The DRDO Airborne Early Warning and Control System (AEW&CS) is a project of India's Defence Research and Development Organisation to develop an airborne early warning and control system for the Indian Air Force. It is also referred to as NETRA Airborne Early Warning and Control System (AEW&CS).
NETRA AEW&CS | |
---|---|
General information | |
Type |
|
National origin | AEW&CS – India ERJ-145 aircraft – Brazil |
Manufacturer | Embraer Adani Defence and Aerospace |
Designer | |
Status | In service |
Primary user | Indian Air Force |
Number built | 3[2] |
History | |
Manufactured | 2011-present |
Introduction date | 14 February 2017 |
First flight | 6 December 2011 |
Developed from | ERJ 145 (airframe) |
Development
editIn 2003, the Indian Air Force (IAF) and DRDO carried out a joint study of the system-level requirements and feasibility of development for an Airborne Early Warning and Control (AEW&C) system.[3] The Government then approved the project for the development of the AEW&C system by DRDO. Primary responsibility for the project was with Centre for Airborne Systems (CABS), which led the design, system integration and testing of the system. Electronics and Radar Development Establishment (LRDE) was responsible for the design of the radar array. The Defence Electronics Application Laboratory (DEAL), based in Dehradun, was responsible for the Data Link and Communication Systems for AEW&CS.
The DRDO AEW&CS programme aims to deliver three radar-equipped surveillance aircraft to the Indian Air Force. The aircraft platform selected was the Embraer ERJ 145. Three ERJ 145 were procured from Embraer at a cost of US$300 Million, including the contracted modifications to the airframe. The project goal was to deploy these AEW&C aircraft by 2013.[4] India's sole previous effort to develop an AEW&C system was the Airborne Surveillance Platform, but the programme, codenamed Airavat, was ended after the only test-bed crashed. The AEW&C project aimed to supplement the larger and more capable EL/W-2090 AWACS acquired by the IAF from Israel. Three EL/W-2090 systems have been ordered, with follow-on orders of 3 more expected in 2010.[5] Apart from providing the IAF with a cheaper and hence, more flexible AEW&C platform as a backup to its more capable EL/W-2090 class systems, the DRDO AEW&C project aimed to develop the domestic ability to design and operationalise airborne surveillance platforms.
The delivery of six additional systems ordered in October 2010 is to begin from 2015. In June 2010, it was reported that the Indian Air Force is said to be looking at acquiring up to 20 additional systems, in addition to the existing systems on order.[6][7][8]
Partners
editThe responsibility between various DRDO laboratories is split as follows:
- Electronics and Radar Development Establishment (LRDE) – Primary radar
- Defence Electronics Application Laboratory (DEAL) – Communication Systems and Data Link
- Defence Avionics Research Establishment (DARE) – Self Protection suite, Electronic Support Measurement EW
- Defence Electronics Research Laboratory (DLRL) – Communication Support Measures
- Centre for Airborne Systems (CABS) – IFF & Overall Programme Management, integration and development of the data handling system, displays, mission computers et al.
Various Indian private sector firms are involved in the programme. National Aerospace Laboratories (NAL) of Council of Scientific and Industrial Research (CSIR) contributed to the aerodynamic studies of the antenna array, and flight modelling of the entire AEW&CS platform.
Future Variants
editBy April 2019, DRDO proposed an upgraded Netra AEW&CS based on EADS CASA C-295 to the IAF as it already supports a static radar dome configuration. DRDO wanted C-295 to act as a common platform between currently used planar array radar with limited 240-degree coverage and the under development 360-degree static radar dome to save cost and time.[9] Later on DRDO replaced C-295 for Airbus A-330 to make it act as both AWACS and aerial refueling tanker.[10] There has not been any further advancement with the development of any of the above platforms as of February 2024.
