New Mexico Rail Runner Express

(Redirected from MRCOG)

The New Mexico Rail Runner Express (AAR reporting mark NMRX) is a commuter rail system serving the metropolitan areas of Albuquerque and Santa Fe, New Mexico. It is administered by the New Mexico Department of Transportation (NMDOT) and the Rio Metro Regional Transit District (Rio Metro), a regional transportation agency, while Herzog Transit Services currently[when?] holds the contract for the operation and maintenance of the line & equipment. Phase I of the system, operating on an existing right-of-way from Belen to Bernalillo that NMDOT purchased from BNSF Railway, opened in July 2006. Phase II, the extension of the line to Santa Fe, opened in December 2008. Daily ridership, as of February 2019, was 2,200 trips per day. In 2023, the system had a ridership of 584,400, or about 2,800 per weekday as of the third quarter of 2024.

New Mexico Rail Runner Express
New Mexico Rail Runner Express at La Bajada Hill
New Mexico Rail Runner Express at La Bajada Hill
Overview
OwnerNMDOT
LocaleAlbuquerque, New Mexico
(metropolitan area)
Transit typeCommuter rail
Number of lines1
Number of stations15
Daily ridership2,800 (weekdays, Q3 2024)[1]
Annual ridership584,400 (2023)[2]
Websiteriometro.org
Operation
Began operationJuly 14, 2006
Operator(s)Rio Metro,[3]
Herzog Transit Services Inc.
Reporting marksNMRX
Technical
System length97 miles (156 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Top speed79 mph (130 km/h)[4]
Route diagram

Santa Fe Depot
South Capitol
Zia Road
Fare Zone F
Fare Zone E
Santa Fe County/NM 599
Fare Zone E
Fare Zone D
Kewa Pueblo
Fare Zone D
Fare Zone C
Sandoval County/US 550
Downtown Bernalillo
Fare Zone C
Fare Zone B
Sandia Pueblo
Los Ranchos/​Journal Center
Montaño
Downtown Albuquerque Amtrak
Lobo Special Events Platform
Bernalillo County/​International Sunport
Isleta Pueblo
Fare Zone B
Fare Zone A
Rio Grande
Los Lunas
Belen
Disabled access All stations are accessible

Sources[5][6]

History

edit

The concept of passenger rail serving the Central New Mexico corridor had been discussed for decades, but it was not until August 2003, when New Mexico Governor Bill Richardson announced that his administration was going to pursue the implementation of commuter rail service, that a serious effort got underway. Later that same year, grants were given to NMDOT and MRCOG to begin the effort, and the New Mexico State Legislature passed Governor Richardson's Investment Partnership (GRIP), a transportation improvement package with the Rail Runner included as one of the bill's projects.

Over the next few years, NMDOT and the Mid-Region Council of Governments (MRCOG) developed a strategy for implementing the rail service. In 2005, a name and a branding scheme was chosen. The name “Rail Runner” is a play on the name of New Mexico's state bird, the roadrunner. The cars and locomotives were received throughout the year of 2005 and groundbreaking for the first Rail Runner station took place on October 31, 2005. During this time the state also conducted negotiations with BNSF over the use of the railroad track. After assessing the needs of the track, the state of New Mexico committed to purchasing the railroad corridor from Belen to the New Mexico-Colorado border from BNSF (although, thus far only the portion between Belen and Lamy, NM has been purchased)[citation needed], to ensure that commuter trains would always get the right-of-way and have priority over freight trains in the corridor. While the engines are capable of 110 miles per hour (180 km/h), the track limits the maximum speed to 79 miles per hour (127 km/h).[4]

The Rail Runner officially went into service on July 14, 2006, serving the Downtown Albuquerque, Los Ranchos, and Sandoval County stations. On December 11, 2006, the Los Lunas station opened, and on February 2, 2007, the Belen station opened, extending the line to its southern end. In April 2007, two more stations opened: Bernalillo County/International Sunport on the 20th and Downtown Bernalillo on the 27th. On December 17, 2008, the Isleta Pueblo station opened.[7]

