Sutherland Road station is a light rail stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue at its intersection with Sutherland Road, in Brighton, Boston, Massachusetts. The stop consists of two side platforms, which serve the B branch's two tracks. The platforms are at track level and the stop is not accessible.
Sutherland Road | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Commonwealth Avenue at Sutherland Road Brighton, Boston, Massachusetts | ||||||||||
Coordinates | 42°20′29″N 71°08′46″W / 42.34148°N 71.14616°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
History | |||||||||||
Opened | May 26, 1900[1][2] | ||||||||||
Passengers | |||||||||||
2011 | 856 (weekday average boardings)[3] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[4] Design for Sutherland Road and four other B Branch stops was 30% complete by December 2022.[5] A design shown in March 2024 called for the platforms to be rebuilt at their current locations.[6] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Sutherland Road.[7] As of June 2024[update], construction is expected to start in fall 2025.[8]
References
edit- ^ Engineering and Maintenance Department (1981). History of subways, tunnels and elevated lines. Massachusetts Bay Transportation Authority – via Internet Archive.
- ^ Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. p. 58. ISBN 0938315048.
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
- ^ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
- ^ "Green Line B Branch Improvements and Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 22, 2024.
- ^
- "All Stations Accessibility Program FY24 Projects". Federal Transit Administration. May 28, 2024.
- "Biden-Harris Administration Announces $343 Million to Modernize Transit Stations, Improve Accessibility Across the Country" (Press release). Federal Transit Administration. May 28, 2024.
- "MBTA Wins $67 Million Federal Grant to Improve Green Line Accessibility for People with Disabilities" (Press release). Massachusetts Bay Transportation Authority. May 30, 2024.
- ^ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 4.
External links
editMedia related to Sutherland Road station at Wikimedia Commons