On 19 July 2024, IAF issued an RFI to procure six AEW&CS and their respective ground support elements. The elements of the aircraft system would include a primary radar, electronic surveillance measures (ESM), communication support measures (CSM), command & control (C2), battle management system and networking through data links, IFF and self-protection electronic warfare suite. The primary radar is slated to have a 360° coverage. The jet-engined aircraft is to have 8-hour endurance with aerial refueling capabilities, cruise altitude of over 40,000 ft (12,000 m), cruise speed of above Mach 0.7 and a range of flying altitude from 500 ft (150 m) to 65,000 ft (20,000 m). It should be able to track large bodied aircraft to slow unmanned aerial vehicles having a low radar cross section at ranges above 550 km (340 mi). Vendors may either offer aircraft already customised as an AEW&CS or any aircraft meeting the requirements laid out by IAF including a pre-owned aircraft.[11][12]
Netra Mk 1A (EMB145)
editAs of 6 February 2024, sources reporting to various media and newspapers said that the Defence Acquisition Council (DAC) of Ministry of Defence (MoD) will take up the acceptance of necessity (AoN) for the six Mark-1A aircraft next week, which will entail mounting active electronically scanned array antenna-based radars, electronic and signal intelligence systems on Brazilian Embraer jets, at a cost of around ₹9,000 crore (US$1.1 billion). These six AEW&C aircraft will be based on Embraer-145 and have 240-degree radar coverage.[8] But there will be better software and more advanced technologies like new gallium nitride-based TR (transmit/receive) modules for the radars. This variant will also inherit some of the technologies from Mark 2.[13] DRDO will purchase the aircraft from Embraer and all the modifications will be carried out by the Centre for Air Borne Systems (CABS) in India. The Defence Acquisition Council is to clear the acquisition soon as of October 2024.[12]
Since the 145 ERJ platform is no longer manufactured, DRDO and IAF are scouting their availability in secondary markets, while Embraer has also offered Praetor 600 aircraft for the same role.[14][15]
Netra Mk 2 (Airbus A321)
editThe Cabinet Committee on Security (CCS) in September 2021 cleared ₹11,000 crore (equivalent to ₹120 billion or US$1.5 billion in 2023) project for six AEW&CS. The platform will be Airbus A321 that will be purchased from Air India.[16] The A321s will be sent to France where they will be modified to military standards and then will be returned to DRDO where radars and surveillance suites will be fitted.[17] The contract negotiations for the modifications of the aircraft is on the way as of October 2024.[12]
The developmental work on the six Mark-2 aircraft, with bigger and more capable versions of the AEW&C radars and sensors to be mounted on second-hand Airbus A321 planes bought from Air India, is already at an advanced stage, as of February 2024, at a cost of ₹10,990 crore (US$1.3 billion). Delivery of the first such AEW&C Mark-2 aircraft, which will also have an antenna in the nose in addition to the main dorsal antenna to give 300-degree radar coverage, should take place in 2026-27.[13] For the Netra Mk 2 project, Adani Defence & Aerospace has been designated as the L1 entity.[18]
Design
editTwo radiating planar arrays assembled back-to-back and mounted on top of the fuselage in an active antenna array unit (AAAU) will provide 240° coverage like Erieye. The AAAU is configured to compactly house 10 × 2 antenna array panels, 160 transmit receive 10 × 2 antenna array panels, 160 transmit receive multi-modules (TRMMs) dividers, beam forming units, beam control units, power supply units and related electronic devices including cables and connectors. This has been achieved through an innovative and iterative process to arrive at the AAAU with minimal dimensions and optimum mass properties. A unique feature of this Indian TRMM design is that eight trans-receive modules are combined compactly to form a single TRMM, thus facilitating high density installation of 160 of them in the AAAU to power the surveillance radar.[19]
Additionally, the aircraft has other mission capabilities like identification friend or foe (IFF), electronic and communication support measures, C-band line-of-sight and Ku-band SATCOM datalinks, etc., similar to those on the AWACS and CAEW systems. The important modes of operation of the primary radar system are the surface surveillance and the air surveillance. The sensor has the abilities to search, track-while-scan, priority tracking, high performance tracking, etc. In priority tracking, the targets will be placed in full track mode even if these cross the primary surveillance area. In high performance tracking, additional measurements will be made to improve the tracking accuracy. Utilising active aperture technology, the radar provides a fast-beam agile system that can operate in several modes concurrently. Inter-operability with AWACS, other AEW&C aircraft, fighters and ground-exploitation stations is ensured using the data-links with voice and data channels. The aircraft cabin houses five operator work stations to adequately meet requirements of the operational mission tasks.