Phase II

edit

Phase II, the extension of the line to Santa Fe, opened for service on December 17, 2008. Using the existing Santa Fe Southern Railway track from Lamy to Santa Fe, which is filled with sharp curves, would have required the train to slow to 15 miles per hour (24 km/h) in some places, so new tracks were laid to allow travel times comparable to the automobile. The route uses previously existing track from Bernalillo to the base of La Bajada, a hill south of Santa Fe. It then runs on newly built track on a new right-of-way from CP Madrid, for five miles and then in the I-25 median into Santa Fe, at CP Hondo, where it uses an improved Santa Fe Southern Railway track from I-25 to the terminal at the Santa Fe Railyard.[8] Two of the planned stations for the Phase II extension opened on December 17: the South Capitol and the Santa Fe Depot stations. A third station at the NM 599/I-25 interchange in Santa Fe County opened on August 1, 2009.

After the opening of the Phase II stations, several more stations opened. Sandia Pueblo station, serving Sandia Pueblo, opened on August 29, 2011.[9] The last planned station in Bernalillo County, the Montaño station, officially opened on April 7, 2014. Kewa Pueblo station, serving Santo Domingo Pueblo, opened on March 22, 2010.[10] It is the first station beyond the original 13 planned stations to reach the construction stage and was built using stimulus funds. On September 12, 2009, a special events platform opened for Lobo games service only.[11]

At the end of March in 2014, the Rail Runner added security officers to the system. Officers are charged with protecting the trains, inspecting fares, and addressing issues at the stations and parking lots. They are required to wear and use lapel cameras during incidents.[12][13]

Construction of the platform at the Zia Road station, the last of the four planned stations for Phase II, was completed several years in advance of the station's opening in April 2017.[14]

COVID-19 pandemic

edit

Rail Runner service was suspended from March 2020 until March 2021 due to the COVID-19 pandemic. During the suspension, Rio Metro continued to run empty trains along the route in order to maintain readiness of the vehicles and crew.[15] Weekday service resumed March 8, 2021, and full service resumed May 24, 2021.

By April 2022, daily ridership had returned to 60% of pre-pandemic levels. To attract new riders, Rio Metro announced it would slash fares by 75%—daily passes priced at $2.50 and monthly passes at $27.50—from April 18 through July 31.[16] During this period, average ridership increased about 88% to over 1,500 boardings per day. Citing the high cost of gas, Governor Michelle Lujan Grisham announced in July that the reduced fares would be extended until the end of 2022. In addition, two round trips would be added on August 1 as part of a revised schedule focused on all-day frequency rather than traditional commuter service.[17]

Criticism

edit

The cost of the Rail Runner system was $135 million for the first phase and around $250 million for the second phase.[18] Preliminary estimates indicated that the service would operate at a deficit, requiring up to $10 million in government funding annually.[19] In late 2007, the Rail Runner was the subject of more criticism as a transportation funding shortfall left many state road projects stalled. State officials said the rising cost of construction materials and decreased federal support were the cause, but some lawmakers cited the cost of the Rail Runner as a contributing factor for the shortfall.[20] Supporters of Rail Runner funding note that roadways and other infrastructure for passenger cars also operate at a deficit, requiring government funding for construction, operation, and maintenance.[21]

Funding

edit

The capital costs of the Rail Runner project were covered by state and local funds. Funding for operations of the system in its first few years was covered largely by federal Congestion Mitigation and Air Quality Improvement (CMAQ) Program funds, along with ticket revenues and some state and local funds. Operational costs were expected to rise from $10 million for the first phase to $20 million after completion of the second phase.[22]

Federal funding for the Rail Runner was expected to stop in 2009. Two separate gross receipts taxes for regional transit were approved by voters in central and north-central New Mexico in November 2008 to cover a large portion of the operational funds of the Rail Runner. Additional funds also come from bond revenue and money appropriated by the New Mexico State Legislature.[23]

Proposed expansion

edit

The Environmental Assessment for Phase II considered placement of a station between Cerrillos Road and Richards Avenue in the I-25 median; it concluded that there was not yet enough demand, but recommended that it be considered for the future. A station near the Las Soleras development was studied in 2010.[24]

