Nanda Devi AC Express

(Redirected from Nanda Devi Express)

The 12401 / 12402 Nanda Devi AC Express train belonging to Indian Railways that runs between Kota Junction & Dehradun in India. It is a daily service. It operates as train number 12401 from Kota Junction to Dehradun and as train number 12402 in the reverse direction. At first it ran between New Delhi & Dehradun as train number 12205 & 12206. Since 26 August 2019 it was extended up to Kota Junction, skipping New Delhi. It stops at Hazrat Nizamuddin while following the same route and same timings from Ghaziabad Junction to Dehradun.Earlier this train used to run as New Delhi Dehradun AC Express from New Delhi from 25/09/2010 till 07/10/2014 and then was renamed as "Nanda Devi Express".This train used to originate from Hazrat Nizamuddin before 25/09/2010.

Nanda Devi AC Express
Overview
Service typeAC Express
LocaleRajasthan, Haryana, Delhi, Uttar Pradesh & Uttarakhand
First service1 July 2008; 16 years ago (2008-07-01)
Current operator(s)Northern Railway
Route
TerminiKota Junction (KOTA)
Dehradun (DDN)
Stops11
Distance travelled763 km (474 mi)
Average journey time11 hours 45 minutes
Service frequencyDaily
Train number(s)12401 / 12402
On-board services
Class(es)AC first class, AC 2 tier, AC 3 tier
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering,
E-catering
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Other facilitiesBelow the seats
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed130 km/h (81 mph) maximum,
65 km/h (40 mph) average including halts.

Coaches

edit

The 12401/12402 Nanda Devi AC Express has 2 AC First Class, 4 AC Two Tier, 7 AC Three Tier coaches along with 2 End on generation cars. As with most train services in India, coach composition may be amended at the discretion of Indian Railways depending on demand.

EOG || B7 || B6 || B5 || B4 || B3 || B2 || B1 || A4 || A3 || A2 || A1 || H2 || H1 || EOG

Service

edit

It is a daily train & covers the distance of 763 kilometres in 11 hours 45 minutes as 12401 Nanda Devi AC Express (65  km/h)and in 11 hours 45 minutes as 12402 Nanda Devi AC Express (65  km/h). It has a Superfast surcharge.

Route & halts

edit

The train runs from Kota Junction via Sawai Madhopur Junction, Gangapur City, Hindaun City, Bharatpur Junction, Mathura Junction, Hazrat Nizamuddin, Ghaziabad Junction, Meerut City Junction, Muzaffarnagar, Roorkee, Haridwar to Dehradun.

Traction

edit

It is hauled by a Tughlakabad Loco Shed based WAP-7 electric locomotive on its entire journey.

Operation

edit
  • 12401 Nanda Devi AC Express leaves Kota Junction on a daily basis at 17:55 hrs and reaches Dehradun the next day at 05:40 hrs.
  • 12402 Nanda Devi AC Express leaves Dehradun on a daily basis at 22:50 hrs and reaches Kota Junction the next day at 10:35 hrs.

From 25 August 2019, it operate as 12401 / 12402 Dehradun Kota Nanda Devi AC Express with stoppage at Hazrat Nizamuddin instead of New Delhi. Before that, it used to run between Dehradun & New Delhi as 12205/12206.

edit
edit