An air-to-air refuelling system enables extended operations at times of need. The endurance of the platform aircraft is about nine hours with one air-to-air refuelling.
Capabilities
editThe AEWACS aircraft has an active electronically scanned array (AESA) primary radar with IFF. The system will also have ESM (Electronic Support Measures) and CSM (Communications Support Measures) ability. Datalinks to network the AEW&CS with fighters, and ground-based control systems will also be provided, as will be the SATCOM (Satellite Communication System). The aircraft will also have a comprehensive self-defence suite. The avionics suite will be linked via a datahandling system, controlled by Mission computers.
DRDO's public overview of the AEW&CS aircraft stated:[20]
- The Radar will have an extended range mode against fighter aircraft, and will consist of two back to back AESA arrays, with an additional dedicated IFF array.
- The ESM system will be able to track sources with a directional accuracy of 2 deg. RMS and a frequency accuracy of 1 MHz.
- The ESM system will have complete 360-degree coverage in azimuth and have a database of up to 3000 emitters against which threats will be scanned.
- Communication Support Measure system will analyse and record intercepted communications both inflight and post flight.
- Self Protection Suite will have a passive Missile Approach Warning System, a Radar Warning Receiver and countermeasures dispensers. The SPS will be integrated with the ESM and CSM suite.
- The aircraft will support Inflight refuelling.
- The aircraft will have SATCOM, and datalinks to pass on ESM, CSM and radar data to ground stations and datalinks to pass on target information to fighters. More than 40 other aircraft will be datalinked together by the AEW&C aircraft.[21]
Status
editThe first round of modifications to the first EMB-145 fuselage for India's early warning aircraft were made in March 2011 in preparation for integration with the Indian-designed antenna.
In June 2010, it was reported that the Active Array Antenna Unit (AAAU), developed by DRDO's Centre for Airborne Systems (CABS), was to be integrated into the modified EMB-145 aircraft. First test flight of the system was expected in early 2011.[6][22][23][24][25]
The first modified fuselage platform was handed over to DRDO by Embraer in February 2011. Ground and flight tests of the aircraft were to be followed by installation of radar and other equipment.[26] The first fully modified EMB-145i Aircraft with the antenna and its electronic payload made its maiden flight on 6 December 2011 at Embraer facilities at Sao Jose dos Campos in Brazil with about 1000 Mission System Components provided by CABS, DRDO. These included the critical item – AESA (Active Electronically Scanned Array) Radar Antenna developed by DRDO and certified from ANAC, International FAR Certification Agency at Sao Jose dos Campos in Brazil. Some of the sensitive advanced systems were replaced with dummy equipment of equivalent size and weight. These were to be integrated later in India following flight certification. A two-year certification period is expected. DRDO is expected to receive the next two aircraft platforms to start integration by mid-2012.[27][28]
Embraer Defence and Security, on 16 August 2012 delivered the first EMB 145 Airborne Early Warning and Control (AEW&C) class of aircraft to the Government of India, in a ceremony held at Embraer's headquarters in São José dos Campos, Brazil. The delivery follows successful completion of ground and flight tests of the aircraft which met operational targets established by both Embraer and Centre for Airborne Systems (CABS) of Defence Research & Development Organisation (DRDO). Later on the aircraft will be delivered to the Indian Air Force after integration of missions systems of DRDO by CABS in India.[29][30]
Maiden flight of the second fully modified aircraft for the Indian Airborne Early Warning and Control System (AEW&C) was held at 1930 IST on 4 April 2012 at the San Jose dos Campos in Brazil. The necessary mission systems and components including the dummy AAAU (Active Antenna Array Unit) are successfully fitted onboard Embraer EMB 145I aircraft.[31][32]
Delivery
editThe first fully modified aircraft for India's Airborne Early Warning and Control System landed on Indian soil at Centre for Airborne Systems (CABS) Bangalore, a DRDO laboratory at 22:10 hours at HAL airport, Wednesday night at 22 August 2012. The acceptance of the aircraft was completed over a period of 15 days at Embraer Facilities in Brazil, by a joint team from CABS, Centre for Military Airworthiness and Certification (CEMILAC), Directorate General of Aeronautical Quality Assurance (DGAQA) and Indian Air Force (IAF).
