User:Mr.BuriramCN/Transport by capital city/B
This user page is My Free Time Hobby Note |
Baku
editThroughout history the transport system of Baku used the now-defunct horsecars, trams and narrow gauge railways. As of 2011, 1000 black cabs are ordered by Baku Taxi Company, and as part of a programme originally announced by the Transport Ministry of Azerbaijan, there is a plan to introduce London cabs into Baku.[1][2] The move was part of £16 million agreement between Manganese Bronze and Baku Taxi Company.[3][4]
Local transport includes the Baku Metro, a rapid-transit system notable for its art, murals, mosaics and ornate chandeliers. Baku Metro was opened in November 1967 and includes 22 stations at present; 170 million people used Baku Metro over the past five years.[5] In 2008, the Chief of the Baku Metro, Taghi Ahmadov, announced plans to construct 41 new stations over the next 17 years. These will serve the new bus complex as well as the international airport.[6]
Plans are afoot to introduce a single Smart Card for payment on all types of city transport. The metro is now the only form of transport in Baku to use any type of card-based fare-payment system.[7]
Baku's Central Railway Station is the terminus for national and international rail links to the city. The Kars–Tbilisi–Baku railway, which will directly connect Turkey, Georgia and Azerbaijan, began to be constructed in 2007 and is scheduled for completion in 2013.[8] The completed branch will connect Baku with Tbilisi in Georgia, and from there trains will continue to Akhalkalaki, and Kars in Turkey.[9]
Sea transport is vital for Baku, as the city is practically surrounded by the Caspian Sea to the east. Shipping services operate regularly from Baku across the Caspian Sea to Turkmenbashi (formerly Krasnovodsk) in Turkmenistan and to Bandar Anzali and Bandar Nowshar in Iran.[10] The commuter ferries, along with the high-speed catamaran Seabus (Deniz Avtobusu), also form the main connection between the city and the Absheron peninsula.[11]
The Baku Port was founded in 1902 and since then has been the largest Caspian Sea port. It has six facilities: the main cargo terminal, the container terminal, the ferry terminal, the oil terminal, the passenger terminal and the port fleet terminal. The port's throughput capacity reaches 15 million tons of liquid bulk and up to 10 million tons of dry cargoes.[12] Beginning in 2010, the Baku International Sea Trade Port is being reconstructed. The construction will take place in three stages and will be completed by 2016. The estimated costs are 400 Million US$.[13] From April to November the Baku Port is accessible to ships loading cargoes for direct voyages from Western European and Mediterranean ports.
The State Road M-1 and the European route E60 are the two main motorway connections between Europe and Azerbaijan. The motorway network around Baku is well developed and is constantly being extended.
The Heydar Aliyev International Airport is the only commercial airport serving Baku. The new Baku Cargo Terminal was officially opened in March 2005. It was constructed to be a major cargo hub in the CIS countries and is actually now one of the biggest and most technically advanced in the region.[14] There are also several smaller military airbases near Baku, such as Baku Kala Air Base, intended for private aircraft, helicopters and charters.[15]
Bamako
editThe Dakar-Niger Railway links Bamako to Dakar via Kati, Négala, Kita and Kayes. The road network links Bamako to Koulikoro, Kati, Kolokani, Ségou and Sikasso.
The Bamako-Sénou International Airport is located 15 km from the city and opened to passengers in 1974. Passenger traffic steadily increased in the early 2000s. Government figures revealed 403,380 passengers in 1999, 423,506 in 2003, 486,526 in 2004, and 516,000 in 2005. and is predicted to reach over 900,000 by 2015 under a low (4%) yearly growth rate scenario.[16] To date this growth rate has been surpassed. Total air traffic the airport increased by 12.4% in 2007 and 14% in 2008. Most of this increase came in passenger transport, with the number of passengers served increasing by 20% in 2007 and 17% in 2008. Twenty-seven airline carriers operated weekly or better at Bamako-Sénou International Airport in the 2007–2008 period. This continued growth was offset by cargo flights' decline of 16.75% in 2007, and 3.93% in 2008.[17] The highest frequency route is on the Bamako-Dakar sector with 29 weekly non-stop connections. Domestic flights also serve Mali's regional capitals Kayes, Mopti, Timbuktu, Sikasso, Gao, and Kidal. Bamako Senou International Airport is managed by Aéroports du Mali (ADM).[16] Its operations are overseen by the Malian Ministry of Equipment and Transports.[17]
Much of the transportation is either by the Niger River, or by paved roads linking Bamako to other major urban areas. Navigating the Niger River is possible from Koulikoro to Mopti and Gao. The bush taxi is one of the main modes of transport.
Bamako is situated on both sides of the river Niger River and two bridges connect the two banks: the Bridge of Martyrs completed in 1960 and renamed in memory of protesters killed in March 1991 by the regime of Moussa Traoré, and the King Fahd Bridge, named after the Saudi Arabian donor. A third bridge project is currently being funded by the People's Republic of China. Located in Sotuba area, it has the objective to decongest traffic in the city.[18]
Bandar Seri Begawan
editLand
editThe capital is connected to Bus of Bandar Seri Begawan the western part of the country by road. To get to the eastern part of Brunei (Temburong) it is necessary to travel through Sarawak which is in Malaysia, via the town of Limbang which is accessed by the Kuala Lurah Bus terminal. To get to Bandar Seri Begawan from the west, access is via Miri town in Sarawak via the Sungai Tujuh Bus terminal and then along the coastal highway.
The main bus station in the city is located in Jalan Cator underneath a multi-story car park. There are six bus routes servicing Bandar Seri Begawan area; the Central Line, Circle Line, Eastern Line, Southern Line, Western Line and Northern Line. The buses operate from 6.30 am till 6.00pm except for Bus No. 1 and 20 which have extended to the night. All bus routes begin and terminate their journey at the main bus terminal. Buses heading to other towns in Brunei such as Tutong, Seria and Kuala Belait also depart from the main bus terminal and Taxicab.
Air
editBrunei International Airport serves the whole country. It is 11 km (6.8 mi) from the town centre and can be reached in 10 minutes via the Sultan Hassanal Bolkiah Highway. Airlines flying into the airport include Royal Brunei Airlines, Singapore Airlines, Malaysian Airlines, Air Asia, Cebu Pacific and Thai Airways International.[19]
Water
editA water taxi service known as 'penambang' is used for transportation between downtown Bandar Seri Begawan and Kampong Ayer. Water taxis are the most common means of negotiating the waterways of Kampung Ayer. They can be hailed from the numerous "docking parts" along the banks of the Brunei River. Fares are negotiable. Regular water taxi and boat services depart for Temburong between 7:45 am and 4 pm daily, and also serve the Malaysian towns of Limbang, Lawas, Sundar and Labuan. A speedboat is used for passengers traveling to Penamdang Ferry Service and from Bangar and Limbang.
Bangkok
editAlthough Bangkok's canals historically served as a major mode of transport, they have long since been surpassed in importance by land traffic. Charoen Krung Road, the first to be built by Western techniques, was completed in 1864. Since then, the road network has vastly expanded to accommodate the sprawling city. A complex elevated expressway network helps bring traffic into and out of the city centre, but Bangkok's rapid growth has put a large strain on infrastructure, and traffic jams have plagued the city since the 1990s. Although rail transport was introduced in 1893 and electric trams served the city from 1894 to 1968, it was only in 1999 that Bangkok's first rapid transit system began operation. Older public transport systems include an extensive bus network and boat services which still operate on the Chao Phraya and two canals. Taxis appear in the form of cars, motorcycles, and tuk-tuk.
Bangkok is connected to the rest of the country through the national highway and rail networks, as well as by domestic flights to and from the city's two international airports. Its centuries-old maritime transport of goods is still conducted through Khlong Toei Port.
The BMA is largely responsible for overseeing the construction and maintenance of the road network and transport systems through its Public Works Department and Traffic and Transportation Department. However, many separate government agencies are also in charge of the individual systems, and much of transport-related policy planning and funding is contributed to by the national government.
Roads
editRoad-based transport is the primary mode of travel in Bangkok. Due to the city's organic development, its streets do not follow an organized grid structure. Forty-eight major roads link the different areas of the city, branching into smaller streets and lanes (soi) which serve local neighbourhoods. Eleven bridges over the Chao Phraya link the two sides of the city, while the Ratchadaphisek inner ring road encircles the inner city. Several roads linking Bangkok with neighbouring and further provinces are designated as national highways, including the primary routes Phahonyothin (route 1), Sukhumvit (route 3), and Phetkasem (route 4). The outer ring road, Kanchanaphisek (motorway route 9), runs through Bangkok's suburbs, linking with Nonthaburi, Pathum Thani and Samut Prakan, while the Bangkok–Chonburi Motorway (route 7) runs to the eastern seaboard province, passing Suvarnabhumi Airport on the way.
Bangkok's rapid growth in the 1980s resulted in sharp increases in vehicle ownership and traffic demand, which have since continued—in 2006 there were 3,943,211 in-use vehicles in Bangkok, of which 37.6 percent were private cars and 32.9 percent were motorcycles.[21] These increases, in the face of limited carrying capacity, were expressed as severe traffic congestion evident by the early 1990s. The extent of the problem is such that the Thai Traffic Police has a unit of officers trained in basic midwifery in order to assist deliveries which do not reach hospital in time.[22] While Bangkok's limited road surface area (8 percent, compared to 20–30 percent in most Western cities) is often cited as a major cause of its traffic jams, other factors, including high vehicle ownership rate relative to income level, inadequate public transport systems, and lack of transportation demand management, also play a role.[23] Efforts to alleviate the problem have included the construction of intersection bypasses and an extensive system of elevated highways (including the expressway system and Don Mueang Tollway), as well as the creation of several new rapid transit systems. These actions, however, have not been successful in improving the city's overall traffic conditions.
Traffic has been the main source of air pollution in Bangkok, which reached serious levels in the 1990s. However, efforts to improve air quality by improving fuel quality and enforcing emission standards, among others, have been largely successful. Atmospheric particulate matter levels dropped from 81 micrograms per cubic metre in 1997 to 43 in 2007.[24]
Although the BMA has created thirty signed bicycle routes along several roads totalling 230 kilometres (140 mi),[25] cycling is still largely impractical, especially in the city centre. Most of these bicycle lanes share the pavement with pedestrians. Poor surface maintenance, encroachment by hawkers and street vendors, and a hostile environment for cyclists and pedestrians, make cycling and walking unpopular methods of getting around in Bangkok.
