Chegongzhuang station (simplified Chinese: 车公庄站; traditional Chinese: 車公莊站; pinyin: Chēgōngzhuāng Zhàn) is an interchange station on Line 2 and Line 6 of the Beijing Subway.[1] The station is on intersection of Chegongzhuang Street and the West 2nd Ring Road. It provides direct access to Guanyuan Park.

Chegongzhuang[1]

车公庄
Beijing Subway
Line 2 platform
General information
LocationWest 2nd Ring Road and Chegongzhuang Street (车公庄大街) / Ping'anli West Street (平安里西大街)
Chegongzhuang [zh], Xicheng District, Beijing
China
Coordinates39°55′56.45″N 116°21′20.62″E / 39.9323472°N 116.3557278°E / 39.9323472; 116.3557278
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)
Platforms4 (1 split island platform and 1 island platform)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code202 (line 2)
History
OpenedSeptember 20, 1984; 40 years ago (1984-09-20) (line 2)
December 30, 2012; 11 years ago (2012-12-30) (line 6)
Services
Preceding station Beijing Subway Following station
Fuchengmen
outer loop / anticlockwise
Line 2 Xizhimen
inner loop / clockwise
Chegongzhuangxi
towards Jin'anqiao
Line 6 Ping'anli
towards Lucheng
Location
Chegongzhuang[1] is located in Beijing
Chegongzhuang[1]
Chegongzhuang[1]
Location in central Beijing

Station layout

edit

Both the line 2 and 6 stations have underground island platforms. Line 6 has a split island platform, whilst line 2 has a normal island platform.

Exits

edit

There are 5 exits, lettered A, B, C, E, and H. Exits C and H are accessible.[2][3]

Future Development

edit

It will be the Southern terminus of Line 13A. Construction of Chegongzhuang station on Line 13A started on 20 April 2024.[4]

edit

Notes

edit
  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. ^ "车公庄站(6号线)".
  3. ^ "车公庄站(2号线)".
  4. ^ "中铁十六局集团一周要闻(2024.4.15-4.21)". 2024-04-22. Archived from the original on 2024-06-11. 4月20日,地铁公司承建的北京轨道交通扩能提升工程13号线01标项目正式破土动工,标志着该工程进入实质性施工阶段