An extension northward to Taos was proposed in the state legislature in 2009.[25] An extension south to Las Cruces and El Paso has also been proposed. A memorandum to study the feasibility of such service was introduced in the state legislature in 2009, and was amended to study Las Cruces-El Paso service, but failed to pass in the New Mexico Legislature.[26] A federal house resolution was introduced by Congressman Harry Teague in May 2009 to study the concept, but did not get out of committee.[27]

Ridership

edit
 
Rail Runner cab car
Ridership figures[28]
Fiscal year Total riders
2007 485,150
2008 541,547
2009 1,081,719
2010 1,239,805
2011 1,219,461
2012 1,191,654
2013 1,089,358
2014 1,083,536
2015 997,299
2016 887,152
2017 835,438
2018 787,539
2019 743,600
2020 142,900

On service between Albuquerque and Bernalillo, fares were initially free to attract ridership. On its first day of service, the Rail Runner carried 4,122 passengers. During the initial free period, ridership averaged 4,000 to 4,500 riders per day with a one-day peak of 6,000 riders.[29] Ridership gradually declined during the weeks of free service.[30] Ridership averaged 2,500 to 3,000 riders per day in August 2006, and 2,100 to 2,500 riders per day in September 2006.

In November 2006, free service ended on the line's Sandoval section, and ridership fell to 1,000 passengers per day. When the Los Lunas and Belen stations opened with free service, ridership rose to around 1,800 passengers per day. Free service on the Belen section of the line ended April 1, 2007, and a new zone fare structure went into effect. During the summer of 2007, ridership averaged 2,500 passengers per day. By April 2008, weekly ridership was 9,600.[31]

On December 17, 2008, service to Santa Fe started with a three-month period of free service for Santa Fe County residents and three weekends of free service for the whole system. The original 2005 projected ridership for a slightly different (but similar speed) Phase II route to Santa Fe was 2,954 daily riders.[32] During the first full week of train service between the two cities, more than 33,000 passengers boarded. On the second Saturday of service to Santa Fe, nearly 12,000 people boarded trains between Belen and Santa Fe.[33] Weekend service, which was to be discontinued after the first three weekends of service to Santa Fe, was instead partly retained, with permanent Saturday service.[34] Ridership for the first few weeks of Santa Fe service averaged about 5,000 riders per day, then dropped to an average of around 4,000 riders per day for the month of January 2009.[35]

For four months in 2009, Rail Runner operated game-day trains to sporting events to Lobo Special Events Platform station. After a cumulative total of 227 passengers made use of Lobo, the game-day train service was discontinued and the station abandoned.[36]

Ridership continued to increase through 2010, reaching a peak of 1.24 million passengers annually (4,000 on an average weekday). Since then, passenger numbers have continued to decline year-over-year to a low of under 750,000 in 2019.[37][28] Government analysts blamed the drop in ridership on low gas prices, infrequent service, and long travel times, and recommended that the state focus on making the service more competitive with car travel. It was also suggested that service to the Downtown Bernalillo station be reduced or eliminated due to low ridership.[38]

Service

edit

Normal weekday service has eleven round trips: four Santa Fe–Belen round trips (one express), four Albuquerque–Belen round trips, and three Santa Fe–Albuquerque round trips. Saturday service has five northbound trips (four Belen–Santa Fe and one Belen–Albuquerque) and six southbound trips (three Santa Fe–Belen, two Albuquerque–Belen, and one Santa Fe–Albuquerque). Sunday service has three northbound trips (all Belen–Santa Fe) and four southbound trips (two Santa Fe–Belen, one Albuquerque–Belen, and one Santa Fe–Albuquerque). Additional service is provided for some events like the New Mexico Wine Festival; connecting bus shuttles run for the Balloon Fiesta.[39] The cost of Rail Runner tickets is distance-based, with six fare zones.

Route

edit
 
Kewa Pueblo, a typical Rail Runner station

The Rail Runner operates on a 96.5-mile (155.3 km) north–south corridor, which parallels Interstate 25. The southern 74.2 miles (119.4 km) from Belen through Albuquerque to CP Rael (northwest of Los Cerrillos) was formerly the BNSF Glorieta Subdivision and is shared with BNSF freight trains. The 17.9 miles (28.8 km) from CP Rael to CP Blewett (south of Santa Fe) largely runs in the median of Interstate 25. The northern 4.4 miles (7.1 km) into downtown Santa Fe is shared with the Santa Fe Southern Railway.[40]

Rail Runner has 15 active stations: ten in the Albuquerque metro area, two serving Kewa Pueblo and rural areas of Santa Fe County, and three in Santa Fe. All have single side platforms 260 feet (3 cars) to 500 feet long except for South Capitol (which has two side platforms) and Downtown Albuquerque (which has longer island platforms for the Amtrak Southwest Chief). An additional station, Lobo Special Events Platform station, is unused.