Buses
editBangkok has an extensive bus network providing local transit services within the Greater Bangkok area. The Bangkok Mass Transit Authority (BMTA) operates a monopoly on bus services, with substantial concessions granted to private operators. 3,506 BMTA buses, together with private joint buses, minibuses, song thaeo buses and vans totalling 16,321 in number, operate on 470 routes throughout the region. Although a large number of commuters still ride the buses daily, passenger numbers have been almost consistently on decline in the last two decades. The BMTA reported an average of 1,048,442 trips per day in 2010, a quarter of the 4,073,883 reported in 1992.[26]
A separate bus rapid transit system owned by the BMA has been in operation since 2010. Known simply as the BRT, the system currently consists of a single line running from the business district at Sathon to Ratchaphruek on the western side of the city. Although further lines had been planned, development on all route expansions are currently halted.
Long-distance bus services to all provinces operate out of Bangkok. The Transport Co., Ltd. is the BMTA's long-distance counterpart. North- and northeast-bound buses leave from the Chatuchak (Mo Chit 2) Bus Terminal, while eastbound and southbound buses leave from Ekkamai and South Bangkok terminals, respectively.
Taxis
editTaxis are ubiquitous in Bangkok, and are a popular form of transport. As of August 2012[update], there are 106,050 cars, 58,276 motorcycles and 8,996 tuk-tuk motorized tricycles cumulatively registered for use as taxis.[27] Meters have been required for car taxis since 1992, while tuk-tuks' fares are usually bargained. Motorcycle taxis operate from regulated ranks, with either fixed or negotiable fares, and are usually employed for relatively short journeys.
Car taxis are either privately owned, or belong to a company or cooperative. Such ownership is reflected in their bright and distinctive paints: private taxis are green/yellow, while different companies have varying colour schemes. Despite their popularity, taxis have gained a bad reputation for often refusing passengers when the requested route is not to the driver's convenience.[28] In June 2012, the Department of Land Transport announced a campaign to overhaul taxi driver registrations, as it revealed that there had been only 66,645 legally registered cabdrivers.[29] A campaign of stricter punishments for refusing passengers was announced in September, along with the launch of new complaint-lodging systems.
Motorcycle taxis were previously unregulated, and subject to extortion by organized crime gangs. Since 2003, registration has been required for motorcycle taxi ranks, and drivers now wear distinctive numbered vests designating their district of registration and where they are allowed to accept passengers.
Rail systems
editBangkok is the location of Hua Lamphong Railway Station, the main terminus of the national rail network operated by the State Railway of Thailand (SRT). In addition to long-distance services, the SRT also operates a few daily commuter trains running from and to the outskirts of the city during the rush hour.
Bangkok is currently served by three rapid transit systems: the BTS Skytrain, the underground MRT and the elevated Airport Rail Link. Although proposals for the development of rapid transit in Bangkok had been made since 1975,[30] it was only in 1999 that the BTS finally began operation.
The BTS consists of two lines, Sukhumvit and Silom, with thirty stations along 30.95 kilometres (19.23 mi). The MRT opened for use in July 2004, and currently consists of one line, the Blue Line. It runs for 20 kilometres (12 mi) and has eighteen stations, three of which connect to the BTS system. The Airport Rail Link, more recently opened in August 2010, is operated by the SRT and connects the city centre to Suvarnabhumi Airport to the east. Its eight stations span a distance of 28 kilometres (17 mi).
Although initial passenger numbers were low and their service area remains limited to the inner city, these systems have become indispensable to many commuters. The BTS reported an average of 392,167 daily trips in 2010, while the MRT had 178,334 passenger trips per day. However, relatively high fare prices have kept these systems inaccessible to a portion of the population.
The BTS has had two route extensions since its opening. As of 2012[update], construction work is being done to extend the southwest and southeast ends of the BTS, as well as double the length of the Blue MRT line. Several additional transit lines are also under construction, including the northward Purple Line and the Light Red grade-separated commuter rail line, to be run by the SRT. The entire Mass Rapid Transit Master Plan in Bangkok Metropolitan Region consists of eight main lines and four feeder lines totalling 508 kilometres (316 mi) to be completed by 2029. In addition to rapid transit and heavy rail lines, there have been proposals for several monorail systems.
Water transport
editAlthough much diminished from their past prominence, water-based transport still plays an important role in Bangkok and the immediate upstream and downstream provinces. Several water buses serve commuters daily. The Chao Phraya Express Boat carries passengers along the river, regularly serving thirty-four stops from Rat Burana to Nonthaburi and carrying an average of 35,586 passengers per day in 2010. The smaller Khlong Saen Saep boat service serves twenty-seven stops from Wat Si Bun Rueang to Phan Fa Lilat on Saen Saep Canal, and another service serves thirteen stops on Khlong Phra Khanong. They served a daily average of 57,557 and 721 passengers, respectively. Long-tail boats operate on fifteen regular routes on the Chao Phraya, with an average of 2,889 passengers per day. Passenger ferries at thirty-two river crossings served an average of 136,927 daily passengers in 2010.[31]
Bangkok Port, popularly known by its location as Khlong Toei Port, was Thailand's main international port from its opening in 1947 until it was superseded by the deep-sea Laem Chabang Port in 1991. It is primarily a cargo port, though its inland location limits access to ships of 12,000 deadweight tonnes or less. The port handled 11,936,855 tonnes (13,158,130 tons) of cargo in the first eight months of the 2010 fiscal year, about 22 percent the total of the country's international ports.[32][33]
Airports
editBangkok is one of Asia's busiest air transport hubs. Two commercial airports serve the city, the older Don Mueang International Airport and the new Bangkok International Airport, commonly known as Suvarnabhumi. Suvarnabhumi, which replaced Don Mueang as Bangkok's main airport at its opening in 2006, served 47,910,744 passengers in 2011, making it the world's sixteenth-busiest airport by passenger volume and the fifth-busiest in the Asia Pacific region.[34] However, this amount of traffic is already over its designed capacity of 45 million passengers. Don Mueang has since been reopened for domestic flights in 2007,[35] and resumed international services focusing on low-cost carriers in October 2012.[36] Suvarnabhumi is undergoing expansion in order to increase its capacity to 60 million, which is expected to be completed by 2016.[37]
Bangui
editBangui is the transport hub of the Central African Republic. As of 1999, eight roads connected the city to other main towns in the country, Cameroon, Chad and South Sudan; of these, only the toll roads are paved. During the rainy season from July to October, some roads are unpassable.[38][39] The road network in the city emanates from the Palace de la Republique.[40]
River ferries sail from the river port at Bangui to Brazzaville and Zongo. The river can be navigated most of the year between Bangui and Brazzaville. From Brazzaville, goods are transported by rail to Pointe-Noire, Congo's Atlantic port.[41] The river port handles the overwhelming majority of the country's international trade and has a cargo handling capacity of 350,000 tons; it has 350 metres (1,150 ft) length of wharfs and 24,000 square metres (260,000 sq ft) of warehousing space.[38]
The first airstrip in Bangui was built between 1920-25. Bangui M'Poko International Airport (IATA airport code BGF) is located 7 kilometres (4.3 mi) to the north of the old town, on the Avenue of Martyrs between the Koudoukou Avenue and the University of Bangui, in 600 hectares (1,500 acres) of deforested land. [42] There are plans to connect Bangui by rail with the Transcameroon Railway which would be beneficial to the country.[43]
Banjul
edit
Ferries sail from Banjul to Barra. The city is served by the Banjul International Airport. Banjul is on the Trans–West African Coastal Highway connecting it to Dakar and Bissau, and will eventually provide a paved highway link to 11 other nations of the Economic Community of West African States (ECOWAS).
Banjul International Airport was one of the primary Transoceanic Abort Landing (TAL) sites for the Space Shuttle. It was selected in September 1987, replacing a TAL site at Dakar, Senegal, due to runway deficiencies and geographic hazards there. Banjul was closed as a TAL site in November 2002, although it was used for the STS-125 mission to the Hubble Space Telescope in 2009.
Basseterre
editBasseterre is hub for all major roads on the island of St. Kitts. Driving is done on the left. The speed limit in the city is 25 mph (40 km/h) everywhere, with special caution to be taken around school zones.
Public buses
editPublic Buses have a green license plate starting with the letter "H" There are 5 main bus routes on St. Kitts:
- Basseterre to Sandy Point travelling West, starting at the Ferry Terminal,
- Basseterre to Capesterre travelling West, starting at the Ferry Terminal,
- Basseterre to St. Peter's travelling North, starting at College Street Ghaut,
- Basseterre to Molyneux travelling East, starting at Baker's Corner and
- Basseterre to Saddler's travelling East, starting at Baker's Corner.
All bus fees are $2.50 for a trip 5 miles (8.0 km) and under, $3.00 for a trip 5 to 10 miles (16 km), and $3.75 for a trip over 10 miles (16 km). (EC dollars. 1 US = 2.7 EC)
No public buses travel southwards to the main resort areas in Frigate Bay and the South East Peninsula.
Taxis
editTaxis have yellow license plates starting with the letter "T" or "TA". The taxi station in Basseterre is located at the Circus (466 6999). The taxis will take you just about anywhere for a pre-calculated price.
Harbour
editThe Deep Water Harbour in Basseterre is capable of both hosting and berthing of cruise ships or the handling of cargo. It is located to the extreme East of Basseterre Bay.
Port Zante, in the centre of the Bay, is for use of docking cruise ships only. The Port can accommodate the largest cruise ships in the world; it also has a marina facility.
The bay is also home to the bustling ferry operation which takes place between Basseterre and Charlestown. There are numerous trips daily served by as much as six ferries. Ferry service between Basseterre and Oranjestad, Statia as well as to St. Maarten also exists, but the trips are irregular.
Airport
editThe Robert L. Bradshaw International Airport serves the city of Basseterre, and is located in the city's most North Easternly area. It has direct flights to London, New York, and Miami and seasonal flights to Charlotte, North Carolina, Atlanta, and Philadelphia in addition to other major cities in the United States and Canada during tourist season.
Railway
editSt. Kitts' 58 km of narrow (0.762m)-gauge railway centre in Basseterre, and swoop the island in a circular pattern. The railway lines, originally built to transport sugar cane to the central sugar factory in Basseterre, are now used to transport tourists via the "St. Kitts Scenic Railway Train" which currently runs from Sandy Point to Basseterre, travelling East.[44]
Beijing
editBeijing is an important transport hub in North China with five ring roads, nine expressways, eleven National Highways, nine conventional railways, and two high-speed railways converging on the city.
