The Belgrade–Bar railway (Serbian: Пруга Београд–Бар, romanizedPruga Beograd–Bar) is a 476.59 km (296.14 mi) long electrified main line connecting the Serbian capital of Belgrade with the town of Bar, a major seaport in Montenegro. Completed in 1976, which connects Belgrade with the Mediterranean port of Bar. It was built by the Yugoslav State Railways (JŽ) in 25 years of construction[1] and is now operated by its successor companies Železnice Srbije (ŽS), Željeznice Republike Srpske (ŽRS) and Željeznička Infrastruktura Crne Gore (ŽICG).

Belgrade–Bar railway
ŽCG 461 039 at Lutovo station
Overview
StatusActive
OwnerSerbian Railways, ŽICG
Termini
Service
Route number108 (ŽS)
Operator(s)Serbian Railways, ŽPCG
History
Opened1976
Technical
Line length476.59 km (296 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius300 m (984 ft)
Electrification25 kV, 50 Hz AC
Operating speed
  • 70 km/h (43 mph) (currently)
  • 75 km/h (47 mph)–120 km/h (75 mph) (designed)
Belgrade–Bar Railway

electrification
25 kV AC
to Pančevo
Belgrade Main (0,0 km)
Gazela Bridge
Mostar interchange
Old Railroad Bridge
to Šid and Zagreb
New Railroad Bridge
to Pančevo
NIS Petrol
Topčiderka
Topčider
Košutnjak
Rakovica
Kijevo
to Batajnica
to Niš
Resnik
to Mladenovac and Niš
Boundary of Belgrade
Bela Reka
Barajevo
Stepojevac
Kolubara coal mine
Vreoci
Lazarevac
Lajkovac
Divci Airport
Valjevo
Gradac canyon
Gradac
Kosjerić
Požega
to Kraljevo
Uzići
Zlakusa
Sevojno
Užice Freight
Užice
Stapari
Sušica
Branešci
Zlatibor Tunnel (6168 m)
Zlatibor
Jablanica
SRB
BIH
(205,5 km)
Štrpci
BIH
SRB
(214,8 km)
Uvac
Rača
Priboj
Poljice
Pribojska Banja
Lim
Prijepolje
Prijepolje Freight
Vrbnica
Gostun
SRB
MNE
(301 km)
Bijelo Polje
Mojkovac Tunnel (3243 m)
Mojkovac
Kolašin
1032 m
Mateševo
Ostrovica Tunnel (3827 m)
Trebesica
Trebesica Tunnel (5122 m)
Bratonožići
Mala Rijeka Viaduct
Bioče
to Nikšić
2,6
Podgorica
Zetratrans
Aluminium Plant
Podgorica
to Shkodra
Golubovci
Zeta
Morača
Morača Bridge
Lesendro
Lake Skadar
Tanki rt Bridge
Virpazar
Sozina Tunnel (6172 m)
Sutomore
Bari, Corfu
Bar (476 km)
Port of Bar

The mountain railway crosses three mountain ranges in the Dinaric Mountains and has its highest point at 1,032 m (3,386 ft) south of this, the maximum gradient of the route is 25 ‰, north of it 17 ‰. The route in the difficult terrain required 254 tunnels and over 243 bridges. The route is considered one of the most difficult in Europe.[2]

The connection from the Serbian capital to the Adriatic coast was one of the major railway projects in Europe in the second half of the 20th century.[3] At the time, it was considered the most important railway construction project after the Second World War[4] and the most expensive infrastructure project of the Socialist Federal Republic of Yugoslavia.[5] At present, it is Serbia's shortest connection to a Mediterranean port and Montenegro's only international passenger transport connection. Albania has also been connected to the European railway network via the branch line Podgorica–Shkodra since 1986. From the opening of the line until 2018, the Belgrade Main station was the starting point for trains to Montenegro; since 2021, all trains have departed from Belgrade Centre station.

Overview

edit
 
Mala Rijeka Viaduct
 
Pester Plateau, Serbia on the Belgrade-Bar railway.

The Belgrade–Bar railway is 476 kilometres (296 mi) long, of which 301 km (187 mi) is in Serbia and 175 km (109 mi) is in Montenegro. It is standard gauge and electrified with 25 kV, 50 Hz AC for its entire length. It passes through 254 tunnels of total length of 114,435 m (375,443 ft) and over 435 bridges (total length 14,593 m (47,877 ft)). The longest tunnels are "Sozina" (6.17 km or 3.83 mi), and "Zlatibor" (6.169 km or 3.833 mi). The biggest and the best-known bridge is Mala Rijeka Viaduct, 498 metres (1,634 ft) long and 198 m (650 ft) above ground level.

The highest point of the railway is 1,032 m (3,386 ft) above mean sea level, at the town of Kolašin. The railway descends to 40 m (130 ft) above mean sea level at Podgorica in a relatively short distance, resulting in a gradient of 25 on this section.