Bus connections

edit

Most stations have bus connections, including NMDOT Park and Ride shuttles (at Downtown Albuquerque, NM 599, and South Capitol), ABQRide at four stations (including Albuquerque Rapid Transit at Downtown Albuquerque), and Santa Fe Trails at the two Santa Fe stations. There are also a number of smaller shuttle services serving the Rail Runner: a shuttle to Socorro and through Belen serves the Belen station, Los Lunas Public Transportation serves the Los Lunas station, the Sandoval Easy Express serves the two stations in Bernalillo, the University of New Mexico has a dedicated shuttle connecting its main campus to the Downtown Albuquerque station, a shuttle to Taos serves the Santa Fe Depot and South Capitol stations, and Santa Ana Pueblo, Isleta Pueblo, and Pojoaque Pueblo each operate shuttles connecting their casinos to the nearest Rail Runner station.

Rolling stock

edit
 
A Rail Runner trainset in 2008

The Rail Runner power includes nine MotivePower MPI MP36PH-3C diesel-electric locomotives, thirteen Bombardier BiLevel Coaches and nine Bombardier BiLevel Cab cars. Coach cars have a seating capacity of 151 passengers while cab cars have a seating capacity of 141 passengers,[41][42] The livery of the New Mexico Rail Runner depicts a stylistic roadrunner on the locomotive and trailing tailfeathers on the coaches. The "door closing" tones resemble the signature “Beep-Beep” of the Warner Bros. Road Runner cartoon character.[43] Trains operate in a push-pull configuration, with the locomotive always facing south. When not in use, the vehicles are stored in a rail yard in downtown Albuquerque near the Alvarado Transportation Center.

Manufacturer Model Inventory Numbers
MotivePower MPI MP36PH-3C diesel-electric locomotive 9 101–109
Bombardier Transportation Bombardier BiLevel Coach 13 1001–1013
Bombardier Transportation Bombardier BiLevel Cab cars 9 1101–1109