Rail and high-speed rail
editBeijing serves as a large rail hub in China's railway network. Nine conventional rail lines radiate from the city to: Shanghai (Jinghu Line), Guangzhou (Jingguang Line), Kowloon (Jingjiu Line), Harbin (Jingha Line), Baotou (Jingbao Line), Qinhuangdao (Jingqin Line), Chengde (Jingcheng Line), Tongliao, Inner Mongolia (Jingtong Line) and Yuanping, Shanxi (Jingyuan Line). In addition, the Datong–Qinhuangdao Railway passes through the municipality to the north of the city.
Beijing also has three high-speed rail lines: the Beijing-Tianjin Intercity Railway, which opened in 2008; the Beijing-Shanghai High-Speed Railway, which opened in 2011; and the Beijing–Guangzhou High-Speed Railway, which opened in 2012.
The city's main railway stations are the Beijing Railway Station, which opened in 1959; the Beijing West Railway Station, which opened in 1996; and the Beijing South Railway Station, which was rebuilt into the city's high-speed railway station in 2008. As of 1 July 2010, Beijing Railway Station had 173 trains arriving daily, Beijing West had 232 trains and Beijing South had 163. The Beijing North Railway Station, first built in 1909 and expanded in 2009, had 22 trains.
Smaller stations in the city including Beijing East Railway Station and Qinghuayuan Railway Station handle mainly commuter passenger traffic. The Fengtai Railway Station has been closed for renovation. In outlying suburbs and counties of Beijing, there are over 40 railway stations.[45]
From Beijing, direct passenger train service is available to most large cities in China. International train service is available to Mongolia, Russia, Vietnam and North Korea. Passenger trains in China are numbered according to their direction in relation to Beijing.
Roads and expressways
edit- See Expressways of Beijing and China National Highways of Beijing for more related information.
Beijing is connected by road links to all parts of China as part of the National Trunk Road Network. Nine expressways of China serve Beijing, as do eleven China National Highways. Beijing's urban transport is dependent upon the five "ring roads" that concentrically surround the city, with the Forbidden City area marked as the geographical center for the ring roads. The ring roads appear more rectangular than ring-shaped. There is no official "1st Ring Road". The 2nd Ring Road is located in the inner city. Ring roads tend to resemble expressways progressively as they extend outwards, with the 5th and 6th Ring Roads being full-standard national expressways, linked to other roads only by interchanges. Expressways to other regions of China are generally accessible from the 3rd Ring Road outward.
Within the urban core, city streets generally follow the checkerboard pattern of the ancient capital. Many of Beijing's boulevards and streets with "inner" and "outer" are still named in relation to gates in the city wall, though most gates no longer stand. Traffic jams are a major concern. Even outside of rush hour, several roads still remain clogged with traffic.
Beijing's urban design layout further exacerbates transportation problems.[46] The authorities have introduced several bus lanes, which only public buses can use during rush hour. In the beginning of 2010, Beijing had 4 million registered automobiles.[47] By the end of 2010, the government forecast 5 million. In 2010, new car registrations in Beijing averaged 15,500 per week.[48]
Towards the end of 2010, the city government announced a series of drastic measures to tackle traffic jams, including limiting the number of new license plates issued to passenger cars to 20,000 a month and barring cars with non-Beijing plates from entering areas within the Fifth Ring Road during rush hour.[49]
Air
editBeijing's primary airport is the Beijing Capital International Airport (IATA: PEK) about 20 kilometres (12 mi) northeast of the city center. The airport is the second busiest airport in the world after Hartsfield-Jackson Atlanta International Airport. After renovations for the 2008 Olympics, the airport now boasts three terminals, with Terminal 3 being one of the largest in the world. Most domestic and nearly all international flights arrive at and depart from Capital Airport. It is the main hub for Air China and a hub for China Southern and Hainan Airlines. The airport links Beijing with almost every other Chinese city with regular air passenger service.
The Airport Expressway links the airport to central Beijing; it is a roughly 40-minute drive from the city center during good traffic conditions. Prior to the 2008 Olympics, the 2nd Airport Expressway was built to the airport, as well as a light rail system, which now connects to the Beijing Subway.
Other airports in the city include Liangxiang, Nanyuan, Xijiao, Shahe and Badaling. These airports are primarily for military use and are less well known to the public. Nanyuan serves as the hub for only one passenger airline. A second international airport, to be called Beijing Daxing International Airport,[50] is currently being built in Daxing District, and is expected to be open by 2017.[51]
From January 1, 2013, tourists from 45 countries will be allowed to enjoy a 72-hour visa-free stay in Beijing. The 45 countries include Singapore, Japan, the United States, France, Germany, Italy, Spain, Canada, Brazil, Argentina and Australia. The programme benefits transit and business travellers.[52]
Public transit
editThe Beijing Subway, which began operating in 1969, now has 17 lines, 227 stations, and 456 km (283 mi) of track and is the second longest subway system in the world and third in annual ridership with 2.46 billion rides delivered in 2012. With a flat fare of ¥2.00 per ride with unlimited transfers on all lines except the Airport Express, the subway is also the most affordable rapid transit in China. The subway is undergoing rapid expansion and is expected to reach 30 lines, 450 stations, 1,050 kilometres (650 mi) in length by 2012. When fully implemented, 95% residents inside the Fourth Ring Road will be able walk to a station in 15 minutes.[53] The Beijing Suburban Railway provides commuter rail service to outlying suburbs of the municipality.
There are nearly 1,000 public bus and trolleybus lines in the city, including four bus rapid transit lines. Standard bus fares are as low as ¥0.40 when purchased with the Yikatong metrocard.
Taxi
editMetered taxi in Beijing start at ¥13 for the first 3 kilometres (1.9 mi), ¥2.3 Renminbi per additional 1 kilometre (0.62 mi) and ¥1 per ride fuel surcharge, not counting idling fees which are ¥2.3 (¥4.6 during rush hours of 7-9 am and 5-7 pm) per 5 minutes of standing or running at speeds lower than 12 kilometres per hour (7.5 mph) . Most taxis are Hyundai Elantras, Hyundai Sonatas, Peugeots, Citroëns and Volkswagen Jettas. After 15 kilometres (9.3 mi), the base fare increases by 50% (but is only applied to the portion over that distance). Between 11 pm and 5 am, there is also a 20% fee increase. Rides over 15 km (9 mi) and between 23:00 and 06:00 incur both charges, for a total increase of 80%. Tolls during trip should be covered by customers and the costs of trips beyond Beijing city limits should be negotiated with the driver. The cost of unregistered taxis is also subject to negotiation with the driver.
Bicycles
editBeijing has long been well known for the number of bicycles on its streets. Although the rise of motor traffic has created a great deal of congestion and bicycle use has declined, bicycles are still an important form of local transportation. Large numbers of cyclists can be seen on most roads in the city, and most of the main roads have dedicated bicycle lanes. Beijing is relatively flat, which makes cycling convenient. The rise of electric bicycles and electric scooters, which have similar speeds and use the same cycle lanes, may have brought about a revival in bicycle-speed two-wheeled transport. It is possible to cycle to most parts of the city. Because of the growing traffic congestion, the authorities have indicated more than once that they wish to encourage cycling, but it is not clear whether there is sufficient will to translate that into action on a significant scale.[54]
Beirut
editThe city's renovated airport is the Rafic Hariri International Airport, located in the southern suburbs. It can be reached by any means of transport, whether buses or taxis. The service taxis are cheaper than normal taxis, but to avoid misunderstandings, the price should be agreed before setting off on a journey.[55] The Port of Beirut, one of the largest and most commercial in the eastern Mediterranean, is another port of entry. As a final destination, Lebanon can be reached by ferry from Cyprus via the nearby city of Jounieh or by road from Damascus via the Beqaa valley in the east.[55]
Beirut has frequent bus connections to other cities in Lebanon and major cities in Syria such as Homs and its capital Damascus. There are a number of different companies providing public transport in Lebanon. The publicly owned buses are managed by Office des Chemins de Fer et des Transports en Commun (OCFTC – "Railway and Public Transportation Authority"). Buses for northern destinations and Syria leave from Charles Helou Station.[56]
The ministry of transport and public works purchased an extra 250 intra and inter-buses in 2012 to better serve regions outside the capital as well as congested-chocked Beirut, hoping to lessen the use of private cars. [citation needed] .
Beirut has also private buses that are provided by the Lebanese Commuting Company.
Belgrade
editBelgrade has an extensive public transport system based on buses (118 urban lines and more than 300 suburban lines), trams (12 lines), and trolleybuses (8 lines).[57] It is run by GSP Beograd and SP Lasta, in cooperation with private companies on various bus routes. The BusPlus ticketing system based on contactless smart cards began operating in February 2012. Belgrade also has a commuter rail network, Beovoz, now run by the city government. The main railway station connects Belgrade with other European capitals and many towns in Serbia. Travel by coach is also popular, and the capital is well-served with daily connections to every town in Serbia and to many other European destinations through the central bus station.
The city is placed along the pan-European corridors X and VII.[58] The motorway system provides for easy access to Novi Sad and Budapest, in the north; Niš to the south; and Zagreb, to the west. Situated at the confluence of two major rivers, the Danube and the Sava, Belgrade has 7 bridges—the two main ones are Branko's Bridge and the Gazela Bridge, both of which connect the core of the city to New Belgrade. With the city's expansion and a substantial increase in the number of vehicles, congestion has become a major problem; this is expected to be alleviated by the construction of a bypass connecting the E70 and E75 motorways.[59] Further, an "inner magistral semi-ring" is planned, including a new Ada Bridge across the Sava river, which is expected to ease commuting within the city and unload the Gazela and Branko's bridge.[60]
The Port of Belgrade is on the Danube, and allows the city to receive goods by river.[61] The city is also served by Belgrade Nikola Tesla Airport (IATA: BEG), 12 kilometres west of the city centre, near Surčin. At its peak in 1986, almost 3 million passengers travelled through the airport, though that number dwindled to a trickle in the 1990s.[62] Following renewed growth in 2000, the number of passengers reached approximately 2 million in 2004 and 2005,[63] over 2,6 million passengers in 2008,[64] reaching all-time peak in 2011 with over 3 million passengers.[65]
Beovoz is the suburban/commuter railway network that provides mass-transit services in the city, similar to Paris' RER and Toronto's GO Transit. The main usage of today's system is to connect the suburbs with the city centre. Beovoz is operated by Serbian Railways.[66] Belgrade suburban railway system connects suburbs and nearby cities to the west, north and south of the city. It began operation in 1992 and currently has 5 lines with 41 stations divided in two zones.[67]
Belgrade was one of the last big European capitals, and cities with over a million people, to have no metro/subway or other rapid transit system. The Belgrade Metro is considered to be the third most important project in the country, after work on roads and railways. The two projects of highest priority are the Belgrade bypass and Pan-European corridor X.