The aircraft ferried with several mission system external components of DRDO including the (AESA radar) Active Electronically scanned Array Antenna with passive electronics fitted on the aircraft. The arrival of this aircraft marks the beginning of another phase of journey leading to the next major milestone of integration of the DRDO developed mission system, which will be followed by development flight trials in India beginning of 2013. It may be noted that this is the first aircraft delivered by M/s Embraer for which the contract was signed in 2008. The next aircraft is expected to arrive in December 2012.
IAF took delivery of the second NETRA AEW&C on 11 September 2019 and deployed it at Bathinda Air Base in Punjab.[33] The third Embraer platform was meant to remain with DRDO but now they are looking at the option of selling the aircraft to a foreign customer as a major diplomatic gesture.[34]
Operational history
editThe first combat usage of the Netra AEW&C by the IAF was on 26 February 2019, during the Balakot airstrike.[35] Indonesia has requested a systems demonstration.[36]
Platforms
editPlatform | Designation | Status | Radar range | Radar coverage | Ref. |
---|---|---|---|---|---|
Embraer R99 | Netra Mk 1 | 3 in service | 240 km | 240° | [13][37] |
Embraer ERJ family | Netra Mk 1A | 6 planned | 450 km | 240° | [13][37] |
Airbus A321 | Netra Mk 2 | 6 planned | 450 km | 300° | [13][37][38] |
Operators
edit- India
- Indian Air Force : 3 in service[39]
- Bhisiana Air Force Station, Bathinda
See also
editReferences
edit- ^ "DRDO hands over second 'Netra' early warning system to IAF". The New Indian Express. 11 September 2019.
- ^ "Indian Air Force Wants Home-Grown AWACS To Double As Tanker". LIVE FIST DEFENCE. 28 February 2018.
- ^ "Development of Airborne Early Warning and Control System" (Press release). Press Information Bureau, GoI. 11 December 2003. Retrieved 25 July 2008.
- ^ Sharma, Ravi (20 April 2008). "Brazilian jets to serve as eye in the sky for IAF". The Hindu. Retrieved 11 September 2019.
- ^ More Phalcons to be ordered
- ^ a b Embraer Develops Complementary Platforms For Indian Systems
- ^ Indian Airborne Early Warning Aircraft On Track
- ^ a b "AEW&CS Project – IDP Sentinel". Archived from the original on 23 April 2012. Retrieved 16 April 2012.
- ^ "DRDO Offers India Netra AEW&C on Airbus C-295". Defence News India. 5 April 2019. Retrieved 13 September 2019.
- ^ Philip, Snehesh Alex (9 September 2021). "Modi govt okays 6 more 'eyes in the sky' for IAF, DRDO project to cost Rs 11,000 crore". ThePrint. Archived from the original on 9 September 2021. Retrieved 10 September 2021.
- ^ "Defence Ministry issues request for information to procure 6 Airborne Early Warning and Control Systems for IAF". The Tribune. 29 September 2024. Retrieved 29 September 2024.
