The article's lead section may need to be rewritten. (February 2012) |
Waluj MIDC19°49′53.88″N 75°14′4.99″E / 19.8316333°N 75.2347194°E After 1960, Maharashtra Industrial Development Corporation (MIDC) began acquiring land and setting up industrial estates. Land was acquired near Waluj Village on Aurangabad - Ahmednagar highway in the 1970s & 1980s. Total notified area is 1298 hectares (12.98 km2).
Clients
editIndustries which have made Waluj their home include Bajaj Auto, Varroc polymers pvt ltd, Endurance Group, Marathwada Auto Cluster, Mylan Pharmaceuticals, Endress+Hauser, Can Pack Group, Cosmo Films Group, Garware Polymer, BKT Tires, Goodyear Tires, Star Light India Ltd, Coca-Cola, Jonshan & Jonshan, Biral Group, Crompton Graves, Wockhardt, Ajantha Pharma Colgate-Palmolive, Kesona polymats, Siemens, Baxter International, and MAN Diesel, [https://jsdl.in/DT-99M1DNVK Carlsberg India, foster India Ltd, ABInBev Ltd, United Breweries Ltd Kingfisher, Carlsberg India Ltd, Ajanta Brewery Pvt Ltd, Lilasons Pvt Ltd. Aurangabad is now a classic example of efforts of state government towards balanced industrialisation of state.[1]
Waluj Mahanagar
editA new industrial cum residential township has been planned at Waluj in Aurangabad by CIDCO. It is 12 km southwest of Aurangabad city and is well connected by road to the city.[2] The new town is named as Waluj Mahanagar.
New Town
editThis project is approximately eight times the size of those executed in Aurangabad city. CIDCO has conceived Waluj as a ring township, with the ring route acting as a spine for urban activities around the industrial center (MIDC),[3] with independent and inter-linked nagars spread all around the core with their strong links between workplaces and residences. The ring routes also facilitate an easy and economic transportation system to operate within the new city. Development of Waluj is encouraged through the development of core units, boosting socio-economic development of the urban fabric. The township, when fully developed, will cover an area of around 100 km2.[2]
Appointment of CIDCO as S.P.A. | 07.10.91 |
Total Notified Area (Ha.) | 8,670.00 |
Area in Phase I (Ha.) | 1714.85 |
Area developed to date | 160.00 |
Area yet to be developed (Ha.) | 1554.00 |
External links
editReferences
edit- ^ TOI (12 April 2009). "History revisited at Aurangabad". The Times Of India. Retrieved 20 January 2010.
- ^ a b c Waluj Aurangabad CIDCO
- ^ Chikalthana Midc