A short 9 km (6 mi) section of the railway passes through Bosnia and Herzegovina, where there is a station at Štrpci.

When the line was completed in the late 1970s, the trip between Belgrade and Bar took approximately 7 hours. Today, the same trip takes around 11 hours due to speed restrictions necessitated by poor track conditions and border controls at Bijelo Polje.[6]

Stations

edit
 
Geographical map of the railway

History

edit
 
President of Yugoslavia Josip Broz Tito and First Lady Jovanka Broz at the opening of the railway in 1976 on Tito's Blue Train.

The decision to build the railway connection between Belgrade and Bar was made in 1952, as a national project of the Socialist Federal Republic of Yugoslavia. However, the construction was passed to the constituent Republics, SR Serbia and SR Montenegro, to build on their own.[citation needed]

The sections of the railway were completed as follows:

The construction works were concluded on 27 November 1975, by joining the railway tracks south of Kolašin. The railway was opened on 28 May 1976. Electrification was completed at the end of 1977.

Maintenance of the Belgrade–Bar railway suffered from chronic underfunding during the 1990s, which has resulted in the railway deteriorating and becoming unsafe. This culminated in the Bioče derailment, when a passenger train derailed, causing the deaths of 47 passengers. As a result, efforts are being made to thoroughly reconstruct the railway.

The Serbian part of the railway was targeted several times by NATO during its bombing campaign in 1999, seriously damaging portions of the railway.[7] Also, the small section that passes through Bosnia and Herzegovina was blown up by SFOR ground forces.[8] All of this damage was later repaired.[citation needed]

In 2016, Serbia started a thorough reconstruction of its portion of the line in order to restore its original maximum speed of 120 kilometres per hour (75 mph). The first section, between Belgrade and Valjevo (27% of the Serbian part of the line) was completed in 2017, with speeds of up to 120 km/h, however Serbian Railways Infrastructure later stated trains reached speeds of 100 km/h, causing some confusion as to what the maximum speed actually is.

edit

The railway line and its construction were the subject of interpretations from the folk music genre in Yugoslavia, particularly in the 1960s and 1970s, such as by Lepa Lukić (Brzi voz Beograd Bar and Beograde, Bar te zove), or the Braća Bajići (Sitan kamen do kamena). In the latter song, meters from the Starogradska Muzika and the Kolos with the sounds of the gusle represent the symbolic connection between the republics. The same was true of Dragan Antić's record Pruga Beograd–Bar, on which, of the four songs, the number Jadran Ekspres began with the solo singing of a guslar. Antić's album, like Lepa Lukić's album of the same name, was released on the Yugoslav major label RTB (Radio Televizija Beograd – today's RTS). These albums were financed by the Jugoslovenska Investiciona Banka and featured identical covers with the railway line, once in blue and once in red.

The last train to leave the Beograd-Glavna station, on 15 June 2018, was bid farewell at the station by playing the cult hit A sad adio.[9][10] The Serbian media spoke of the end of an era, and the locomotive driver of the last journey said goodbye to the station and the waiting passengers with a siren.[11]

edit

See also

edit

References

edit
  1. ^ Reimar Holzinger (1972), S. 60.
  2. ^ Branislav Šuica: Beograd-Bar, eine neue Strecke der Jugoslawischen Eisenbahnen. In: Eisenbahn-Jahrbuch. Transpress VEB-Verlag für Verkehrswesen, Berlin 1976, S. 61.
  3. ^ Olaf Ihlau: Vom Aschenputtel zum Hätschelkind. In: Montenegro. = Merian. Jg. 30, 6, Hoffmann & Campe, Hamburg 1977, S. 113.
  4. ^ Reimar Holzinger: Die Eisenbahn Beograd-Bar - Europas bedeutendster Eisenbahnbau nach 1945. In: Eisenbahntechnik. 3/1972, (I) S. 59–61, (II) S. 97–101, Bohrmann, Wien, ISSN 0013-2829.
  5. ^ Danijel Kežić: Pruga Beograd–Bar 1952–1976 istorija finansiranja najvećeg infrastrukturnog projekta u socijalističkoj jugoslaviji. In: Istraživanja. Nr. 22, 2011, S. 455–477. Archived (Date missing) at scindeks-clanci.ceon.rs (Error: unknown archive URL)
  6. ^ "Border crossing points". Government of Montenegro. Retrieved 19 July 2023.
  7. ^ "14. April – oštećena pruga Beograd–Bar, gađan "Krušik"".
  8. ^ "Kako je minirana pruga Beograd - Bar". Archived from the original on 2016-03-04. Retrieved 2021-05-06.
  9. ^ N1, 16. Juni 2018 Archived (Date missing) at rs.n1info.com (Error: unknown archive URL)
  10. ^ Blic, 16. Juni 2018 Emotivni ispraćaj sa železničke stanice Poslednji voz za Bar otišao uz dugu sirenu i pesmu „A sad adio“
  11. ^ b92, 16. Juni 2018 Kraj jedne ere – ispraćen poslednji voz za Bar