Berlin
editBerlin's transport infrastructure is highly complex, providing a diverse range of urban mobility.[68] A total of 979 bridges cross 197 km (122 mi) of inner-city waterways. 5,334 km (3,314 mi) of roads run through Berlin, of which 73 km (45 mi) are motorways ("Autobahn").[69] In 2006, 1.416 million motor vehicles were registered in the city.[70] With 358 cars per 1000 residents in 2008 (570/1000 in Germany), Berlin as a German state and as a major European city has one of the lowest numbers of cars per capita.[71]
Long-distance rail lines connect Berlin with all of the major cities of Germany and with many cities in neighboring European countries. Regional rail lines provide access to the surrounding regions of Brandenburg and to the Baltic Sea. The Berlin Hauptbahnhof is the largest grade-separated railway station in Europe.[72] Deutsche Bahn runs trains to domestic destinations like Hamburg, Munich, Cologne and others. It also runs an airport express rail service, as well as trains to several international destinations.
The Berliner Verkehrsbetriebe and the Deutsche Bahn manage several dense urban public transport systems.[73]
System | Stations/ Lines/ Net length | Passengers per year | Operator/ Notes |
---|---|---|---|
S-Bahn | 166 / 15 / 331 km (206 mi) | 376 million | DB/ Mainly overground rail system. Some suburban stops. |
U-Bahn | 173 / 10 / 147 km (91 mi) | 457 million | BVG/ Mainly underground rail system. 24hour-service on weekends. |
Tram | 398 / 22 / 192 km (119 mi) | 171 million | BVG/ Operates predominantly in eastern boroughs. |
Bus | 2627 / 147 / 1,626 km (1,010 mi) | 407 million | BVG/ Extensive services in all boroughs. 46 Night Lines |
Ferry | 6 lines | BVG/ All modes of transport can be accessed with the same ticket.[74] |
- Airports
Berlin has two commercial airports. Berlin Tegel Airport (TXL), which lies within the city limits, and Schönefeld Airport (SXF), which is situated just outside Berlin's south-eastern border in the state of Brandenburg. Both airports together handled 24 million passengers in 2011. In 2011, 88 airlines served 164 destinations in 54 countries from Berlin.[75] Tegel Airport is an important hub for Air Berlin as well as a focus city for Lufthansa, whereas Schönefeld services mainly low-cost and leisure airlines, most notably easyJet.
Berlin Brandenburg Airport (BER) will replace Tegel and Schönefeld as single commercial airport of Berlin.[76] Originally planned to be opened in 2011, the new airport has been delayed several times due to poor construction management and technical difficulties.[77] As of January 2013, it is not known when BER will become operational.[78]
- Cycling
Berlin is well known for its highly developed bicycle lane system.[79] It is estimated that Berlin has 710 bicycles per 1000 residents. Around 500,000 daily bike riders accounted for 13% of total traffic in 2009.[80] Cyclists have access to 620 km (385 mi) of bicycle paths including approximately 150 km (93 mi) of mandatory bicycle paths, 190 km (118 mi) (120 miles) of off-road bicycle routes, 60 km (37 mi) of bicycle lanes on roads, 70 km (43 mi) of shared bus lanes which are also open to cyclists, 100 km (62 mi) of combined pedestrian/bike paths and 50 km (31 mi) of marked bicycle lanes on roadside pavements (or sidewalks).[81]
Bern
editPublic transport works well in Bern, with the Bern S-Bahn, Bern tramway network, Bern trolleybus system and a bus network forming an integrated all-four style scheme connecting the different parts of the city.
A funicular railway leads from the Marzili district to the Bundeshaus. The Marzilibahn funicular is, with a length of 106 m (348 ft), the second shortest public railway in Europe after the Zagreb funicular.
Several Aare bridges connect the old parts of the city with the newer districts outside of the peninsula.
Bern is well connected to other cities by several motorways (A1, A12, A6).
Bern railway station connects the city to the national and international railways network.
Bern is also served by Bern Airport, located outside the city near the town of Belp. The regional airport, colloquially called Bern-Belp or Belpmoos, is connected to several European cities. Additionally Zürich Airport, Geneva Airport and EuroAirport Basel-Mulhouse-Freiburg also serve as international gateways, all reachable within two hours by car or train from Bern.
Bishkek
editMass public transport
editThere is public transportation available, including buses, electric trolley buses, and public vans (known in Russian as marshrutka). Taxi cabs can be found throughout the city.
There is no subway in Bishkek, but the city is considering designing and building a light rail system (Бишкекское лёгкое метро).
Commuter and long-distance buses
editThere are two main bus stations in Bishkek. The smaller old Eastern Bus Station is primarily the terminal for minibuses to various destinations within or just beyond the eastern suburbs, such as Kant, Tokmok, Kemin, Issyk Ata, or the Korday border crossing.
Long-distance regular bus and minibus services to all parts of the country, as well as to Almaty (the largest city in neighboring Kazakhstan) and Kashgar, China, run mostly from the newer grand Western Bus Station; only a smaller minority of them runs from the Eastern Station.
The Dordoy Bazaar on the north-eastern outskirts of the city also contains makeshift terminals for frequent minibuses to suburban towns in all directions (from Sokuluk in the west to Tokmak in the east) and to some buses taking traders to Kazakhstan and Siberia.
Rail
editAs of 2007, the Bishkek railway station sees only a few trains a day. It offers a popular three-day train service from Bishkek to Moscow.
There are also long-distance trains that leave for Siberia (Novosibirsk and Novokuznetsk), via Almaty, over the Turksib route, and to Yekaterinburg (Sverdlovsk) in the Urals, via Astana. These services are remarkably slow (over 48 hours to Yekaterinburg), due to long stops at the border and the indirect route (the trains first have to go west for more than a 100 kilometres (62 mi) before they enter the main Turksib line and can continue to the east or north). For example, as of the fall of 2008, train No. 305 Bishkek-Yekaterinburg was scheduled to take 11 hours to reach the Shu junction—a distance of some 269 kilometres (167 mi) by rail, and less than half of that by road.[82]
Air
editThe city is served by Manas International Airport (IATA code FRU), located approximately 25 kilometres (16 mi) northwest of the city centre, and readily reachable by taxi.
In 2002, the United States obtained the right to use Manas International Airport as an air base for its military operations in Afghanistan and Iraq. Russia subsequently (2003) established an air base of its own (Kant Air Base) near Kant some 20 kilometres (12 mi) east of Bishkek. It is based at a facility that used to be home to a major Soviet military pilot training school; one of its students, Hosni Mubarak, later became president of Egypt.
Bogotá
editBogotá's growth has placed a strain on its roads and highways, but since 1998 significant efforts to upgrade the infrastructure have been undertaken. Private car ownership, despite being under 27% [citation needed], forms a major part of the congestion, in addition to taxis, buses and commercial vehicles. Buses remain the main means of mass transit. There are two bus systems: the traditional system and the TransMilenio. The traditional system runs a variety of bus types, operated by several companies on normal streets and avenues: Bus (large buses), Buseta (medium size buses) and Colectivo (vans or minivans). The bigger buses were divided into two categories: Ejecutivo, which was originally to be a deluxe service and was not to carry standing passengers, and corriente or normal service. Since May 2008, all buses run as corriente services. Bogotá is a hub for domestic and international bus routes. The Bogotá terminal serves routes to most cities and towns in Colombia[83] and is the largest in the country. There is international service to Ecuador, Perú and Venezuela.
The TransMilenio 'rapid transit system' was created during Enrique Peñalosa's mayoral term,[84] and is a form of bus rapid transit that has been deployed as a measure to compensate for the lack of a subway or rail system. TransMilenio combines articulated buses that operate on dedicated bus roads (busways) and smaller buses (feeders) that operate in residential areas, bringing passengers to the main grid. TransMilenio's main routes are: Caracas Avenue, Northern Highway (Autopista Norte), 80th Street, Americas Avenue, Jiménez Avenue, and 30th Avenue (also referred to as Norte Quito Sur or N.Q.S. for short). Routes for Suba Avenue and Southern Highway (Autopista Sur), the southern leg of the 30th Avenue, were opened in April 2006. The third phase of the system will cover 7th Avenue, 10th Avenue, and 26th Street (or Avenida El Dorado). The system is planned to cover the entire city by 2030. Although the Transmilenio carries commuters to numerous corners of the city, it is more expensive than any public transport except taxis, and fares increase with petroleum fuel prices. As of 2013 the price of a ticket was C$1750 (about US$0.85) on peak hours and
C$1400 during off-peak; however, a single ticket allows unlimited transfers until the passenger leaves the system, and passengers travel on feeder routes for free. Transmilenio does not yet cover some main routes, and buses are overcrowded.
Despite the city's chronic congestion, many of the ideas enacted during the Peñalosa years are regarded worldwide to be cost-effective, efficient and unique solutions. In addition to TransMilenio, the Peñalosa administration and voter-approved referenda helped to establish travel restrictions on cars with certain licence plate numbers during peak hours called Pico y placa; 121 kilometres (75 miles) of Ciclovía on Sundays; a massive system (376 km (234 mi) as of 2013) of bicycle paths and segregated lanes called ciclorrutas; and the removal of thousands of parking spots in an attempt to make roads more pedestrian-friendly and discourage car use. Ciclorrutas is one of the most extensive dedicated bike path networks of any city in the world, with a total extension of 376 kilometres (234 miles). It extends from the north of the city, 170th Street, to the south, 27th Street, and from Monserrate on the east to the Bogotá River on the west. The ciclorruta was started by the 1995–1998 Antanas Mockus administration with a few kilometers, and considerably extended during the administration of Mayor Peñalosa with the development of a Bicycle Master Plan and the construction of hundreds of kilometers.[85] Since the construction of the ciclorruta bicycle use in the city has increased.
Airports
editBogotá's principal airport is El Dorado International Airport, west of the city's downtown, at the end of Avenue El Dorado. Due to its central location in Colombia and in Latin America, it is a hub for domestic and international airlines. Currently the national airport has begun to take more responsibility due to the congestion at the international airport.
El Dorado is heavily congested, as it handles more passengers than its optimal capacity. Work on a major expansion of El Dorado airport started in September 2007 and finished in 2012 for the international terminal (the old terminal still serves national flights). When completed, this will expand capacity from the current 8 million passengers a year to 25 million.[86]
A secondary airport, Catam, serves as a base for Military and Police Aviation; there is also Guaymaral Airport, for private aviation activities.
