市郊铁路 | ||||||||||
Traditional Chinese | 重慶市郊鐵路 | ||||||||||
|
Network
editThis section needs to be updated.(September 2024) |
Opening | Project | Terminus | Top speed | Type | Length (km) | New stations | Start of construction | Status | Notes | ||
---|---|---|---|---|---|---|---|---|---|---|---|
2022 | Jiangtiao[Note 1] | Phase I | Tiaodeng | Shengquansi | 120 km/h (75 mph) | Double-track | 26.7 | 7 | 2014 | Operational | [1] |
TBA | Yuhe | Yuhe line | Moxinpo | Weituo | 160 km/h (99 mph) | Double-track | 49.5 | 5 | TBA | On hold | |
TBA | Heyong | Heyong line | Huangniba | Yongchuannan | 160 km/h (99 mph) | Single-track | 95.0 | 8 | TBA | In planning | |
2024 | Bitong | Bitong line | Bishan | Tongliangxi | 160 km/h (99 mph) | Double-track | 37.5[2] | 9[2] | 2019 | Under testing | [2] |
2025 | Jiangtiao[Note 1] | Phase II | Shengquansi | Dingshan | 120 km/h (75 mph) | Double-track | 4.61 | 2 | 2022 | In full construction | [1] |
See also
editReferences
editNotes
edit- ^ a b Through service with Line 5 (Chongqing Rail Transit)