English: The site of the under-construction Twins Ballpark, almost a year (355 days) after construction commenced on May 21, 2007. Construction of the main stadium structure had begun, the concrete pedestrian bridges over the freeway had begun (a larger bridge to the right is not visible). The location is bordered by 7th St. N (overpass on left), the Hennepin Energy Recovery Center (HERC) (building with smokestacks at rear left as well as the similarly colored small building to the right of it), 5th St. N (overpass on the right side), and the 394 exits (foreground). This photo was taken almost a year (357 days) after this photo of the exact same location/position.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
https://creativecommons.org/licenses/by/3.0CC BY 3.0 Creative Commons Attribution 3.0 truetrue
Captions
Add a one-line explanation of what this file represents
{{Information |Description = {{en|The site of the under-construction '''Twins Ballpark''', almost a year (355 days) after construction commenced on May 21, 2007. Construction of the main stadium structure had begun, the concrete ped