It has been suggested that this article be merged into Green Line (Delhi Metro). (Discuss) Proposed since March 2024. |
The Indigo Line (Line 11) is a proposed line of the Delhi Metro. It will provide improved connections to northern, north-western and central Delhi with eastern, south-eastern Delhi and Noida, to decrease the increasing traffic, congestion and pollution on roads. It will act as a link line, by joining seven lines–Red, Green, Magenta, Yellow, Orange, Violet and Blue lines with each other. It will start from Inderlok and end in Indraprastha. It will be 12.57 km (7.81 mi)-long with eleven stations, out of which six will be underground and five wil be elevated. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2026.[1][3][4]
Indigo Line (Line 11) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Planned | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Delhi Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Delhi | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 11 Elevated: 5 Underground: 6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Delhi Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Delhi Metro Rail Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2026[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 12.57 km (7.81 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground and elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC overhead catenary | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
History
editThe Indigo Line was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Indigo Line will connect Inderlok with Indraprastha, at a length of 12.57 km (7.81 mi). The plans were finalized for implementation by the Government of Delhi in December 2018.[5] In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Indigo Line began from April 2019, and was completed in three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic.[6] It was expected to be completed by 2024/25, which has been extended to 2026, as of February 2024.[4]
Stations
editThe stations proposed for the Indigo Line are:[3]
Indigo Line | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Phase | Opening | Interchange Connection | Station Layout | Platform Level Type | Depot Connection | Depot Layout | |
English | Hindi | ||||||||
1 | Inderlok | इंद्रलोक | 4 | 2029 | Green Line Red Line |
Island | None | None | |
2 | Daya Basti | दया बस्ती | None | ||||||
3 | Sarai Rohilla | सराय रोहिल्ला | |||||||
4 | Ajmal Khan Park | अजमल ख़ान पार्क | |||||||
5 | Nabi Karim | नबी करीम | Magenta Line (Phase 4 - Under Construction) | ||||||
6 | New Delhi | नई दिल्ली | Yellow Line Airport Express | ||||||
7 | Asaf Ali Road | असफ अलि रोड | None | ||||||
8 | Delhi Gate | दिल्ली गेट | Violet Line | ||||||
9 | Rajghat | राजघाट | None | ||||||
10 | Indira Gandi Stadium | इन्दिरा गान्धी स्टेडियम | None | ||||||
11 | Indraprastha | इंद्रप्रस्थ | Blue Line | Yamuna Bank Metro Depot | At Grade |
Project timeline
edit- July 2016: The Phase IV plan consisting of six new lines, including the Indigo Line, was created by the Delhi Metro Rail Corporation (DMRC).[4]
- December 2018: The Phase IV and the Indigo Line were approved by the Government of Delhi.[5]
- March 2019: Both the Phase IV and the Indigo Line were approved by the Government of India.
- April 2019: Land acquisition begins for the Indigo Line.
Train info
editIndigo Line | |
---|---|
Rakes | Alstom |
Train Length | 6 |
Train Gauge | 5 ft 6 in (1,676 mm) Standard Gauge |
Electrification | 25 kV 50 Hz AC through overhead catenary (OHE) |
Train's Maximum Speed | 100km per hour |
Train Operation | Delhi Metro |
See also
editReferences
edit- ^ a b "The remaining 3 corridors of the Delhi Metro Phase-4 Project will be completed by 2025 at the cost of Rs. 12,600 CR". Metro Rail News. 3 November 2021. Retrieved 27 May 2022.
- ^ "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 13 February 2024.
- ^ a b "Delhi metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
- ^ a b c d "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 12 February 2024.
- ^ a b "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
- ^ a b "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.