Urban and suburban railways
editBrasília
editInternational airport
editBrasília–Presidente Juscelino Kubitschek International Airport serves the metropolitan area with major domestic and international flights. It is the third busiest Brazilian airport based on passengers and aircraft movements.[87] Because of its strategic location it is a civil aviation hub for the rest of the country. This makes for a large number of takeoffs and landings and it is not unusual for flights to be delayed in the holding pattern before landing. Following the airport's master plan, Infraero built a second runway, which was finished in 2006. In 2007, the airport handled 11,119,872 passengers.[87] The main building's third floor, with 12 thousand square meters, has a panoramic deck, a food court, shops, four movie theaters with total capacity of 500 people, and space for exhibitions. Brasília Airport has 136 vendor spaces.
The airport is located about 11 km (6.8 mi) from the central area of Brasília, outside the metro system. The area outside the airport's main gate are lined with taxis as well as several bus line services which connect the airport to Brasília's central district. The parking lot accommodates 1,200 cars.[88] The airport is serviced by domestic and regional airlines (TAM, GOL, Azul, WebJET, Trip and Avianca), in addition to a number of international carriers.
Brasília is improving its international connections and numerous non-stop flights provided by various airlines connect the city with cities throughout the world.
Metro
editMetrô de Brasília is Brasília's underground metro system. The subway system has 24 stations on two lines, the Orange and Green lines, distributed along a total network of 42 km (26 mi), covering most of the metropolitan area. Both lines begin at the Central Station and run parallel until the Águas Claras Station. The Brasília metro is not comprehensive, so buses may provide better access to the city center. The metro leaves the Rodoviária (bus station) and goes south, avoiding most of the political and tourist areas. The main purpose of the metro is to serve suburban neighborhoods, such as Samambaia, Taguatinga and Ceilândia, as well as Guará and Águas Claras. The satellite cities served are more populated in total than the Plano Piloto itself (the census of 2000 indicated that Ceilândia had 344,039 inhabitants, Taguatinga had 243,575, whereas the Plano Piloto had approximately 400,000 inhabitants), and most residents of the satellite cities depend on public transportation.[89]
High speed rail
editA high speed railway was planned between Brasília and Goiânia, the capital of the state of Goias, although it will probably be turned into a regional service linking these capital cities and cities in between, like Anápolis and Alexânia.[90]
Buses
editThe main bus hub in Brasília is the Central Bus Station, located in the crossing of the Eixo Monumental and the Eixão, about 2 km (1.2 mi) from the Three Powers Plaza. The original plan was to have a bus station as near as possible to every corner of Brasília. Today, the bus station is the hub of urban buses only, some running within Brasília and others connecting Brasília to the satellite cities. In the original city plan, the interstate buses should also stop at the Central Station. Because of the growth of Brasília (and corresponding growth in the bus fleet), today the interstate buses leave from the older interstate station (called Rodoferroviária), located at the western end of the Eixo Monumental. The Central Bus Station also contains a main metro station.
A new bus station was opened in July 2010. It is on Saída Sul (South Exit) near Parkshopping Mall and with its metro station, and it's also an inter-state bus station, used only to leave the Federal District.
Bratislava
editThe geographical position of Bratislava in Central Europe has long made it a natural crossroads for international trade traffic.[91]
Public transport in Bratislava is managed by Dopravný podnik Bratislava, a city-owned company. The transport system is known as Mestská hromadná doprava (MHD, Municipal Mass Transit) and employs buses, trams, and trolleybuses.[92] An additional service, Bratislavská integrovaná doprava (Bratislava Integrated Transport), links train and bus routes in the city with points beyond.
As a rail hub, the city has direct connections to Austria, Hungary, the Czech Republic, Poland, Germany and the rest of Slovakia. Petržalka and Bratislava hlavná stanica are the main stations. Main bus station (Autobusová stanica Mlynské Nivy or AS Mlynské Nivy) is located at Mlynské Nivy, east of city center and offers bus connections to cities in Slovakia and international bus lines.
The motorway system provides direct access to Brno in the Czech Republic, Trnava and other points in Slovakia, and Budapest in Hungary. The A6 motorway between Bratislava and Vienna was opened in November 2007.[93] The Port of Bratislava provides access to the Black Sea via the Danube and to the North Sea through the Rhine–Main–Danube Canal. M. R. Štefánik Airport is 9 kilometres (5.6 mi) north-east of the city centre. It served 2,024,000 passengers in 2007.[94] Bratislava is also served by the Vienna International Airport located 49 kilometres (30.4 mi) west of the city centre.
Brazzaville
editThe city is home to Maya-Maya Airport and a railway station on the Congo-Ocean Railway. It is also an important river port, with ferries sailing to Kinshasa and to Bangui via Impfondo. The Livingstone Falls lie on the outskirts of the city, where the Djoué River meets the Congo, rendering river transport to the coast impossible, qualifying the railway as a portage railway.
Taxis are available on every street and are easily recognized, being painted with a green body and white top, and the fare for a short trip is CF700. About twenty percent of the vehicles in Brazzaville are taxis. There are also collective taxis that drive certain routes and charge CF150.
Bridgetown
editThe city has access to daily flights via the island's Airport the Sir Grantley Adams International Airport (GAIA) located on the ABC Highway/Highway 7 in Seawell, Christ Church. The city of Bridgetown and New York City in the United States, were the only cities in the western hemisphere to be served by regularly scheduled British Airways Concorde flights. Additionally, the GAIA has been chosen as one of only four global display sites for the retired supersonic aircraft. The Airport is currently in the final stages of an expansion project, which will also include the construction of an aviation museum to house the retired Concorde aircraft.
All seven of Barbados's primary Highways begin close to the City of Bridgetown, in the Parish of Saint Michael. They all fan out to the north, south and east to other parts of the island. Driving is done of the left-hand side of the road with a speed limit of 60 km/h (37 mph) in built-up areas. The speed limit on the ABC Highway is generally 80 km/h (50 mph) except in built-up areas. Water transport is regulated by the Barbados Port Authority.
Public buses
editPublic buses that head northward to destinations such as Holetown and Speightstown, and to some locations in St. Michael including the University of the West Indies – (Cave Hill Campus), leave from the Princess Alice Bus Terminal which lies to the west of the city centre. Buses for points east and south leave from the Fairchild Street Bus Terminal, which is on the eastern edge of the city centre, near to the Queen Elizabeth Hospital (QEH).
Route taxis
editRoute taxis are privately owned minivans which operate as taxicabs for hire.
Brussels
editAir
editBrussels is served by Brussels Airport, located in the nearby Flemish municipality of Zaventem, and by the smaller Brussels South Charleroi Airport, located near Charleroi (Wallonia), some 50 km (30 mi) from Brussels.
Water
editBrussels also has its own port on the Brussels-Scheldt Maritime Canal located in the northwest of the city. The Brussels-Charleroi Canal connects Brussels with the industrial areas of Wallonia.
Train
editThe City of Brussels has three main train stations: Brussels South, Central and North, which are amongst the busiest of the country. Brussels South is also served by direct high-speed rail links: to London by the Eurostar train via the Channel Tunnel (1hr 51 min); to Amsterdam by the Fyra; to Amsterdam, Paris (1hr 25 min) and Cologne by the Thalys; and to Cologne and Frankfurt by the German ICE.
The City has minor railway stations at Bockstael, Brussels-Chapel, Brussels-Congres, Brussels-Luxembourg, Brussels-Schuman, Brussels-West, Haren, Haren-South, Simonis.
In the Brussels Region there are also railways stations at Berchem-Sainte-Agathe, Boitsfort, Boondael (Auderghem), Bordet (Evere), Etterbeek, Evere, Forest-East, Forest-South, Jette, Meiser (Schaarbeek), Moensberg (Uccle), Saint-Job (Uccle), Schaarbeek, Uccle-Calevoet, Uccle-Stalle, Vivier d'Oie-Diesdelle (Uccle), Merode and Watermael.
City public transport
editThe Brussels Metro dates back to 1976, but underground lines known as premetro have been serviced by tramways since 1968. A comprehensive bus and tram network also covers the city.
An interticketing system means that a MIVB/STIB ticket holder can use the train or long-distance buses inside the city. A single journey can include multiple stages across the different modes of transport. The commuter services operated by De Lijn, TEC and NMBS/SNCB will in the next few years be augmented by the Brussels RER/GEN network which will connect the capital and surrounding towns.
Since 2003 Brussels has had a car-sharing service operated by the Bremen company Cambio in partnership with the MIVB/STIB and local ridesharing company Taxi Stop. In 2006 shared bicycles were introduced, the scheme was subsequently being taken over by Villo!. In 2012 the Zen Car electric car-sharing scheme was launched in the university and European areas.
Road network
editIn medieval times Brussels stood at the intersection of routes running north-south (the modern Rue Haute/Hoogstraat) and east-west (Chaussée de Gand/Gentsesteenweg-Rue du Marché aux Herbes/Grasmarkt-Rue de Namur/Naamsestraat). The ancient pattern of streets radiating from the Grote Markt/Grand Place in large part remains, but has been overlaid by boulevards built over the River Senne, over the city walls and over the railway connection between the North and South Stations.
As one expects of a capital city, Brussels is the hub of the fan of old national roads, the principal ones being clockwise the N1 (N to Breda), N2 (E to Maastricht), N3 (E to Aachen), N4 (SE to Luxembourg) N5 (S to Rheims), N6 (SW to Maubeuge), N8 (W to Koksijde) and N9 (NW to Ostend).[95] Usually named chaussées/steenwegen, these highways normally run in a straight line, but on occasion lose themselves in a maze of narrow shopping streets.
The town is skirted by the European route E19 (N-S) and the E40 (E-W), while the E411 leads away to the SE. Brussels has an orbital motorway, numbered R0 (R-zero) and commonly referred to as the "ring" (French: ring Dutch: grote ring). It is pear-shaped as the southern side was never built as originally conceived, owing to residents' objections.
The city centre, sometimes known as "the pentagon", is surrounded by an inner ring road, the "small ring" (French: petite ceinture, Dutch: kleine ring ), a sequence of boulevards formally numbered R20. These were built upon the site of the second set of city walls following their demolition. Metro line 2 runs under much of these.
On the eastern side of the city, the R21 (French: grande ceinture, grote ring in Dutch) is formed by a string of boulevards that curves round from Laeken (Laken) to Uccle (Ukkel). Some premetro stations (see Brussels Metro) were built on that route. A little further out, a stretch numbered R22 leads from Zaventem to Saint-Job.