References

edit
  1. ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  2. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. ^ "News Release on Rail Runner website". Archived from the original on November 27, 2010. Retrieved September 12, 2009.
  4. ^ a b "Rail Runner Express Gets Rollin' for the First Time on Trial Trip". The Albuquerque Journal. April 19, 2006. Retrieved April 25, 2009.
  5. ^ "Stations". New Mexico Rail Runner. Retrieved March 18, 2008.
  6. ^ "Santa Fe Fares & Zones" (PDF). New Mexico Rail Runner. Retrieved December 3, 2008.
  7. ^ "Commuter Rail Status Report: "Belen to Santa Fe Commuter Rail Overview"". Archived from the original on August 8, 2007. Retrieved November 19, 2006.
  8. ^ ""Rail Runner Route to Santa Fe" page on Rail Runner website". Archived from the original on May 13, 2008. Retrieved May 18, 2008.
  9. ^ "Sandia Pueblo Rail Runner Stop Opens". Retrieved October 5, 2011.
  10. ^ "NM Rail Runner opening new station". Retrieved March 22, 2010.[permanent dead link]
  11. ^ "New Mexico Rail Runner Express Completes Lobo Special Events Platform". UNM Today. Archived from the original on August 12, 2010. Retrieved September 12, 2009.
  12. ^ "Security Officers on the Rail Runner". Archived from the original on April 22, 2014. Retrieved April 21, 2014.
  13. ^ "Rail Runner security boosted". Albuquerque Journal. Retrieved April 21, 2014.
  14. ^ "Zia Road Station". New Mexico Rail Runner. Archived from the original on December 3, 2008. Retrieved December 4, 2008.
  15. ^ Wyland, Scott (July 13, 2020). "Rail Runner will ride again — eventually". Santa Fe New Mexican. Retrieved August 8, 2020.
  16. ^ Uyttebrouck, Olivier (April 11, 2022). "NM: Rail Runner announces 75% fare reduction". Albuquerque Journal. www.masstransitmag.com. Retrieved June 13, 2022.
  17. ^ "New Mexico Rail Runner fare cuts extended, service to increase. For Railroad Career Professionals". Progressive Railroading. July 15, 2022. Retrieved July 20, 2022.
  18. ^ "Funding". New Mexico Rail Runner. Archived from the original on May 13, 2008. Retrieved June 2, 2008.
  19. ^ "Train Debate Ignores I-25 Funding Needs". Albuquerque Journal. Retrieved November 18, 2006.
  20. ^ "Lack of funds has N.M. road projects on hold". Albuquerque Tribune. Archived from the original on December 13, 2007. Retrieved December 8, 2007.
  21. ^ "Why light rail makes sense". Socorro News. Archived from the original on August 28, 2008. Retrieved January 21, 2008.
  22. ^ "A referendum on the Rail Runner". New Mexico Independent. Retrieved September 2, 2008.
  23. ^ "Transit tax passes in 7 New Mexico counties". MSN Money. Archived from the original on March 8, 2007. Retrieved November 5, 2008.
  24. ^ "Proposed Rail Runner Station at Las Soleras" (PDF). Archived from the original (PDF) on November 27, 2010. Retrieved June 2, 2010.
  25. ^ "House Joint Memorial 22". New Mexico Legislature.
  26. ^ "House Joint Memorial 26". New Mexico Legislature.
  27. ^ "H.R. 2337: Southwestern Transit Corridor Planning and Fuel Use Reduction Act".
  28. ^ a b "Transit and Rail Division Fact Sheet" (PDF). New Mexico Department of Transportation. February 2019. Retrieved March 10, 2019.
  29. ^ "Story: Stats don't faze train managers". Albuquerque Tribune. Archived from the original on September 29, 2007. Retrieved November 18, 2006.
  30. ^ "Fewer people are riding the Rail Runner for fun". Albuquerque Tribune. Archived from the original on November 30, 2006. Retrieved November 18, 2006.
  31. ^ "Gas Prices Increase Rail Runner Ridership". KKOB News Radio. Archived from the original on May 25, 2011. Retrieved April 30, 2008.
  32. ^ "(2005) Alternatives Analysis Executive Summary". Archived from the original on February 4, 2009. Retrieved April 22, 2009.
  33. ^ Grimm, Julie Ann (December 29, 2008). "Rail Runner planners mull parking expansion". Santa Fe New Mexican. Archived from the original on February 17, 2012.
  34. ^ Grimm, Julie Ann (January 7, 2009). "Rail Runner to keep rolling on Saturdays". Santa Fe New Mexican. Archived from the original on February 17, 2012.
  35. ^ "Rail Runner Ridership Down". Albuquerque Journal. Retrieved January 27, 2009.
  36. ^ "No Plans to Reopen Abandoned $800K Commuter Train Stop". U.S. News & World Report. February 16, 2019.
  37. ^ "Public Transportation Ridership Report" (PDF). American Public Transportation Association. 2019. Archived from the original on May 23, 2020.
  38. ^ McKay, Dan (January 14, 2019). "Train ridership continues to fall in New Mexico". Albuquerque Journal. Retrieved March 10, 2019.
  39. ^ "Rail Runner for Balloon Fiesta Weekends". KRQE. Archived from the original on December 11, 2013. Retrieved December 6, 2013.
  40. ^ New Mexico Rail Runner New Mexico Division Employee Timetable No. 1 (PDF). New Mexico Rail Runner Express. December 6, 2008. pp. 4, 10.
  41. ^ "Car Specifications on Rail Runner website". Archived from the original on July 26, 2011. Retrieved December 19, 2009.
  42. ^ "Train Equipment page on Rail Runner website". Archived from the original on February 18, 2008. Retrieved February 2, 2008.
  43. ^ MacNeil, Sara (September 19, 2017). "Caution: Do Not Surf on Tracks". Santa Fe Reporter.
edit
KML is from Wikidata

  Media related to New Mexico Rail Runner Express at Wikimedia Commons