- ^ a b c Peri, Dinakar (6 October 2024). "IAF looking at 12 early warning aircraft under two different programmes". The Hindu. ISSN 0971-751X. Archived from the original on 7 October 2024. Retrieved 7 October 2024.
- ^ a b c d e "As Pakistan, China fly ahead, India guns for 12 more 'eyes in sky'". The Times of India. 6 February 2024. ISSN 0971-8257. Retrieved 6 February 2024.
- ^ Pubby, Manu (22 September 2023). "IAF plans for six more 'Netra' early warning aircraft". The Economic Times. ISSN 0013-0389. Retrieved 12 January 2024.
- ^ Sipinski, Dominik (26 September 2023). "Indian Air Force scouts for used E145s for AEW conversion". ch-aviation. Retrieved 23 January 2024.
- ^ Singh, Rahul (9 September 2021). "DRDO to develop new early warning jets for IAF under ₹11,000 crore project". Hindustan Times. Archived from the original on 9 September 2021. Retrieved 10 September 2021.
- ^ Herk, Hans van (5 October 2023). "Additional AEW&C capacity for Indian Air Force". www.scramble.nl. Retrieved 3 February 2024.
- ^ "Integrated Annual Report 2023-24" (PDF). Adani Enterprises Limited. Retrieved 30 September 2024.
- ^ http://publications.drdo.gov.in/gsdl/collect/defences/index/assoc/HASHef00/d0ae05fa.dir/doc.pdf[permanent dead link ]
- ^ DRDO article on the AEW & C
- ^ "ACIG Article on the AEWACS". Archived from the original on 3 June 2008. Retrieved 24 May 2008.
- ^ India defence (12 September 2010). "AWACS Developed by DRDO to Roll Out in January 2011; Flight Tests in 2011". india defence. Retrieved 12 September 2010.
- ^ Embraer aircraft with Indian warning system to fly by 2011
- ^ India developing unmanned combat air vehicle – India – DNA
- ^ India to roll out indigenous AEW aircraft by 2012 – Brahmand.com
- ^ Embraer unveils the new EM 145 AEW&C platform developed for the Indian government
- ^ Livefist: FIRST PHOTO: India's AEW Platform Makes First Flight
- ^ "AEW&CS Project – IDP Sentinel". Archived from the original on 23 April 2012. Retrieved 16 April 2012.
- ^ "India receives first EMB 145 AEW&C aircraft from Embraer". Airforce Technology. 16 August 2012. Retrieved 12 September 2019.
- ^ "First AEW&C aircraft delivered to India – DB – Digital Battlespace – Shephard Media". www.shephardmedia.com. Retrieved 12 September 2019.
- ^ :: Bharat-Rakshak.com – Indian Military News Headlines :: Archived 20 February 2015 at the Wayback Machine
- ^ Livefist: FIRST LOOK: Maiden flight of the India's 2nd Indigenous AEW&C
- ^ "DRDO hands over second 'Netra' early warning system to IAF". The New Indian Express. 11 September 2019. Retrieved 12 September 2019.
- ^ Aroor, Shiv (28 February 2018). "Indian Air Force Wants Home-Grown AWACS To Double As Tanker". Livefist. Retrieved 12 September 2019.
- ^ "Balakot attack: Mirage 2000 wasn't only star, unarmed IAF jets also played role". The Week. 26 February 2020. Retrieved 20 September 2020.
- ^ Raditya, Rendy (13 February 2017). "Indonesia Gets in Line For India's New AEW&C Jet". Militer.or.id. Retrieved 12 September 2019.
- ^ a b c "DRDO Seeks Cutting-Edge Tech for Netra Mk-1A Airborne Early Warning System". India Defence. 20 January 2024. Retrieved 6 February 2024.
- ^ "AWACS AEW&C Netra RADAR DRDO AIRBUS". Full Afterburner. Retrieved 6 February 2024.
- ^ International Institute for Strategic Studies (15 February 2023). The Military Balance 2023. London: Routledge. p. 251. ISBN 9781032508955.