Bucharest
editPublic transport
editBucharest's public transport system is the largest in Romania and one of the largest in Europe. It is made up of the Bucharest Metro, as well as a surface transport system run by RATB (Regia Autonomă de Transport București), which consists of buses, trams, trolleybuses, and light rail. In addition, there is a private minibus system. As of 2007, there is a limit of 10,000 taxicab licenses.[96]
Railways
editBucharest is the hub of Romania's national railway network, run by Căile Ferate Române. The main railway station is Gara de Nord ("North Station"), which provides connections to all major cities in Romania as well as international destinations:
- Serbia: Belgrade
- Bulgaria: Sofia, Varna
- Moldova: Chișinău
- Ukraine: Kiev, Chernivtsi, Lviv
- Greece: Thessaloniki
- Austria: Vienna
- Hungary: Budapest
- Turkey: Istanbul
- Russia: Moscow
The city has five other railway stations run by CFR, the most important of which are Basarab (adjacent to North Station), Obor, Băneasa and Progresu. These are in the process of being integrated into a commuter railway serving Bucharest and the surrounding Ilfov County. Seven main lines radiate out of Bucharest.
Air
editBucharest has two international airports:
- Henri Coandă International Airport (IATA: OTP, ICAO: LROP), located 16.5 km (10.3 mi) north of the Bucharest city center, in the town of Otopeni, Ilfov. The airport has one terminal divided into two inter-connected buildings (Departures Hall and Arrivals Hall). The International Departures Hall consists of 36 check-in desks, one finger with 24 gates (14 equipped with jetways), while the Domestic Hall has an extra four gates. Today's Arrivals Hall is the old Otopeni terminal, while the new Departures Hall, including the finger and the airbridges, was built and inaugurated in 1997. An expansion of the finger was opened in March 2011, other expansions of Departure Hall and Arrivals Hall are underway and a new terminal on the east side is in project phase. The airport received 5,069,003 passengers in the first 8 months of 2012.
- Aurel Vlaicu International Airport (IATA: BBU, ICAO: LRBS) is Bucharest's business and VIP airport. It is situated only 8 km (5.0 mi) north of the Bucharest city center and is accessible by RATB buses 131, 335, 301, tramway 5 and Airport Express 783 and taxi. An extension of Line M2 of the Bucharest Metro to Aurel Vlaicu International, which will link it to the Main Train Station and the larger Henri Coandă International Airport, was approved in June 2006 and is in the planning stage. It was Bucharest's only airport until 1965, when the Otopeni Airport (today Henri Coandă International Airport) was converted to civilian use. Until March 2012 (when it was converted into a business airport), it was the second airport in Romania in terms of air traffic and Bucharest's low-cost hub. It was named after Aurel Vlaicu, a Romanian engineer, inventor, airplane constructor and early pilot. In 2012 this airport was closed due to the lobby made by non-low-cost companies (because Aurel Vlaicu, where low cost companies operated is closer to the ceter than Henri Coanda) and all the commercial activity was moved to Henri Coanda. Now it is used only for small private flights.
Roads
editBucharest is a major intersection of Romania's national road network. A few of the busiest national roads and motorways, link the city to all of Romania's major cities as well as to neighbouring countries such as Hungary, Bulgaria and Ukraine. The A1 to Pitești, the A2 Sun Motorway to the Dobrogea region and Constanta and the A3 to Ploieşti all start from Bucharest.
The city's municipal road network is centred around a series of high-capacity boulevards, which generally radiate out from the city centre to the outskirts. The main axes, which run north-south, east-west and northwest-southeast, as well as one internal and one external ring road, support the bulk of the traffic. The city's roads are usually very crowded during rush hours, due to an increase in car ownership in recent years. Every day, there are more than one million vehicles travelling within the city.[97] This results in wear and potholes appearing on busy roads, particularly secondary roads, this being identified as one of Bucharest's main infrastructural problems. There has been a comprehensive effort on behalf of the City Hall to boost road infrastructure and according to the general development plan, 2,000 roads have been repaired by 2008.[98] On 17 June 2011, the Basarab Overpass was inaugurated and opened to traffic, thus completing the inner city traffic ring. The overpass took 5 years to build and is the longest cable-stayed bridge in Romania and the widest such bridge in Europe;[99] upon completion, traffic on the Grant Bridge and in the Gara de Nord area became noticeably more fluid.[100]
Water
editAlthough it is situated on the banks of a river, Bucharest has never functioned as a port city, with other Romanian cities such as Constanța and Galați acting as the country's main ports. The unfinished Danube-Bucharest Canal, which is 73 km (45 mi) long and approximately 70% completed, could link Bucharest to the Danube River and, via the Danube-Black Sea Canal, to the Black Sea. Works on the canal were suspended in 1989, but there have been proposals to resume construction as part of the European Strategy for the Danube Region.[101]
Budapest
editAirport
editBudapest Liszt Ferenc International Airport, formerly called Budapest Ferihegy International Airport, which has only one passenger terminal: Ferihegy 2/A and Ferihegy 2/B connected with the Sky Court building. The airport is located to the east of the centre in the XVIII. district in Pestszentlőrinc. In March 2011, the Hungarian Government announced that the name of the Airport is to be changed from "Budapest Ferihegy International Airport" to "Budapest Liszt Ferenc International Airport".
Outside Budapest, there are alternative international airports in Debrecen, Sármellék, Győr-Pér and Pécs-Pogány, all of which can all be reached within three hours by train or bus.
Roads
editBudapest is the most important Hungarian road terminus; most of the major highways end near the city-limits. The road system in the city is designed in a similar manner to that of Paris, with several ring roads, and avenues radiating out from the center.
Ring road (beltway) M0 around Budapest is nearly completed, with only one section missing on the west side due to local disputes. Currently the beltway is around 80 kilometres (50 miles) in length, and once finished it will be near 100 kilometres (62 mi) of highway in length.
Public transport
editBudapest public transport is provided by BKV,[102] the company operates buses, trolleybuses, trams, suburban railway lines, the metro, a boat service, a cogwheel railway, a funicular, and a chairlift, called Libegő.
Budapest's tram network is extensive, and reliable despite poor track infrastructure and an ageing fleet. Routes 4 and 6 combined form the busiest traditional city tram line in the world, with the world's longest passenger trams (54-metre (177 ft) long Siemens Combino) running at 60 to 90 second intervals at peak time and 3–4 minutes off-peak and usually packed with people.
Day services operate from 4:30 am until 11:30 pm each day. Night traffic (a reduced overnight service) has a reputation for being excellent.
There are three metro lines and a fourth is currently under construction. The Yellow line, built in 1896, is one of the oldest subway lines in the world, following the London Underground built in 1863.
Railways
editHungarian main-line railways are operated by MÁV. There are three main railway termini in Budapest, Keleti (eastbound), Nyugati (westbound), and Déli (southbound), operating both domestic and international rail services. Budapest is one of the main stops of the Orient Express on its Central and Eastern European route.[103] There is also a suburban rail service in and around Budapest, operated under the name HÉV.
Waterways
editThe river Danube flows through Budapest on its way to the Black Sea. The river is easily navigable and so Budapest has historically been a major commercial port (at Csepel). In the summer months a scheduled hydrofoil service operates up the Danube to Vienna. BKV also provides public transport with boat service within the borders of the city. 3 route (marked D11-13) connects the 2 banks with Margaret Island and Hajógyári-sziget, from Római fürdő (Buda side, North to Óbudai sziget) or Árpád Bridge (Pest side) to Rákóczi Bridge, with a total of 15 stops. Several companies provides sightseeing boat trips and also an amphibious vehicle (bus and boat) operates constantly. The Pest side is also a famous port place with an international shipstation.
Special vehicles
editBeside metros, suburban rails, buses, trams and boats, there are a couple of less usual vehicles in Budapest:
- trolleybus on several lines in Pest
- the Castle Hill Funicular between the Chain Bridge and Buda Castle
- cyclecar for rent in Margaret Island
- chairlift
- the Budapest Cog-wheel Railway
- children's railway[102]
The latter three vehicles run among Buda hills.
Buenos Aires
editLocal roads and personal transport
editBuenos Aires is based on a square, rectangular grid pattern, save for natural barriers or the relatively rare developments explicitly designed otherwise (notably, the neighbourhood of Parque Chas). The rectangular grid provides for square blocks named manzanas, with a length of roughly 110 meters. Pedestrian zones in the city centre, like Florida Street are partially car-free and always bustling, access provided by bus and the Metro (subte) Line C. Buenos Aires, for the most part, is a very walkable city and the majority of residents in Buenos Aires use public transport.
Two diagonal avenues in the city centre alleviate traffic and provide better access to Plaza de Mayo. Most avenues running into and out of the city centre are one-way and feature six or more lanes, with computer-controlled green waves to speed up traffic outside of peak times.
The city's principal avenues include the 140-metre (459 ft)-wide 9 de Julio Avenue, the over-35 km (22 mi)-long Avenida Rivadavia,[104] and Avenida Corrientes, the main thoroughfare of culture and entertainment.
In the 1940s and 1950s the Avenida General Paz beltway that surrounds the city along its border with Buenos Aires Province and freeways leading to the new international airport and to the northern suburbs heralded a new era in Buenos Aires traffic. Encouraged by pro-automaker policies pursued towards the end of the Perón (1955) and Frondizi administrations (1958–62) in particular, auto sales nationally grew from an average of 30,000 during the 1920–57 era to around 250,000 in the 1970s and over 600,000 in 2008.[105] Today, over 1.8 million vehicles (nearly one-fifth of Argentina's total) are registered in Buenos Aires.[106]
Toll motorways opened in the late 1970s by then-mayor Osvaldo Cacciatore provided fast access to the city centre and are today used by over a million vehicles daily.[107] Cacciatore likewise had financial district streets (roughly one square kilometre in area) closed to private cars during daytime. Most major avenues are, however, gridlocked at peak hours. Following the economic mini-boom of the 1990s, record numbers started commuting by car and congestion increased, as did the time-honored Argentine custom of taking weekends off in the countryside.
Cycling
editIn December 2010, the city government launched a bicycle sharing program with bicycles free for hire upon registration. Located in mostly central areas, there are 21 rental stations throughout the city providing over 700 bicycles to be picked up and dropped off at any station within an hour.[108] The bike-share program runs from 8:00 am to 8:00 pm Monday through Friday and from 9:00 am to 3:00 pm on Saturdays. As of 2012, the city has constructed 70 km (43.50 mi) of protected bicycle lanes and has plans to construct another 100 km (62.14 mi).[109]
Local public transport
edit
-
Buenos Aires Taxi
-
Buenos Aires Colectivo
-
Commuter rail in Buenos Aires
Commuter rail
editThe Buenos Aires commuter rail system has seven lines:
The Buenos Aires commuter network system is very extensive: every day more than 1.3 million people commute to the Argentine capital. These suburban trains operate between 4 am and 1 am. The Buenos Aires railway system also connects the city with long-distance rail to Rosario and Córdoba, among other metropolitan areas. There are four principal terminals for both long-distance and local passenger services in the city centre: Constitucion, Retiro, Federico Lacroze and Once.
