Manjunath Nagar metro station

Manjunath Nagar is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the suburb of Nelamangala in Karnataka.

Manjunath Nagar
Namma Metro station
General information
LocationTumkur Road, Manjunath Nagar, Bagalkunte, Bengaluru, Karnataka 560073
Coordinates13°03′00″N 77°29′40″E / 13.0501368°N 77.4944134°E / 13.0501368; 77.4944134
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Accessible(TBC)
ArchitectSimplex Infrastructure
Other information
StatusOperational & Staffed
Station code(TBC)
History
Opened7 November 2024; 37 days ago (7 November 2024)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Chikkabidarakallu
towards Madavara
Green Line Nagasandra
Location
Map

The Madavara - Nagasandra stretch trial run was conducted on August 6 2024[1][2] and with approval from Commissioner of Metro Railway Safety (CMRS) received on October 4, the section finally opened to public on 7 November 2024, with the formal inauguration to be done at a later stage. [3][4][5][6][7]

Station layout

edit
Manjunath Nagar track layout
 
 
 
 
P1
 
 
 
P2
 
 
 
 
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform 2
Southbound
Towards → Silk Institute
Next Station: Nagasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Chikkabidarakallu
Side platform | Doors will open on the left  
L2

Entry/Exits

edit

See also

edit

References

edit
  1. ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
  2. ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  3. ^ "Day before public launch, DK Shivakumar takes metro ride to Madavara". Deccan Herald. Retrieved 7 November 2024.
  4. ^ "After 7 years, extended Green Line opens today". The Times of India. 6 November 2024. ISSN 0971-8257. Retrieved 7 November 2024.
  5. ^ "Extended Metro green line from Nagasandra to Madavara inaugurated - Public TV English". 6 November 2024. Retrieved 7 November 2024.
  6. ^ "Extended Namma Metro Green Line operation launch likely on November 6". The Times of India. 5 November 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  7. ^ "Bengaluru Metro's Green Line extension set to open on Nov 7". Deccan Herald. Retrieved 6 November 2024.
edit