The Cascais Line (Portuguese: Linha de Cascais) is a Portuguese railway line which connects the municipalities of Lisbon, Oeiras, and Cascais. The line starts in Lisbon, at Cais do Sodré and ends in Cascais. The first section, from Cascais to Pedrouços, was opened in 1889. The line was completed in 1895.[2] It was the first heavy rail line to be electrified in Portugal, in 1926,[2] and the last to be integrated into CP, in 1977.[3] In July, 2020, CP announced that the line is slated to be converted from 1500 V DC electrification, to 25 kV AC, to match the rest of the network.[4] Signalling will also be upgraded and new trains acquired.
Cascais Line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Infraestruturas de Portugal | ||
Termini | |||
Connecting lines | Cintura Line | ||
Service | |||
Operator(s) | Comboios de Portugal | ||
Technical | |||
Line length | 25.4 km (15.8 mi) | ||
Track gauge | 1,668 mm (5 ft 5+21⁄32 in) Iberian gauge | ||
Electrification | 1500 V DC Overhead line Conversion planned to 25kv AC | ||
Signalling | ETCS Level 2 Planned (active by 2023) | ||
|
Location on the network |
Linha de Cascais | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
See also
editReferences
edit- ^ http://bound-ap.com/newsletter14_files/p14%284%29.jpg [bare URL image file]
- ^ a b Torres, Carlos Manitto (16 January 1958). "A evolução das linhas portuguesas e o seu significado ferroviário" (PDF). Gazeta dos Caminhos de Ferro (in Portuguese). Retrieved 28 December 2018.
- ^ MARTINS et al., 1996:51
- ^ 2020-07-23T08:00:00. "AC conversion planned in Cascais line upgrade". Railway Gazette International. Retrieved 2021-07-27.
{{cite web}}
: CS1 maint: numeric names: authors list (link)
Sources
edit- Martins, João; Brion, Madalena; Sousa, Miguel (1996). O Caminho de Ferro Revisitado (in Portuguese). Lisbon: Caminhos de Ferro Portugueses.
- "2019 Network Statement" (PDF). 7 December 2018. Retrieved 20 January 2019.
{{cite journal}}
: Cite journal requires|journal=
(help)