Underground
editThe Buenos Aires Underground (locally known as subte, from "subterráneo" meaning underground or metro), is a high-yield system providing access to various parts of the city. Opened in 1913, it is the oldest underground system in the Southern Hemisphere and second oldest in the Spanish-speaking world after Madrid's in Spain. The system has six lines, named by letters (A to E, and H) There are 74 stations, and 52.3 km (32 mi) of route. An expansion program is underway to extend existing lines into the outer neighborhoods and add a new north-south line. Route length is expected to reach 89 km (55 mi) by 2011. Line "A" is the oldest one (service opened to public in 1913) and stations kept the "belle-époque" decoration, the trains still sport incandescent-bulb illumination and doors must be manually opened by the passengers, as in 1913. Daily ridership on weekdays is 1.7 million and on the increase.[110][111] Fares remain relatively cheap, although the city government hiked the fares by over 125% in January 2012. A single journey, with unlimited interchanges between lines, now costs AR$2.50, which is roughly USD$0.60.[112] The Buenos Aires Underground has six lines which also have links to the commuter rail.[113]
Current renovation and expansion
editThe subway is currently undergoing renovation and expansion.
- At Line A two new stations after Carabobo are under construction, being Nazca the new future terminal while newer metro carriages are slowly being introduced to handle the increased demand.
- On Line B Since 2004, work began to expand the line to Villa Ortúzar and Villa Urquiza.[114]
- On Line H further extensions are planned to run from Retiro to Nueva Pompeya once constructed. It will connect the Southern part of the city with the North, thus improving the flow to the centre of the city, and will be approximately 11 km (6.8 mi) long from end to end. The Line H will provide cross-connections with almost all the other lines.[115]
- On Line E work has begun in 2009 to expand the line up to Retiro.[116]
Planned underground lines
editNew underground lines are planned and were presented by the Government of the City of Buenos Aires on 26 May 2007. There are currently three lines planned:
- Line F would join Constitución Station with Plaza Italia and would have an extension of 7.6 km (4.7 mi). It would be transverse-radial, according to the section, with strong integration with the rest of the network.
- Line G would connect the Retiro Station with the Cid Campeador and would have a length of 7.6 km (4.7 mi). It would be radial to connect the axes of high-density residential and commercial areas, and would bring the underground to the northwest of the city.
- Line I would run from the Emilio Mitre (Line E) Station to Plaza Italia, a distance of 7.3 km (4.5 mi). It would be the outermost transverse line of the network and would link the neighborhoods of the north, center and south of the city and link with the radial lines far from the city centre.
Tramways
editBuenos Aires had an extensive street railway (tram) system with over 857 km (533 mi) of track, which was dismantled during the 1960s in favour of bus transportation, but surface rail transport has made a small comeback in some parts of the city. The PreMetro or Line E2 is a 7.4 km (4.6 mi) light rail line that connects with Metro Line E at Plaza de los Virreyes station and runs to General Savio and Centro Cívico. It is operated by Metrovías. The official inauguration took place on 27 August 1987.
A 2 km (1.2 mi) modern tramway, the Tranvía del Este, opened in 2007 in the Puerto Madero district, using two tramcars on temporary loan. However, plans to extend the line and acquire a fleet of trams did not come to fruition, and declining patronage led to the line's closure in October 2012.[117] A heritage streetcar maintained by tram fans operates on weekends, near the Primera Junta line A metro station in the Caballito neighbourhood.
Buses
editThere are over 150 city bus lines called Colectivos, each one managed by an individual company. These compete with each other, and attract exceptionally high use with virtually no public financial support.[118] Their frequency makes them equal to the underground systems of other cities, but buses cover a far wider area than the underground system. Colectivos in Buenos Aires do not have a fixed timetable, but run from four to several per hour, depending on the bus line and time of the day. With inexpensive tickets and extensive routes, usually no further than four blocks from commuters' residences, the colectivo is the most popular mode of transport around the city.[118]
Buenos Aires has recently opened a two-lane 12 km (7.5 mi), bus rapid transit system, the MetroBus. The system uses modular median stations that serve both directions of travel, which enable pre-paid, multiple-door, level boarding. The system runs across the Juan B. Justo Ave has 21 stations and was inaugurated on 31 May 2011.[119]
Taxis
editA fleet of 40,000 black-and-yellow taxis ply the streets at all hours. License controls are not enforced rigorously. There have been reports of organized crime controlling the access of taxis to the city airports and other major destinations. Taxi drivers are known for trying to take advantage of tourists.[120] Radio-link companies provide reliable and safe service; many such companies provide incentives for frequent users. Low-fare limo services, known as remises, have become popular in recent years.[121][122]
Intercity transport
editHigh-speed rail
editA new high-speed rail line between Buenos Aires, Rosario and Córdoba, with speeds up to 320 km/h (200 mph) is planned.[123]
Long-distance bus terminal
editThe main terminal for long-distance buses is Retiro bus station, near Retiro railway station, from where buses depart for all parts of Argentina and for neighbouring countries.
Ferries
editBuenos Aires is also served by a ferry system operated by the company Buquebus that connects the port of Buenos Aires with the main cities of Uruguay, (Colonia del Sacramento, Montevideo and Punta del Este). More than 2.2 million people per year travel between Argentina and Uruguay with Buquebus. One of these ships is a catamaran, which can reach a top speed of about 80 km/h (50 mph), making it the fastest ferry in the world.[124]
Airports
editThe Buenos Aires international airport, Ministro Pistarini International Airport, is located in the suburb of Ezeiza and is often called "Ezeiza". The Aeroparque Jorge Newbery airport, located in the Palermo district next to the riverbank, serves only domestic traffic and flights to Brazil, Chile, Paraguay and Uruguay. A smaller San Fernando Airport serves only general aviation.
Notes
edit- ^ Meidment, Neil (3 March 2011). "Manganese Bronze seals biggest London taxi order". Reuters. Retrieved 4 March 2011.
- ^ Jaglom, Ben. "Manganese takes black cab to Azerbaijan". Retrieved 4 March 2011.
- ^ "1,000 London taxis for Azerbaijan". Retrieved 4 March 2011.
- ^ "British firm wins £16m Azerbaijan order for its Chinese built taxis". Retrieved 4 March 2011.
- ^ "Baku Metro Chief: "Baku-Sumgait metro line is not planned"". En.apa.az. Retrieved 17 April 2010.
- ^ "41 new underground stations to be constructed in Azerbaijani capital in the next 17 years". Today.az. 10 October 2008. Retrieved 14 August 2009.
- ^ "Azerbaijan Business Center - Azerbaijan to introduce a single payment card for public transport". Abc.az. 2011-12-29. Retrieved 2013-03-12.
- ^ "Azerbaijani FM: Baku-Tbilisi-Kars railroad to be built in 2012". trend.az. Retrieved 26 January 2011.
- ^ Railway Gazette International February 2009 p54 with map
- ^ "Baku Sea Port expects for passenger trip Anzali-Baku". En.trend.az. 18 February 2010. Retrieved 17 April 2010.
- ^ "Ferry Service across Caspian sea". Azerbaijan24.com. Archived from the original on 29 March 2010. Retrieved 17 April 2010.
- ^ "Baku Sea Port". Bakuseaport.az. Archived from the original on 16 April 2008. Retrieved 7 March 2008.
- ^ "Azerbaijan, Baku". m-hesse.com. Retrieved 1 February 2011.
- ^ "Heydar Aliyev International Airport (BAK/UBBB), Baku, Azerbaijan". Airport-technology.com. Archived from the original on 12 March 2010. Retrieved 17 April 2010.
- ^ Fevralın 14-ü Azərbaycan Hərbi Hava Qüvvələrinin (HHQ) yaranma günüdür (in Azerbaijani)
- ^ a b Composante aéroport Bamako-Sénou, Proposition MCA-Mali (2006)
- ^ a b "Air traffic at Bamako airport increases by 14% in 2008". PANA press. 2009-01-14
- ^ « Troisième pont de Bamako : le compte à rebours a commencé », L'Essor, 19 November 2007.
- ^ "Department of Civil Aviation – Brunei Darussalam – Lists of Airlines". Retrieved 10 May 2010.
- ^ "สรุปรายได้และปริมาณรถ: สิงหาคม 2555 (Revenue and traffic, August 2012)". EXAT website (in Thai). Expressway Authority of Thailand. 4 September 2012. Retrieved 11 September 2012.
- ^ "Developing Integrated Emission Strategies for Existing Land-transport" (PDF). Clean Air Initiative. Retrieved 15 September 2012.
- ^ "In Bangkok gridlock, Thai traffic police double as midwives". AFP. 17 April 2008. Retrieved 22 September 2012.
- ^ Tanaboriboon, Yordphol (1993). "Bangkok traffic" (PDF). IATSS Research. 7 (1). Retrieved 15 September 2012.
- ^ Fuller, Thomas (23 February 2007). "Bangkok's template for an air-quality turnaround". New York Times. Retrieved 15 September 2012.
- ^ Traffic and Transportation Department, p. 154.
- ^ Traffic and Transportation Department, pp. 110–112.
- ^ Transport Statistics Sub-division, Planning Division. "Number of Vehicles Registered in Thailand as of 31 August 2012". Department of Land Transport website. Department of Land Transport. Retrieved 16 September 2012.
- ^ Sereemongkonpol, Pornchai (14 September 2012). "Bangkok's best taxi drivers". Bangkok Post. Retrieved 16 September 2012.
- ^ "กรมการขนส่งทางบก ระบุเพียง 11 วันของการเริ่มโครงการ "ยกเครื่อง แท็กซี่ไทย"..." (PDF) (Press release). Public Relations Subdivision, Department of Land Transport. 14 June 2012. Retrieved 16 September 2012.
{{cite press release}}
:|first=
missing|last=
(help) - ^ Rujopakarn, Wiroj (October 2003). "Bangkok transport system development: what went wrong?". Journal of the Eastern Asia Society for Transportation Studies. 5: 3302–15.
- ^ Traffic and Transportation Department, pp. 113–122.
- ^ Sukdanont, Sumalee (July 2011). "ท่าเรือกรุงเทพ". Transportation Institute, Chulalongkorn University. Retrieved 19 September 2012.
- ^ "สรุปผลการดำเนินงานของกทท. 8 เดือน ปีงบประมาณ 2553 (ต.ค.52-พ.ค.53)" (PDF). PAT website. Port Authority of Thailand. Retrieved 19 September 2012.
