Datunludong station[3] (simplified Chinese: 大屯路东站; traditional Chinese: 大屯路東站; pinyin: Dàtúnlù Dōng Zhàn) is an interchange station of Line 5 and Line 15 on the Beijing Subway.
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Other names | Datundong[1][2] (大屯东) | |||||||||||||||
Location | Beiyuan Road (北苑路) and Datun Road (大屯路) Datun Subdistrict, Chaoyang District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (1 island platform and 2 side platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated (Line 5) Underground (Line 15) | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | October 7, 2007 December 26, 2015 (Line 15) | (Line 5)|||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
History
editThe line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.[4] The line 15 station opened on December 26, 2015,[5] one year later than the other stations on the line.
Station layout
editThe line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.
Exits
editThere are 5 exits in operation, lettered A1, B1, B2, G, and H2. Exits A1, B1 and G are accessible.
Exit H1 is under planning.
Gallery
edit-
Line 5 platform before renovation
-
Line 15 station hall
-
Line 15 platform
-
Line 5 concourse after renovation
-
Line 15 concourse
References
edit- ^ 北京晚报 (2004-03-12). "北京密织轨道交通网 地铁10号线二期规划亮相". Archived from the original on 2004-03-15.
立水桥站、立水桥南站、北苑西站、大屯东站、惠新西桥站、北土城东路站、和平西桥站
- ^ "Beijing Subway Plan 2008" (PDF). Argonne National Laboratory. Archived from the original (PDF) on 2010-05-28.
- ^ "JPG格式线路图下载". Archived from the original on 2024-01-02. Retrieved 2024-05-11.
- ^ "10月17日起5号线蒲黄榆站、大屯路东站因换乘改造施工临时封站". Beijing Subway (in Chinese). Archived from the original on 2020-05-08. Retrieved 2020-09-18.
- ^ "两条地铁线今日试运营". Beijing Daily (in Chinese). Archived from the original on 2015-12-27. Retrieved 2020-09-18.
External links
edit- Media related to Datunlu East Station at Wikimedia Commons
40°00′14″N 116°25′03″E / 40.003841°N 116.417377°E