- ^ Rogers, Simon (4 May 2012). "The world's top 100 airports: listed, ranked and mapped". The Guardian.
- ^ "In With the Old", Aviation Week & Space Technology, 1 January 2007.
- ^ Mahitthirook, Amornrat (1 October 2012). "Don Mueang airport reopens". Bangkok Post. Retrieved 11 October 2012.
- ^ Kositchotethana, Boonsong (4 September 2012). "Suvarnabhumi expansion to accelerate, finish in 2016". Bangkok Post. Retrieved 17 September 2012.
- ^ a b Eur 2003, p. p200-202.
- ^ Booth, McDuell & McDuell 1999, p. 57.
- ^ Ham 2010, p. 547.
- ^ "Central African Republic". Finance and trade. Encyclopaedia Britannica. Retrieved 31 March 2013.
- ^ Runge 2007, p. 279.
- ^ Eur 2002, p. 185.
- ^ "The Scenic Railroad - Basseterre - Real Travel". Retrieved 2010-11-03.
- ^ (Chinese) "北京市火车站大全" Last Accessed 8 August 2011
- ^ "Beijingers spend lives on road as traffic congestion worsens". China Daily. Xinhua News Agency. 6 October 2003. Retrieved 22 July 2009.
- ^ "Automobile numbers could be capped". China Daily. Retrieved 13 May 2010.
- ^ "Beijing city to have five mln cars on roads by year end". Gasgoo. 12 May 2010. Retrieved 13 May 2010.
- ^ "To Tackle Traffic Jam, Beijing Sets New Car Plate Quota, Limits Out-of-Towners". ChinaAutoWeb.com.
- ^ "China plans to build world's biggest airport near Beijing". In.news.yahoo.com. 10 September 2011. Retrieved 31 October 2011.
- ^ "Beijing's second airport to be ready by 2017". english.eastday.com. 22 June 2011.
- ^ "Beijing grants three-day visa-free access". TTGmice. December 6, 2012. Retrieved 7 December 2012.
- ^ "30 subway lines to cover Beijing by 2020". China Daily. 28 May 2010. Retrieved 30 May 2010.
- ^ Watts, Jonathan (24 January 2010). "Campaign to boost cycling in Beijing". The Guardian. UK. Retrieved 10 March 2011.
- ^ a b "Transportation & Communication". Ikamalebanon.com. Archived from the original on 2 January 2010. Retrieved 2010-01-17.
- ^ Beirut Transport[dead link ]
- ^ "Statistics". Public Transport Company "Belgrade". Retrieved 19 May 2007.
- ^ Cite error: The named reference
Beograd-invest
was invoked but never defined (see the help page). - ^ "Belgrade Bypass, Serbia". CEE Bankwatch network. Archived from the original on 4 March 2007. Retrieved 19 May 2007.
- ^ "1. faza prve deonice Unutrašnjeg magistralnog poluprstena" (PDF) (in Serbian). Belgrade Direction for Building and Real Estate Land/EBRD. 1 July 2005. Archived from the original (PDF) on 9 August 2007. Retrieved 15 September 2007.
- ^ "Luka Beograd AS – Istorijat" [History of the Port of Belgrade] (in Serbian). Port of Belgrade. Retrieved 11 October 2010.
- ^ "Airports and Flying fields". Aviation guide through Belgrade. Retrieved 5 May 2009.
- ^ "Regionalni centar putničkog i kargo saobraćaja" (in Serbian). Danas. 20 May 2005. Retrieved 10 July 2007.
- ^ "www.beg.aero | Nikola Tesla Belgrade Airport | News". Airport-belgrade.rs. Retrieved 7 July 2009.
- ^ "Aerodrom Nikola Tesla | News". Beg.aero. Retrieved 2013-03-12.
- ^ "Železnice Srbije – Red voznje za Beovoz i BG:VOZ". Serbian railways.
- ^ "Grad Beograd – Beovoz". Beograd.rs. Retrieved 2013-05-15.
- ^ "Broke but dynamic, Berlin seeks new identity". IHT. Retrieved 19 August 2008.
- ^ Cite error: The named reference
factsheet
was invoked but never defined (see the help page). - ^ "Kraftfahrzeuge und Schienenbestand". Destatis. Retrieved 19 August 2008.
- ^ "Die Hauptstadt des umweltfreundlichen Verkehrs". Berliner Zeitung (in German). Retrieved 11 August 2009.
- ^ "Berlin Hauptbahnhof". Deutsche Bahn. Retrieved 2 May 2009.
- ^ Amt für Statistik Berlin-Brandenburg, Die kleine Berlin-Statistik. (German) Accessed 6 January 2009.
- ^ Cite error: The named reference
statoffice
was invoked but never defined (see the help page). - ^ "Airport BBI: Einzigartige, historische Chance für Berlin und Brandenburg". airportzentrale.de. Retrieved 10 March 2011.
- ^ "Airport Berlin Brandenburg International". Airports Berlin. Retrieved 7 July 2010.
- ^ "New Berlin Airport to Finally Open Next October". Spiegel Online International. 4 September 2012.
- ^ New York Times online article on the delayed Berlin Brandenburg Airport
- ^ "Bike City Berlin". Treehugger. Retrieved 19 August 2008.
- ^ "Platz da! – für die Radfahrer". ND. Retrieved 22 March 2011.
- ^ "Bicycle Routes and Facilities Bicycle Paths". Senate Department of urban development. Retrieved 19 September 2008.
- ^ "Маршрут поезда ????? - ????? на сайте". Poezda.net. Retrieved 21 November 2012.
- ^ "Bogotá Transportation Terminal & Train Station" (in Spanish). Bogotá-dc.com. 2008. Retrieved 29 December 2008.
- ^ "Millonaria condena al Distrito por fallas en Transmilenio" (in Spanish). El Espectador. 2008. Retrieved 29 December 2008.
- ^ "Bogotanos olvidaron para qué fue creado el Día sin carro" (in Spanish). Cambio. 2 November 2008. Retrieved 29 December 2008.
- ^ "Cinco firmas de disputan la modernización del aeropuerto El Dorado" (in Spanish). Caracol Radio. 2006. Retrieved 29 December 2008.
- ^ a b Airport Statistics for 2007 http://www.infraero.gov.br/upload/arquivos/movi/mov.operac.1207.pdf
- ^ "Brasilia International Airport – facts". Aboutbrasilia.com. January 4, 2007. Retrieved April 17, 2010.
- ^ Brasília Metro
- ^ Fábio Amato Do G1, em Brasília (2012-06-28). "G1 - Estudo vai apontar viabilidade de trem entre Brasília, Anápolis e Goiânia - notícias em Distrito Federal". G1.globo.com. Retrieved 2013-03-12.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ "Bratislava". Encyclopædia Britannica. 2007. Retrieved April 30, 2007.
- ^ "Trasy liniek (routes)" (in Slovak). Dopravný podnik Bratislava. 2007. Retrieved May 17, 2007.
- ^ "Vienna-Bratislava in 50 Minutes (Wien – Bratislava in 50 Minuten)" (in German). ORF. October 19, 2007. Retrieved 2007-10-19.
- ^ "Airport served more than 2 million passengers last year (Letisko vybavilo vlani viac ako 2 milióny pasažierov)" (in Slovak). TASR, published in Bratislavské Noviny. January 13, 2008. Retrieved January 13, 2008.
- ^ "Belgian N roads". Autosnelwegen.net. Retrieved 29 June 2010.
- ^ "Săptămâna Financiară | Anchete | Atacul clonelor in taximetria bucuresteana". Sfin.ro. Retrieved 7 July 2009.
- ^ "Governing programme of Adriean Videanu, General Mayor of Bucharest". Videanu.ro. Retrieved 14 April 2011.
- ^ Rehabilitation of Urban Roads, Phase II, from the site of the General Mayor of Bucharest, Adriean Videanu
- ^ Noutati (28 April 2007). "Bucureștenii beneficiază de cel mai mare punct intermodal din România! « Pasajul Basarab". Pasajulbasarab.ro. Retrieved 15 September 2011.
- ^ "VIDEO Primele efecte ale Pasajului Basarab: Cum s-a degrevat traficul de pe Podul Grant si din zona Garii de Nord – Esential". HotNews.ro. Retrieved 15 September 2011.
- ^ "Danube-Bucharest Canal vs. the Global Crisis". 13 December 2010.
- ^ a b Rail, Evan (12 August 2007). "36 Hours in Budapest". The New York Times. Retrieved 2008-01-29.
- ^ "Orient Express Destinations". Retrieved 2012-04-16.
- ^ 'Avenida Rivadavia:Un largo recorrido de contrastes' by Nora Sánchez, Clarín, 26 February 2006
- ^ IntermediaSP. 2007. "ADEFA". ADEFA. Retrieved 9 August 2009.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ DNRPA[dead link ]
- ^ "SS PP'!A1". Retrieved 9 August 2009.
- ^ Name (5 October 2011). "Tag Archive | mejor en bici". The Argentina Independent. Retrieved 2 May 2012.
- ^ "Buenos Aires, mejor en bici". Mejorenbici.buenosaires.gob.ar. Retrieved 2 May 2012.
- ^ "Cuadros de Pasajeros". Retrieved 1 June 2011.
- ^ "Metrovías en Números". Retrieved 1 June 2011.
- ^ "Desde mañana, el boleto de subte costará $2,50". tn.com.ar. TN. Retrieved 15 March 2012.
- ^ "> South America> Argentina> Buenos Aires Subte (Metro)". UrbanRail.Net. Retrieved 25 March 2010.
- ^ History: La Línea B (Spanish)
- ^ "Un nuevo subte unirá Pompeya con Retiro". lanacion.com. Retrieved 25 March 2010.
- ^ "Retorna la actividad en la línea E a Retiro". enelSubte.com. 13 April 2009. Retrieved 25 March 2010.[dead link ]
- ^ Tramways & Urban Transit, January 2013, p. 29. UK: LRTA Publishing.
- ^ a b "Transportation Research Board, Buenos Aires Colectivo Buses and Experience with Privatization". Trb.metapress.com. 15 January 2007. Retrieved 9 August 2009.
- ^ El metrobús ya une Palermo con Liniers, La Nación, 1 June 2011
- ^ "La Nacion article". La Nacion article. Retrieved 9 August 2009.
- ^ "Argentina Handbook Transportation". Argentina.gotolatin.com. Retrieved 25 March 2010.
- ^ "Radiotaxis & Remises de Argentina". Radiotaxisyremises.com.ar. 22 February 2007. Retrieved 25 March 2010.
- ^ Argentina sets a new course. Railway Gazette International August 2007.
- ^ "Buquebus". Buquebus. Retrieved 9 August 2009.